ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS March 2008.

Slides:



Advertisements
Similar presentations
IR Confidential & Proprietary Do Not Distribute Our Proposed IT Strategy (2006 – 2011) Developing Optimal IT Strategy Through Business Context, Applications,
Advertisements

Tips and Resources IASC Cluster/Sector Leadership Training
Project L.O.F.T. Report May 2007 through October 2007 Creating a design to meet stakeholder desires and dissolve our current set of interacting problems.
Capabilities – What we can do for you. Dawsons Training is a part of The Dawsons Group of Companies which is one of Australias largest privately owned.
IBM Corporate Environmental Affairs and Product Safety
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Supporting National e-Health Roadmaps WHO-ITU-WB joint effort WSIS C7 e-Health Facilitation Meeting 13 th May 2010 Hani Eskandar ICT Applications, ITU.
Roadway Development Operators’ Workshop ACARP project C18023 CM2010 – Continuous Miner automation Dr David Hainsworth Dr David C. Reid 3-6 March, 2009.
Leading IT through People Sharm Manwani Alistair Russell Colin Thompson Leslie Willcocks.
1 Service Providers Capacity Assessment Framework Presentation to the Service Delivery Advisory Group August 28, 2008.
HR Manager – HR Business Partners Role Description
Working with the Teachers’ Standards in the context of ITE. Some key issues for ITE Partnerships to explore.
Standard 6: Clinical Handover
Research Update Automated Bolting and Meshing Project - C17018.
Lower Hunter & Central Coast Regional Environmental Management Strategy.
‘Feeder Blockage Removal Device’ Shane Phillips – Saraji Mine (BMA)
Back to Components High Capacity Underground Coal Mining (L15) A joint project (Scoping Study) between CSIRO Exploration & Mining and University.
ACARP KEY FINDINGS - DECEMBER 2006 BENCHMARKING STUDY Gary Gibson, ACARP.
Gregory Crinum Mine 1 Programmable Electronic Roof/Rib Bolter Controls History Old Controls Advantages Roof Mapping New Controls Summary.
ACARP Australian Roadway Development Improvement Project CM2010 IMPLEMENTATION STRATEGY August/September 2009 Guy Mitchell, BMA Coal Bob Miller, Centennial.
INDUSTRIAL & SYSTEMS ENGINEERING
IACT 901 Module 9 Establishing Technology Strategy - Scope & Purpose.
Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 ACARP PROJECT C17004 TOUGH SKIN – A SPRAY-ON POLYMERIC.
Assessment Activities
HEAnet Strategy TF-MSP 3 rd February 2009 Brian Boyle.
ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS September 2007.
Copyright © 2010 Accenture All Rights Reserved. 1 Copyright © 2010 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are.
Research Update Automated Bolting and Meshing Project.
ACARP Presentation Cutting A Smarter Metre Process optimisation techniques currently being utilised.
Copyright 2005 Welcome to The Great Lakes TL 9000 SIG TL 9000 Requirements Release 3.0 to Release 4.0 Differences Bob Clancy Vice President, BIZPHYX,
ROADWAY DEVELOPMENT IMPROVEMENT PROJECT
Advanced Technology for Progressing India's Underground Coal Mining Lisa Duncan August 2014.
Human Resource Development for the Central Pollution Control Board National Comprehensive Training Needs Assessment CPCB-InWEnt-GTZ/ASEM Concept for the.
Tom MAZOUR IAEA, Division of Nuclear Power
ACARP Australian Roadway Development Improvement Project ROADWAY DEVELOPMENT OPERATORS’ WORKSHOPS March 2009.
Service Transition & Planning Service Validation & Testing
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops September 2009 ACARP PROJECT C17004 UPDATE: TOUGH SKIN – A SPRAY-ON.
ACARP Australian Roadway Development Improvement Project Strategy Workshop April 2007.
EDI communication system
CISB444 - Strategic Information Systems Planning Chapter 3 : Developing an IS/IT Strategy: Establishing Effective Processes Part 2.
13/2/08 Fundamental Analysis of Development Cycles at Xstrata NSW Mines ACARP Roadway Development Operator Workshops March 2008.
ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for.
QUALITY MANAGEMENT STATEMENT
ACARP Roadway Development Operator Workshop No 7 A Systems Approach to Roadway Development Mick Kelly, BMA Coal.
ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS March 2007.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
CM2010 IMPLEMENTATION STRATEGY
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Results and Recommendations From Hammer Siler George & Our Local Stakeholder Engagement Process. March 2004.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
DEVELOPMENT OF THE ABM25 POST CRINUM March 2007 Doing the basics better - West Wallsend, Crinum and Ulan.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS August 2008.
Certificate IV in Project Management Assessment Outline Course Number Qualification Code BSB41507.
Certificate IV in Project Management Assessment Outline Course Number Qualification Code BSB41507.
Responsive Innovation for Disaster Mitigation Gordon A. Gow University of Alberta.
Interprofessional Learning Clinical Placement Toolkit Module: Capacity What type of placement can we offer? “Building and sustaining training in WA”
OHSAS Occupational health and safety management system.
Aviation Ground Handling Trailblazer Assessment Activity consultation Aviation ground operative Aviation ground specialist Aviation operations manager.
Training for organisations participating in Peer Review of Paediatric Diabetes.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Scoping Study Process  Survey of mines currently using gas drainage and/or Outburst Management Plans  Outburst Research Needs Workshop attended by 20.
Procurement Development Programs
The ILC Control Work Packages
(Additional materials)
MOSH Leading Practices Adoption System
Basic overview of an EMS
CEng progression through the IOM3
Presentation transcript:

ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS March 2008

ACARP Project C SAFETY ASPECTS OF VENUE  As advised by venue

ACARP Project C OBJECTIVE AND FORMAT Provide a forum for roadway development operators to:  Learn of emerging best practice and roadway development initiatives  Learn of developments in equipment and technology  Network with peers, and share their experience and learnings (and not just their successes)  Identify areas for targeted research

ACARP Project C FORMAT  5 presentations by operators detailing current operational practices together with one presentation giving an international perspective on roadway development  A number of research and technology updates by researchers  The presentations each comprise a minute presentation with a minute open forum for discussion and sharing of experiences and learnings  The research and technology updates each comprise a 20 minute presentation and a 10 minute open forum for discussion  Conclude with a review to capture key findings, identify opportunities to improve the workshop process, and to identify presentations for future workshops  Workshop report with copies of presentations to be provided to all participants

ACARP Project C INTRODUCTION Prerequisites for attendance:  A passion for roadway development, and  A willingness to participate in discussions and share experiences

ACARP Australian Roadway Development Improvement Project RESEARCH AND DEVELOPMENT STRATEGY March 2008 Glen Lewis, Xstrata Coal Bob Gordon, BHP Billiton Guy Mitchell, BMA Coal

ACARP Project C ROADWAY DEVELOPMENT R&D STRATEGY - 04/07  Following the March 2007 Roadway Development Workshops the RDTG developed a Roadway Development R&D strategy based upon input given by participants at those Workshops

ACARP Project C ROADWAY DEVELOPMENT R&D STRATEGY - 04/07  Immediate (1 year project)  “project management” systems for roadway development (including maintenance)  “fundamentals of roadway development” handbook  process model for development  management structure, style and skills;  functional specification for “CM 2010”  Medium term (2-4 years) - “CM 2010 project” (similar to LW project)  components that can be retrofitted to current generation machines  automated bolting system  alternate skin reinforcement and rib confinement  services  Longer term (+5 years) - “continuous mining system”  integrated system incorporating cutting, loading, conveying, support, and logistics flowing on from CM 2010 project

ACARP Project C KEY ELEMENTS - CM2010 R&D STRATEGY  Later in 2007 we attempted to develop a model which demonstrated the relationship between key elements of the CM2010 R&D strategy as it became known as

