Real Options & Business Decision Making John Curtis.

Slides:



Advertisements
Similar presentations
1 Options. 2 Options Financial Options There are Options and Options - Financial options - Real options.
Advertisements

Chapter Outline Hedging and Price Volatility Managing Financial Risk
Chapter 17 Option Pricing. 2 Framework Background Definition and payoff Some features about option strategies One-period analysis Put-call parity, Arbitrage.
Session 3: Options III C Corporate Finance Topics Summer 2006.
Real Options Traditional capital budgeting analysis:
Risk Management & Real Options IX. Flexibility in Contracts Stefan Scholtes Judge Institute of Management University of Cambridge MPhil Course
Aswath Damodaran1 Session 19: The essence of real options Aswath Damodaran.
SESSION 20: THE ESSENCE OF REAL OPTIONS Aswath Damodaran 1.
1 (of 22) FIN 468: Intermediate Corporate Finance Topic 12–Real Options Larry Schrenk, Instructor.
Chap 3 Net Present Value.  Net present value is the single most widely used tool for large investments made by corporations.  Klammer reported a survey.
CHAPTER 14 Real Options.
Valuation of real options in Corporate Finance
Valuation of Financial Options Ahmad Alanani Canadian Undergraduate Mathematics Conference 2005.
WEMBA 2000Real Options26 Introducing Real Options What are Real Options? Expansion Options: Starsoft Inc. is considering expanding its internet software.
Chapter 11 Binomial Trees
Project Interactions, Side Costs, and Side Benefits 05/05/08 Ch. 6.
CHAPTER 13 Other Topics in Capital Budgeting Evaluating projects with unequal lives Identifying embedded options Valuing real options in projects.
Chap 5 Numerical Methods for Simple Options.  NPV is forced to treat future courses of action as mutually exclusive, ROA can combine them into a single.
Chapter 4 New Venture Strategy Copyright¸ 2003 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted.
FIN 453: Cases In Strategic Corporate Finance 1 REAL OPTIONS OLD FASHION IDEAS FOR NEW METHODOLIGIES IN CAPITAL BUDGETING.
FINA 522: Project Finance and Risk Analysis Lecture 12 Updated: 19 May 2007.
Real Options: Taking Stock and Looking Ahead Yong Li; Barclay E. James; Ravi Madhavan; Joseph T. Mahoney Advances in Strategic Management, 2007 BADM545,
Copyright © 2003 Pearson Education, Inc.Slide 17-1 Chapter 17 Real Options.
4. Project Investment Decision-Making
Corporate Valuation, , p. 1 Institut for Regnskab, Tom Hansen Last session: The 5 steps Workshop Dialogue and coaching Exercise 12.4 This lecture:
Three-way choice Option Price Option Value Real Options Calls & Puts Endogenous/Exogenous Option Price Option Value Real Options Calls & Puts Endogenous/Exogenous.
4.1 Option Prices: numerical approach Lecture Pricing: 1.Binomial Trees.
Option Theory and Housing Jeff Kelsh. Housing  Owning a house is a right and not an obligation, therefore it is an option.  Option to buy or rent 
Chapter 20 Basic Numerical Procedures
A First Look at Everything. Interest Rates and the Time Value of Money Time Value of Money ▫Imagine a simple investment opportunity with the following.
Key Concepts and Skills
FDI and New Venture Strategy: Real Option / Strategic Decision Trees Analysis Compiled by Ted Fu July 1, 2002 Adapted from Luenberger: Investment Science.
Chapter 1 Getting Started. Chap Getting Started  We take value creation as a company’s objective, through its investments in real assets.  On.
