Original Bid to PPARC Shock Tests Target Tests at ISOLDE & ISIS Pion Optimisation Activation Heat Dissipation Distributions Target Station Design Safety.

Slides:



Advertisements
Similar presentations
Flexible Budgets and Standard Costs
Advertisements

1 Nia Sutton Becta Total Cost of Ownership of ICT in schools.
Electricity & Safety in the Home
GridSim:Java-based Modelling and Simulation of Deadline and Budget-based Scheduling for Grid Computing Rajkumar Buyya and Manzur Murshed Monash University,
Operations Management Maintenance and Reliability Chapter 17
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Win Big AddingSubtractEven/Odd Rounding Patterns Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Last Chance.
ITRS Factory Integation TWG
Doc.: IEEE /037r1 Submission March 2001 Khaled Turki et. al,Texas InstrumentsSlide 1 Simulation Results for p-DCF, v-DCF and Legacy DCF Khaled.
Towards Automating the Configuration of a Distributed Storage System Lauro B. Costa Matei Ripeanu {lauroc, NetSysLab University of British.
Reflections of Reference Practice: Analyzing Virtual Reference Transcripts Presented by Marie L. Radford and Lynn Silipigni Connaway 2007 ALISE Conference.
Energy policy and its implementation in Estonia Renewable energy Madis Laaniste, Energy Department.
Particle physics – the computing challenge CERN Large Hadron Collider –2007 –the worlds most powerful particle accelerator –10 petabytes (10 million billion.
Tony Doyle GridPP2 Proposal, BT Meeting, Imperial, 23 July 2003.
Wei Dai Technical Institute of Physics and Chemistry,
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
K. Kirch Search for the EDM at low ? Motivation Frozen spin technique High and low A compact storage ring experiment?
1 s Share 2 s Share 3 s Share settles with 1 for $200,000 (the limit of 1 s insurance policy) settles with 1 for $700,000 Fault allocation: =0%, 1 =50%,
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
West Elementary School May 16, % Construction Documents.
Convergence Technician Survey- 22 responses Does entry-level Convergence Technician add value to your company – 73% yes 27% no Do you employ people with.
Activity Based Costing: A Tool to Aid Decision Making
Inclusive ICT South Lanarkshires Experience. Project elements 1) Provision of basic ICT training in library Active IT centres for 1,000 people in the.
Presented by: Michael Cherkassky, Supervised by: Prof. Danny Raz.
Integrated Modelling of Electricity and Water Markets: A Progress Report From Canterbury S Dye, PR Jackson, R James, I Mahakalanda, A Pinto, JR Raffensperger,
Speaker Scott Whaley - EIT Protecting & Ice Melting Westmans Distribution Lines.
Energy Audit and Implementation in Practice in Residential Buildings Building Energy Efficiency in the Baltics (BENEFIT-2006) Riga, October 25, 2006 Petri.
Linear Automobile Depreciation
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
1 Sizing the Streaming Media Cluster Solution for a Given Workload Lucy Cherkasova and Wenting Tang HPLabs.
$ TOTAL INCOME 100 Quick Start 4 Within 30 Days of Start Date.
Making Landmark or Friendly Numbers (Multiplication)
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
Position-Time Graphs. POSITION (m) TIME (s) v = v = 2 m/s [E] v = Δd Δt v =
Proposal for a programme of Neutrino Factory research and development WP-3 The Target The Neutrino Factory Target Lead Author - J R J Bennett CCLRC, RAL.
Nuclear Physics Peer Review Processes 1.Objectives 2.Types of activities and relevant processes 3.New project /major upgrade 4.Project R&D 5.Exploitation.
Score My Team Bonus Program Best Practices – 12 Months.
10 Year Old Topic 2 9 Year Old Topic 4 8 Year Old Topic 5 8 Year Old Topic 6 7 Year Old Topic 7 7 Year Old Topic 8 6 Year Old Topic 9 6 Year Old Topic.
Group 7 XM SATELLITE RADIO. PRIMARY TARGET Primary Target: year olds Desired market young and tech friendly Car owners or in the market to purchase.
Grant Management Seminar 1 District 5930 Grant Management Seminar.
Solving Systems by Substitution
ACCESS Distance Learning providing Classroom Courses and Teachers via Technology For All Alabama Public High Schools Expansion III “The Next 100”
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
introducing Quantum Living
Powerpoint Jeopardy Category 1Category 2Category 3Category 4Category
New Energy Horizons Opportunities and Challenges Low Voltage Grid Connections for Electric Vehicle (EV) Infrastructure in Europe Presented by Philip LeGoy.
of products gives rise to revenue-allocation issues.
PPD H2020 Survey Stephen Intro 5’ Katie Her role 15’ ChrisAdditional support Katie (for Alex) UKRO role 10’ StephFinance perspective 10’ AllPPD interests.
Electricity cost risk modelling of the Energy Conservation Scheme (ECS) for the Gold mining industry of South Africa Lodewyk van der Zee
A Neutrino Factory Target Station Design based on Solid Targets J. R. J. Bennett STFC, Rutherford Appleton Laboratory, Harwell Science.
COMBINED HEAT AND POWER (CHP) FOCUS ON DISTRIBUTED GENERATION Stevens Institute of Technology Mechanical Engineering Department Prof. Siva Thangam Supported.
R&D Studies on Solid Targets in the UK J. R. J. Bennett Rutherford Appleton Laboratory
Mon Oct 27LC-ABD, Dundee1 Positron Target Prototype - Status Leo Jenner.
Location Planner A Decision Support System for the planning of shopping centers.
M. Tyndel, SPIDER proposal 1Aug 7 th, phone Schedule and resources  SPIDER has been streamlined to cover:  1) 1 submission ‘small pixel’ ISIS (vertexing/tracking.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
Initiative in the Target Sector J. R. J. Bennett CCLRC, Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, OX11 0QX, UK.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
UKNF 12 January 2005 Target Studies J R J Bennett RAL.
SEB Room Allocation Plan. Civil Engineering Lab Technician Offices Additive Engineering Research Labs Open Plan High Bay Sample Preparation Lab Chemistry.
Parameters of the NF Target Proton Beam pulsed10-50 Hz pulse length1-2  s energy 2-30 GeV average power ~4 MW Target (not a stopping target) mean power.
Shock Tests on Tantalum and Tungsten J. R. J. Bennett, S. Brooks, R. Brownsword, C. Densham, R. Edgecock, S. Gray, A. McFarland, G. Skoro and D. Wilkins.
ENG/BENE, ENG Plenary, 16 March 2005 The New UK Programme for Shock Studies J R J Bennett RAL.
Beam Dump outline work plan (UK perspective)
Chapter 22 Building Automation System Retrofit of Existing Systems
مدیریت استراتژيک منابع انسانی
Parameters of the NF Target
Physics-based simulation for visual computing applications
Ռազմավարական կառավարում
Presentation transcript:

Original Bid to PPARC Shock Tests Target Tests at ISOLDE & ISIS Pion Optimisation Activation Heat Dissipation Distributions Target Station Design Safety Total Cost £19.3M

PPARC Review Supported Shock Studies Allocated £650k

Costs, PPARC submission, August 2003, by Cranfield University £k RA188 PHD STUDENT40 TECHNICIAN, 50% OF EFFORT59 EQUIPMENT307 TOTAL COST600 Prof. N.K. Bourne RMCS, Cranfield3 months Prof. Alec Milne FGE3 months

Selected priorities: 1. Shock studies at Cranfield University – £600k 2. Dave Picton, from Birmingham University, for Heat Dissipation Distributions - £6k 3. Bennett – £34k 4. Tests on ISOLDE - £10k

WP3 Target Staff No./year SheffieldNew RA Measurement of parameters required for computer modelling of shock. 1 GlasgowNew RA Simulation of particle production, development of target scheme. 0.5 RAL-PPDEdgecock Oversight, development of test, prototyping and target activity 0.5 New RA Development of target scheme 0.5 RAL-ISISBennett Oversight of target work package 0.25 RAL-EDEngineering Mechanical/electrical design of test equipment 0.3 RMCSTechnician Implementation of parameter-measurement devices 0.5 COSTS £k Total staff Equipment (includes VAT) 300 Consumables (includes VAT)30 Travel50 Total Experiment at ISOLDE 10