ACARP Project C ACARP FUNDING 2008  Pleasing to advise that a number of roadway development related R&D projects have been funded by ACARP commencing 2008 following recommendations made by the RDTG, including development of:  A polymer based alternative skin reinforcement and confinement system - to eliminate the installation of steel mesh and, in conjunction with SDB, allow operators to be removed from the immediate face area while improving roadway development performance  An automated system for installing SDB and mesh, including an integrated logistics and materials handling system from the supplier to the face - to similarly remove operators from the immediate face and improve roadway development performance  A simulation model to enable the limitations of current development processes to be understood, and to evaluate potential roadway development technologies and practices before committing scarce resources to pursue development and/or conduct field trials  A handbook to capture the industry’s current “body of knowledge” of roadway development practice for future generations

ACARP Project C CM2010 R&D STRATEGY - MARCH 2008  The RDTG has continued to develop the CM2010 R&D strategy to provide the framework for an integrated approach to developing a new generation high capacity roadway development system  Now like to share the strategy with you and invite your review and critique

ACARP Project C KEY STRATEGIES – CM2010  Develop “self-steering” technologies and systems that enables mining equipment to mine roadways in accordance with predetermined survey controls and to maintain both azimuth, horizon and grade control within a variable seam horizon, and to totally automate the cutting and loading cycle (including mining breakaways) thus enabling equipment to be remotely supervised  Will require a combination of fundamental and applied research building upon Highwall Mining and Longwall Automation technologies  CSIRO Queensland Centre for Advanced Technologies has demonstrated capabilities  Key R&D element over next 2-3 years

ACARP Project C KEY STRATEGIES – CM2010  Develop technologies and systems that enables face services to be extended within the 3 minute cut, load support cycle and without direct operator involvement  One monorail system currently being reinstalled at Mandalong with recent orders placed for 2 new monorail systems  Expected to be largely driven by mine sites, with support from and feedback to RDTG  Will predominantly require operational improvement to apply existing technologies with some applied research required to automate installation of monorails and integrate into a remotely supervised, high capacity mining system

ACARP Project C KEY STRATEGIES – CM2010  Develop systems that enables the automated installation of conventional resin anchored bolts and self drilling bolts, and to feed bolts and mesh to the installation hardware without direct operator involvement  Will require a combination of fundamental and applied research  UOW recently awarded ACARP funding to pursue this initiative  Joy have prototype carousel bolter and Sandvik have operational carousel bolters (metaliferous sector) that could provide basic equipment platform, whilst CSIRO has developed a range of technologies for the ACBM that could potentially be applied  Key R&D element over next 2-3 years

ACARP Project C KEY STRATEGIES – CM2010  Develop alternative skin reinforcement and confinement technologies and systems that eliminates the installation of roof and rib mesh and provides an enhanced roof and skin reinforcement medium  Will require a combination of fundamental and applied research  UOW recently awarded ACARP funding to pursue this initiative  Initial research shows considerable promise (refer Chris Lukey’s presentation)  Key R&D element over next 1-2 years

ACARP Project C KEY STRATEGIES – CM2010  Demonstrate, adapt and refine continuous haulage technologies and systems currently being used overseas for use in Australian longwall mines, and subsequently combine suitable coal clearance technologies into an integrated, remotely supervised high capacity mining system  Two continuous haulage systems currently being installed or commissioned in Australian mines, with a third system expected to be ordered mid 2008  Expected to be largely driven by mine sites, with support from and feedback to RDTG  Will predominantly require operational improvement to apply existing technologies with some applied research required to integrate into a remotely supervised, high capacity mining system

ACARP Project C KEY STRATEGIES – CM2010  Develop technologies and systems that enables panel services to be advanced on a continuous basis in parallel with mining operations or alternatively, within scheduled maintenance windows  Expected to be largely driven by mine sites, with support from and feedback to RDTG  May require some applied research to develop extensible conveyors and integrate major services (H/T power reticulation, transformers, etc) into a services management system  May also require some applied research to develop more efficient mine compliant services (eg; pipework)

