FPLs Request for Recovery of the Costs Associated with the Seabrook Transmission Substations Pool Transmission Facilities NEPOOL Participants Committee.

Slides:



Advertisements
Similar presentations
10/22/20101 Westar Formula Rate and your bill. 10/22/20102 What we will be going over Transferring the results from the Westar Formula Rate to the SPP.
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
M A R K E T S D E V E L O P M E N T SWCT LICAP Zone Recommendation FERC Compliance Filing – July 2, 2004 NEPOOL Markets Committee June 23, 2004 Mark Karl.
MEPCO Update (11/15/07 revision) TC Meeting - November 16, 2007.
The Midwest ISO from a Transmission Owner Perspective.
Parallel Flow Visualization/Mitigation Proposal
NAESB Coordinate Interchange
Cost Recovery Working Group NANC Report Billing & Collection Working Group (B&C WG) January 19, 2005 Co-Chairs: Rosemary Emmer, Nextel Jim Castagna, Verizon.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
Ancillary Services Market, Day-Ahead Load Response and Special Case Nodal Pricing Implementation Vamsi Chadalavada FERC Technical Conference March 4, 2005.
SAS 70 Third Party Report on Controls Overview and Timetable Finance / Audit Committee Meeting Austin, Texas January 14, 2003/ February 18, 2003.
1 Presentation on the Cross-Boundary Municipalities Laws Repeal & Related Matters Amendment Bill, 19 February 2009 NCOP Select Committee, Parliament, Cape.
DECEMBER 17, 2013 | WESTBOROUGH, MA Reliability Committee & Transmission Committee & Markets Committee Capacity Zone Modeling Al McBride MANAGER, AREA.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
03/11/2013 MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Overview of Market Rule revisions.
Winter 2013/2014 Reliability Solution Including LNG MWHs N. Jonathan Peress Conservation Law Foundation Greg Lander Skipping Stone NEPOOL Markets & Reliability.
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
OCTOBER 8, 2014 Bob Laurita INTERNAL MARKET MONITORING New Import Capacity Resource FCM Market Power Mitigation Order to Show Cause Compliance Filing.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
GSPTF Schedule 13 Review for RTWG August 4-5, 2010.
October 30, 2014 Terry Wolf, Manager of Transmission Services.
SPP.org 11. SPP Delivery Point Addition (DPA) Process Effective May 1, 2010.
What’s New in Southern Companies’ OATT Southern Company Transmission 2008 Customer Forum.
Presentation to WECC Market Interface Committee March 24, 2015
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
Reno, NV June 26,  Agenda 1. Regulatory Filings Update 2. Integrated Resource Plan Update ◦ SB 123- NVision 3. Generator Interconnection Updates.
June 6, 2007 TAC Meeting NERC Registration Issues Andrew Gallo, Assistant General Counsel, Litigation and Business Operations ERCOT Legal Dept.
Topics to Cover Interconnection Process Overview
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Great River Energy 2015 Attachment O Annual Projected Rate Meeting October 31, 2014.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
STREAM 1B: SECTOR STRUCTURAL AND RESTRUCTURING ISSUES CLLR C JOHNSON, SALGA NEC ELECTRICITY DISTRIBUTION MAINTENANCE SUMMIT 9 JUNE 2008.
1 Westar Energy’s 2013 Annual Transmission Revenue Requirement Meeting October 30, 2012.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
October 23, 2015 Rochester Public Utilities Presentation on Formula Development of Transmission Revenue Requirements for 2016.
14 Jan 2004Market Operations Standing Committee1 Special Protection Systems: Operational and Compensation Issues.
Standards Review Subcommittee Update August 17, 2010.
1 Benefits of Transmission Ownership Bob Johnston CEO of MEAG Power.
SPP.org Transmission Expansion and Cost Allocations for FERC SPP-Entergy CBA 1.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
AEP PRESENTATION TO SPP MULTI-OWNER COMPENSATION TASK FORCE Presented July 8, 2004 Dallas, Texas.
1 Westar Energy’s 2016 Annual Transmission Revenue Requirement Customer Meeting October 27, 2015 Westar Energy’s Professional Development Center Topeka,
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
1 Westar Energy’s 2012 Annual Transmission Revenue Requirement Meeting October 25, 2011.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Willmar Municipal Utilities Annual Rate Update Meeting Wesley Hompe P.E. General Manager Friday, August 15,
November 16, 2012 Terry Wolf, Manager of Transmission Services.
Demand Response Use Case & Functional Requirements Development UCAIug Meeting Jan 6, 2009 Mark van den Broek.
Alliance Update Illinois Commerce Commission Electric Policy Committee July 10, 2001.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
Rochester Public Utilities Presentation on Formula Development of Transmission Revenue Requirements for 2016 October 23, 2015.
2016 Annual Attachment O Stakeholder Meeting Ameren Missouri
Rochester Public Utilities Presentation on Formula Development of Transmission Revenue Requirements for 2016 October 23, 2015.
Rochester Public Utilities Presentation on Forward-Looking Transmission Revenue Requirements Update for Calendar 2017 October 28, 2016.
Westar Formula Rate and your bill
2014 Annual Attachment O Stakeholder Meeting Ameren Missouri
2017 Attachment O Customer Meeting
2018 Attachment O customer meeting
Rochester Public Utilities Presentation on Forward-Looking Transmission Revenue Requirements Update for Calendar 2018 October 20, 2017.
Alternative ICAP Proposal
2016 Attachment O True-up customer meeting
Rochester Public Utilities Presentation on Forward-Looking Transmission Revenue Requirements Update for Calendar 2019 October 17, 2018.
Special Protection Systems: Operational and Compensation Issues
2017 Attachment O True-up customer meeting
Presentation transcript:

FPLs Request for Recovery of the Costs Associated with the Seabrook Transmission Substations Pool Transmission Facilities NEPOOL Participants Committee Meeting March 12, 2004

2 Background Seabrook Transmission Substation acquired and transmission line support payments assumed by FPL Energy (FPLE) in November 02 FPLE filed with FERC to transfer the substation to a transmission subsidiary in March 03 seeking EWG status FERC denied EWG status to a transmission subsidiary denies the request in May 03 FPLE files a request with FERC to transfer the assets to a division of FPL in June 03 FERC conditionally approved the transfer on 9/10/03 NH PUC determining degree of regulation over FPL FERC approved FPL NED NEPOOL Participant status as of 10/1/03

Map of NEPOOL Transmission System to be provided during Presentation

4 Seabrook Transmission Substation 345 kV transmission substation Highly Integrated with the NEPOOL Transmission System Used in the provision of regional transmission service continuously Permits delivery of Seabrook Generation Output & Station Service Switching point for three major 345 kV transmission lines Critical to operation of the NEPOOL Transmission System Major contributor to North – South Interface Transfer Capability Most difficult to schedule for planned outages Prior owners that were transmission providers recovered costs under NEPOOL OATT Other current owners, i.e. MMWEC, Hudson and Taunton, afforded cost recovery on an ongoing basis

5 Summary of FPLs Request: FPL seeks cost recovery of the Seabrook Transmission Substation PTF and related Transmission Support Expenses. As such, FPL requests that it be recognized as a Transmission Provider entitling it to cost recovery of the 88.23% share of the Seabrook Transmission Substation PTF Annual Transmission Revenue Requirements pursuant to the NEPOOL Tariff as others have been permitted.

6 Details of FPLs Request: Per RNA Sect. 15.1, FPLE and FPL request that FPL be deemed as if itowned FPLEs share of the Seabrook Transmission Substation effective Oct. 1, 2003 Such action would allow FPL to use the 3 months of FPLEs costs for purposes of calculating 2004 rates FPL seeks to begin recovery of its Seabrook Transmission Substation PTF costs, including the related Transmission Support Expenses per the Tariff - Attachment F Formula Rate effective on the latter of June 1, 2004, or the date upon which FPLE transfers the assets to FPL.

7 FPLs Request Complies With Existing RNA & NEPOOL Tariff RNA Sect approval provides ownership rights to FPL FPL qualifies as a Transmission Provider under the Tariff RNA Sect provides for FPL to receive a distribution of NEPOOL Tariff transmission service revenues Tariff – Attachment F provides for FPLs inclusion of the Seabrook Transmission Substation PTF costs, plus related Transmission Support Expenses No amendments to the RNA or NEPOOL Tariff are required to accommodate FPLs request.

8 NEPOOL Process FPL committed to working in good faith with NEPOOL FPL described in detail its request and objectives to the Tariff Committee and Transmission Settlement Subcommittee through its Briefing Paper and at a number of meetings in Jan. and Feb. TSS raised a number of concerns regarding implementation of FPLs request Tariff Committee approved a series of motions that recommend the Participants Committee approve FPLs request

9 Tariff Committee Conclusions TC concluded that RNA Sect does not preclude recovery of transmission support payments TC concluded that an amendment to Attachment F of the Tariff is not required for FPL to recover ROE TC concluded that FPL may recover its ATRR without a specific Zonal RNS Rate or a Network Load TC concluded that FPLs facilities constitute a Local Network TC recommended to the NPC that FPL be deemed the owner of the Seabrook Transmission Substation as of 10/1/03; that it be considered a Transmission Provider as of the same date; and that FPL be entitled to recover ATRR on the basis of FPLE Seabrooks Oct-Dec 2003 costs for rates effective 6/1/2004

10 FPLs Specific Requests of NEPOOL Participants Committee Approve request to deem FPL owner of Seabrook Transmission Substation effective Oct. 1, 2003 per RNA Sect Accept FPL as a Transmission Provider as of the same date Approve FPL as eligible to receive its prorata share of the transmission service revenues collected by ISO-NE per RNA Sect Approve that FPL be permitted to base its ATRR applicable to June 1, 2004 NOATT rates on the cost of the Seabrook Transmission Substation and Seabrook Transmission Support Expenses during the period 10/01/ /01/03; and that FPL be similarly allowed to compute ATRR for June 1, 2005 by including the costs of the Seabrook Transmission Substation and Seabrook Transmission Support Expenses for that period in 2004 prior to the transfer from FPLE to FPL taking place.

11 FPLs Specific Requests of NEPOOL Participants Committee Designate FPLEs share of the Seabrook Transmission Substation as FPLs Local Network for purposes of the NEPOOL Tariff To the extent the NPC agrees with the TC that FPL is not required to have Network Load, approve FPLs ATRR recovery to be achieved like municipals ATRR is recovered To the extent the NPC does not agree with the TC, then the NPC should specify that the Seabrook Station Service Load is FPLs Network Load and such load should be removed from other TPs load to prevent double counting

12 Conclusion FPL desires to recover the costs associated with these long standing NEPOOL facilities (Substation and 345 kV lines) through the NEPOOL OATT in the same way that previous owners recovered these costs and the other current Seabrook owners presently recover such costs. These transmission facilities are, and have been, a key part of the NEPOOL grid and are essential for the reliability of the NEPOOL transmission system. All of NEPOOL derives the benefits of these facilities. FPL respectfully requests approval by the NPC of its Section 15.1 requests.