Days 8 & 9 discussion: Continuation of binomial model and some applications FIN 441 Prof. Rogers Fall 2011.
Drake DRAKE UNIVERSITY Fin 288 Valuing Options Using Binomial Trees.
Yale School of Management 1 Emerging Market Finance: Lecture 10: The Real-Option Approach to Valuation in Emerging Markets.
Days 8 & 9 discussion: Continuation of binomial model and some applications FIN 441 Prof. Rogers Spring 2011.
Interest Rates and the Time Value of Money Time Value of Money ▫Imagine a simple investment opportunity with the following cash flows (which are certain.
Real Options Modeling Options Prof. Luiz Brandão 2009.
18.1 Options, Futures, and Other Derivatives, 5th edition © 2002 by John C. Hull Numerical Procedures Chapter 18.
Real Options Discrete Pricing Methods Prof. Luiz Brandão 2009.
Investment Analysis and Portfolio Management Lecture 10 Gareth Myles.
1 Practical Problems in Capital Budgeting Lecture 3 Fall 2010 Advanced Corporate Finance FINA 7330 Ronald F. Singer.
14-0 Week 12 Lecture 12 Ross, Westerfield and Jordan 7e Chapter 14 Options and Corporate Finance.
Chapter 10: Options Markets Tuesday March 22, 2011 By Josh Pickrell.
CORPORATE FINANCE III ESCP-EAP - European Executive MBA 24 Nov a.m. London Project Appraisal-Dealing with uncertainty I. Ertürk Senior Fellow in.
8 - 1 Financial options Black-Scholes Option Pricing Model CHAPTER 8 Financial Options and Their Valuation.
12-1 Capital Budgeting and Financial Planning LECTURE 22 Course Instructor: M. Jibran Sheikh.
Sponsor: Dr. K.C. Chang Tony Chen Ehsan Esmaeilzadeh Ali Jarvandi Ning Lin Ryan O’Neil Spring 2010.
CMA Part 2 Financial Decision Making Study Unit 5 - Financial Instruments and Cost of Capital Ronald Schmidt, CMA, CFM.
Basic Numerical Procedures Chapter 19 1 Options, Futures, and Other Derivatives, 7th Edition, Copyright © John C. Hull 2008.
Venture Capital and the Finance of Innovation [Course number] Professor [Name ] [School Name] Chapter 21 Real Options.
A Cursory Introduction to Real Options Andrew Brown 5/2/02.
FIN 614: Financial Management Larry Schrenk, Instructor.
Chap 4 Comparing Net Present Value, Decision Trees, and Real Options.
Competing For Advantage
Real Options Thinking IOM580 Hiroshi Ochiumi 1. Traditional NPV Analysis Discounts future cash flows to their present value. In 1970, 57% of large corporations.
Dr. M. Fouzul Kabir Khan Professor of Economics and Finance North South University Lecture 5: Project Appraisal Under Uncertainty.
CAPITAL BUDGETING &FINANCIAL PLANNING. d. Now suppose this project has an investment timing option, since it can be delayed for a year. The cost will.
Lecture 03.0 Project analysis Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved McGraw-Hill/Irwin.
Contemporary Engineering Economics
1 CHAPTER 12 Real Options Real options Decision trees Application of financial options to real options.
FIN 614: Financial Management Larry Schrenk, Instructor.
© 2013 Pearson Education, Inc., publishing as Prentice Hall. All rights reserved.10-1 The Binomial Solution How do we find a replicating portfolio consisting.
Real Options Valuation of a Power Generation Project: A Monte Carlo Approach Bruno Merven ( 1 ), Ronald Becker (2) ( 1 )Energy Research Centre-University.
Risk Analysis, Real Options, and Capital Budgeting
Risk Analysis, Real Options, and Capital Budgeting
Real Options: Taking Stock and Looking Ahead
Introducing Real Options
Presentation transcript:

Real Options & Business Decision Making John Curtis

Introduction  NPV is dominant tool for evaluating projects and strategies today  Major flaw - cannot measure value of flexibility hence systematically undervalues project  Typically future configurations of project separately evaluated and one with highest positive NPV chosen  NPV is dominant tool for evaluating projects and strategies today  Major flaw - cannot measure value of flexibility hence systematically undervalues project  Typically future configurations of project separately evaluated and one with highest positive NPV chosen

Examples of Flexibility? Deferring Contracting Expanding Abandoning Staging Switching Deferring Contracting Expanding Abandoning Staging Switching

Why is Flexibility Valuable? It allows one to do something or not do something when such an action adds value or avoids loss of value

Flexibility Example Consider a situation where you have two alternatives: 1.Commit right now to a project that will cost $115m in 1 year with certainty but which will produce an uncertain value – a probability of either $170m (expected) or $65m (expected) 2.Wait the year before deciding to invest Consider a situation where you have two alternatives: 1.Commit right now to a project that will cost $115m in 1 year with certainty but which will produce an uncertain value – a probability of either $170m (expected) or $65m (expected) 2.Wait the year before deciding to invest

NPV of Alternative 1 NPV of project based on committing now = 0.5 x $170m x $65m - $115m _____________________ _____ = $100m - $106.5m = -$6.5m where project cost of capital is 17.5% and risk free rate is 8%. Therefore reject project. BUT flexibility of delaying decision not valued here so rejection may be wrong decision. NPV of project based on committing now = 0.5 x $170m x $65m - $115m _____________________ _____ = $100m - $106.5m = -$6.5m where project cost of capital is 17.5% and risk free rate is 8%. Therefore reject project. BUT flexibility of delaying decision not valued here so rejection may be wrong decision.

Decision Tree Approach - Alternative 2 t=0 Max[$170m-$115m,$0m] = $55m Max[$65m-$115m,$0m] = $0m q = q = 0.5 t=1 Temptation: Value = (0.5 x $55m x $0m) / = $23.4m (Compare with -$6.5m for Alternative 1) Problem: What is the correct discount rate?

What is Solution? Use option valuation methodology Call option : right but not obligation to acquire something by paying predetermined price (exercise price) by or within predetermined time Put option : right but not obligation to dispose of something for a predetermined price (exercise price) by or within predetermined time Use option valuation methodology Call option : right but not obligation to acquire something by paying predetermined price (exercise price) by or within predetermined time Put option : right but not obligation to dispose of something for a predetermined price (exercise price) by or within predetermined time

Options Pay-off diagrams : an option is exercised only if the option holder benefits Call Option Value Value of Underlying Asset Exercise Price Put Option Value Value of Underlying Asset Exercise Price

Call Option in Decision Tree t=0 Max[$170m-$115m,$0m] = $55m Max[$65m-$115m,$0m] = $0m q = q = 0.5 t=1 $115m$170m $55m

Payoffs and Flexibility Benefit State of nature Payoffs without flexibility (decision made at t=0 to spend $115m at t=1) Payoffs with flexibility (no decision made until t=1 whether to spend $115m) THESE ARE CALL OPTION PAYOFFS Flexibility benefit Up$170m-$115m = $55mMax[$170m-$115m,0] = $55m$0m Down$65m-$115m = -$50mMax[$65m-$115m,0] = $0m$50m

Real Options  Option to defer commitment to project with defined start-up date until the last possible moment - deferral option based on European call option.  Option to start project within specified period by incurring cost of start- up - American call option.  Option to abandon project for a fixed price - American put.  Option to expand project by paying defined amount to scale up operations - American call.  Option to contract (scale back) involvement in project by selling portion of it at set price - American put.  Option to extend life of project by expending specified amount - European call option.  Option to switch between two modes of operation (for example, on and off) by paying fixed associated costs of so doing - portfolio of put and call options.  Compound options which permit flexibility in sequential developments.  Rainbow options which permit multiple types of uncertainty.  Option to defer commitment to project with defined start-up date until the last possible moment - deferral option based on European call option.  Option to start project within specified period by incurring cost of start- up - American call option.  Option to abandon project for a fixed price - American put.  Option to expand project by paying defined amount to scale up operations - American call.  Option to contract (scale back) involvement in project by selling portion of it at set price - American put.  Option to extend life of project by expending specified amount - European call option.  Option to switch between two modes of operation (for example, on and off) by paying fixed associated costs of so doing - portfolio of put and call options.  Compound options which permit flexibility in sequential developments.  Rainbow options which permit multiple types of uncertainty.