ACARP Project C KEY STRATEGIES – CM2010  Develop mine logistics systems that enables mining and maintenance supplies and consumables to be delivered to the immediate mining area at a rate consistent with a 3 minute cut, load support cycle.  Logistics systems should similarly enable materials and equipment required for panel infrastructure and services to be delivered to the mining area at a rate consistent with a 200 m per day advance rate  Expected to be largely driven by the yet to be determined design of the primary mining equipment, and mine specific parameters  Therefore expected to be driven by mine sites, with support from and feedback to RDTG  May require some applied research to develop a mechanised, extensible supply system, and for overall system integration  Expected to draw upon logistics systems expertise from other industries

ACARP Project C KEY STRATEGIES – CM2010  Develop technologies and systems that enables high speed haulage roadways to be constructed and maintained without impacting the continuity of face operations  Expected to draw upon roadway and pavement construction and maintenance expertise from other industries  Expected to be largely driven by mine sites, with support from and feedback to RDTG

ACARP Project C KEY STRATEGIES – CM2010  Develop strategies to improve engineering availability of equipment and enable equipment to operate at design rates (10 MPOH) for 20 or more hours per day  Expected to be largely driven by mine sites with strong support from OEM sector  Industry wide coordination will be necessary to improve overall engineering competency standards across the industry and to ensure industry wide standards are developed and adopted. Hence anticipate continuing support from and feedback to RDTG

ACARP Project C KEY STRATEGIES – CM2010  Develop pre-mining systems, including gas drainage, seam dewatering, and the detection and pre-treatment of faults and other geological anomalies, to enable a safe, compliant and productive mining environment to be maintained  Expected to include a combination of fundamental and applied research, together with a major operational improvement component at a mine site level  CSIRO Queensland Centre for Advanced Technologies and CRC Mining have demonstrated research capabilities in this field  Anticipate that specialist service providers (eg; drilling contractors) will also have significant input into developing industry wide capabilities

ACARP Project C KEY STRATEGIES – CM2010  Develop hazard management and safety compliance systems to enable sustained high performance levels to be achieved, including gas content testing, the detection and location of geological structures, and the management of variable strata conditions  Expected to include a combination of fundamental and applied research, together with a major operational improvement component at a mine site level  CSIRO Queensland Centre for Advanced Technologies and CRC Mining have demonstrated research capabilities  Anticipate that specialist service providers (eg; geotechnical consultants) will also have significant input into developing industry wide capabilities

ACARP Project C CM2010 CRITIQUE  Later today we will invite your feedback and critique on the CM2010 project including  What improvements could we make to the CM2010 Research and Development strategy?  Any champions interested in being involved at a R&D, OEM or mine site level?  We would also ask that you take the CM2010 Research and Development strategy document back to site, whether it be a mine, workshop or laboratory, and to share it with your colleagues and give feedback directly to the RDTG via Gary Gibson

ACARP FUNDAMENTAL ANALYSIS OF DEVELOPMENT CYCLES AT XSTRATA NSW MINES Richard Porteous, Xstrata NSW

ACARP IMPROVING ROADWAY DEVELOPMENT PERFORMANCE AT ULAN Ben Smith, Ulan

ACARP MORNING TEA

ACARP ROADWAY DEVELOPMENT AND THE INTRODUCTION OF HILTI SELF DRILLING BOLTS AT BROADMEADOW Matthew Jones, Broadmeadow

ACARP SELF DRILLING BOLT UPDATE Peter Gray, Ground Support Services

ACARP THE NEWSTAN/MANDALONG MONORAIL SERVICES MANAGEMENT SYSTEM Ray Coppins, Newstan/Mandalong Scott Jensen, Macquarie Manufacturing

ACARP LUNCH

ACARP EVOLUTION OF GATEROAD DEVELOPMENT IN THE PITTSBURGH NO 8 SEAM (USA) Brian Thompson, Joy Mining Machinery

ACARP RESEARCH UPDATE - ALTERNATIVE SKIN REINFORCEMENT PROJECT Chris Lukey and Jan Nemcik, UOW

ACARP RESEARCH UPDATE – AUTOMATED BOLTING AND MESHING PROJECT Stephen Van Duin, UOW

ACARP AFTERNOON TEA

ACARP ROADWAY DEVELOPMENT AT CRINUM Martin Zgrajewski, Crinum

ACARP FUTURE DIRECTIONS – CM2010 PROJECT Glen Lewis, Xstrata Coal Bob Gordon, Centennial Coal Guy Mitchell, BMA Coal

ACARP Project C CM2010 CRITIQUE  What improvements could we make to the CM2010 Research and Development strategy?  Any champions interested in being involved at a R&D, OEM or mine site level?

ACARP Project C VISION - CM2010 An integrated, remotely supervised high capacity roadway development mining system that enables 15 Mtpa longwall mines to be established and sustained with a single mining unit. The system will also enable mining to be safely undertaken under adverse or extreme mining conditions, thus opening up access to reserves previously considered unminable

ACARP Project C MEASURES - CM2010  A sustained performance rate of 10 metres per operating hour (MPOH) for 20 hours per day, based on installing primary support of 6 roof and 2 rib bolts per metre advance together with roof and rib confinement measures (mesh)  Improved health and safety through reduced exposure to hazards in the immediate face area

ACARP Project C GOALS - CM2010 By end 2010, demonstrate key enabling component technologies that will form the basis of an integrated high capacity mining system, eg; remote operation of the continuous miner, automated self drilling bolts and mesh installation, continuous haulage, integrated panel services By end 2010, establish programs that enable the key organisational and technical competencies required to support a high capacity mining system to be developed throughout the industry, eg; improved engineering availability, people behaviour and skills, and planning, organisation and process control By end 2011, improve industry roadway development performance to current industry best practice levels of 5 MPOH for 12 or more hours per day By end 2012, demonstrate an integrated, remotely supervised high capacity roadway development system Progressively reduce the physical demands on personnel engaged in the development process and reduce their exposure to workplace hazards

ACARP Project C KEY OBJECTIVES - CM2010  A high capacity roadway mining and support system capable of 1 metre roadway advance cycles in 3 minutes, with all functions of the system remotely supervised without personnel in the immediate face area  A coal clearance system that enables the mining and support system to achieve the target cycle times, without impacting the ability to service and support that (mining and support) system  A panel advance system that enables services to be advanced without impacting operation of the mining, support and coal clearance systems  A mine logistics system that ensures on-time delivery of mining and maintenance supplies and consumables, and panel infrastructure and services. The system also includes the construction and maintenance of roadways to facilitate the rapid distribution of personnel, materials, and equipment  Pre-mining systems that remove potential impediments to high performance levels, including gas drainage, seam dewatering, and the location and pre- treatment of faults and other geological anomalies

ACARP Project C KEY OBJECTIVES - CM2010  Mine design systems that optimise the high capacity roadway development system,  Significant improvements in engineering availability and reliability levels through improved equipment specification, design, pre-manufacture simulation and equipment manufacture, and improved operating and maintenance standards  Development of people’s behaviour and skills to better lead, communicate, plan, supervise, operate and maintain technologically complex systems and equipment  Hazard management and safety compliance systems that enable sustained high performance levels to be achieved  Process management tools that enable sustained performance levels of 200 m per day of roadway development to be achieved Development of mining and ancillary equipment that reduces the exposure of personnel to work place hazards, eliminates manual handling, and improves ergonomics

ACARP Project C CM2010 CRITIQUE  What improvements could we make to the CM2010 Research and Development strategy?

ACARP Project C WORKSHOP CRITIQUE  What improvements could we make to the structure and format of the Workshop:  Suitability of location, venue and facilities?  Timing (eg; day of week, and actual times)  What issues should be the subject of future workshops?  Any volunteer presenters?  Anything else?

ACARP Project C END OF WORKSHOP Thank you! Please join us for some for refreshments and further networking!