Option Value Determinants VariableImpact of Increase on Value of Call Option Impact of Increase on Value of Put Option Value of underlying asset PositiveNegative Exercise priceNegativePositive Time to expirationPositive Volatility of asset valuePositive Interest ratePositiveNegative

Real Option Valuation USING RISK NEUTRAL PROBABILITY APPROACH This technique converts option payoffs into certainty equivalents such that they may be discounted at the risk free rate to calculate the net present value of a project which has embedded flexibility. USING RISK NEUTRAL PROBABILITY APPROACH This technique converts option payoffs into certainty equivalents such that they may be discounted at the risk free rate to calculate the net present value of a project which has embedded flexibility.

Real Option Valuation C 0 = [p.C u + (1-p).C d ] / (1+r f ) where  C u is up-state payoff=$55m  C d is down-state payoff=$0m  p=((1+r f )-d)/(u-d)  u=V u /V 0, d=V d /V 0  V 0 =value of underlying asset at t=0 (no flex)=$100m  V u =Up-state underlying asset value at t=1,=$170m  V d =Down-state equivalent=$65m C 0 = [p.C u + (1-p).C d ] / (1+r f ) where  C u is up-state payoff=$55m  C d is down-state payoff=$0m  p=((1+r f )-d)/(u-d)  u=V u /V 0, d=V d /V 0  V 0 =value of underlying asset at t=0 (no flex)=$100m  V u =Up-state underlying asset value at t=1,=$170m  V d =Down-state equivalent=$65m

Real Option Valuation u=V u /V 0 =$170m/$100m=1.7 d=V d /V 0 =$65m/$100m=0.65 r f =8% p=((1+0.08)-0.65)/( )= C u =$55m C d =$0m C 0 = [p.C u + (1-p).C d ] / (1+r f ) = [ x $55m + ( ) x $0m] / (1+0.08) = $20.9m This is value of project with flexibility Thus project is not rejected at t=0. Difference C 0 -NPV=$20.9m - (-$6.5m)=$27.4m is value of flexibility at t=0 u=V u /V 0 =$170m/$100m=1.7 d=V d /V 0 =$65m/$100m=0.65 r f =8% p=((1+0.08)-0.65)/( )= C u =$55m C d =$0m C 0 = [p.C u + (1-p).C d ] / (1+r f ) = [ x $55m + ( ) x $0m] / (1+0.08) = $20.9m This is value of project with flexibility Thus project is not rejected at t=0. Difference C 0 -NPV=$20.9m - (-$6.5m)=$27.4m is value of flexibility at t=0

Real Life  Even for simple put and call options, a much more expanded lattice of figures than the simple 1 period set in the above example must be calculated  Real life situations may involve quite complex decision trees with multiple options embedded  In some cases there may be multiple independent options in play simultaneously, e.g. simultaneous but independent options to contract or expand an activity  In other cases there may be multiple dependent options each of which comes sequentially into play only if another is exercised, e.g. for staged projects  Even for simple put and call options, a much more expanded lattice of figures than the simple 1 period set in the above example must be calculated  Real life situations may involve quite complex decision trees with multiple options embedded  In some cases there may be multiple independent options in play simultaneously, e.g. simultaneous but independent options to contract or expand an activity  In other cases there may be multiple dependent options each of which comes sequentially into play only if another is exercised, e.g. for staged projects

Real Life  Some situations may involve dependent options in a switching arrangement  Still other situations may involve options that are driven by more than one source of uncertainty, e.g. price, volume, interest rates  Some of the parameters used may need to be estimated using other complex techniques such as Monte Carlo simulation  Specialist analytical staff or access to outside expertise will be required  As for all matters involving some complexity, the methodology is unlikely to gain ready acceptability without the understanding and imprimatur of top management  Some situations may involve dependent options in a switching arrangement  Still other situations may involve options that are driven by more than one source of uncertainty, e.g. price, volume, interest rates  Some of the parameters used may need to be estimated using other complex techniques such as Monte Carlo simulation  Specialist analytical staff or access to outside expertise will be required  As for all matters involving some complexity, the methodology is unlikely to gain ready acceptability without the understanding and imprimatur of top management

Deferral Option

Compound Rainbow (a)

Compound Rainbow (b)

Compound Rainbow (c)