Cyclotron Refurbishing & Development Meeting March 6, 2008.

Slides:



Advertisements
Similar presentations
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété
Advertisements

A. Denker, C. Rethfeldt, J. Röhrich, Helmholtz-Zentrum Berlin, Protons for Therapy Reliability of the Facility for Proton Therapy of the Helmholtz-Zentrum.
Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
Development of the FLNR Cyclotron Complex /2009 Priority 1 Dubna,
Overview of Fermilab Accelerator Complex and Beam Lines T. Kobilarcik FNAL.
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
Ultimate Storage Rings PEP-X and SPring-8 II R. Hettel for the PEP-X design team and T. Watanabe et al., SPring-8 FLS 2012 JNAL March 7, 2012.
FEL and linac plans at MAX IV laboratory
Mitglied der Helmholtz-Gemeinschaft Beam Cooling at HESR in the FAIR Project 12 th September 2011 Dieter Prasuhn.
Mats Lindroos Will we ever do a beta-beam design study beyond the present CERN-Frejus baseline? Mats Lindroos.
Brookhaven Science Associates U.S. Department of Energy Todd Satogata 1 Fri May RHIC FY03 Deuteron-Gold Performance n RHIC Deuteron-Gold Performance.
SUPERCONDUCTING RF (SRF) SYSTEMS Peter McIntosh (STFC) Accelerator-driven Production of Medical Isotopes 8 th – 9 th December
ISIS Accelerator Division
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Richard Pardo Argonne National Laboratory ATLAS Operations ATLAS User’s Meeting August 14, 2009.
Proton Linac, Workshop, December 3 rd - 4 th, 2007 The FAIR Proton Linac Outline Requirements to Proton Linac Source, RFQ, DTL, RF Beam Dynamics.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
10-Year Vision: expanded RIB program with: three simultaneous beams increased number of hours delivered per year new beam species increased.
PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
F Project-X Related Issues in Recycler A.Burov, C.Gattuso, V.Lebedev, A.Leveling, A.Valishev, L.Vorobiev Fermilab AAC Review 8/8/2007.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Radioactive Ion Beams CW 0.5 MW (for protons) 1 GeV (for protons) p to U Chiara, Manuel, Adam, HuiMay 2011, CAS, Bilbao.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
J-PARC Accelerator and Beam Simulations Sep. 7th, SAD2006 Masahito Tomizawa J-PARC Main Ring G., KEK Outline of J-PARC Accelerator Characteristics of High.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
Accelerators and Sources Report from Discussion Session Jose Alonso 1.
ARIEL Building Pierre Bricault. Proton Beam specification The proton beam energy must be between 450 to 500 MeV. 200 µA with proton beam intensity losses.
Cyclone 70 IBA Radiopharma’s high energy, high current cyclotron.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
Improved performance of Variable Energy Cyclotron(VEC) Variable Energy Cyclotron Centre Kolkata P S Chakraborty, B Ch Mandal, S K Thakur, M Das, S Som,
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Ion Accelerator Activities at VECC
MLL Workshop on Future Science 2019 and beyond, 16.Dec.2015 The accelerator, as seen by.. 1 From LBNL Image Library Collection by Dave Judd and Ronn MacKenzie.
Primary Design Parameters July 13,2001 S. Childress Page 1 NuMI Besides design specifications driven by physics and Main Injector beam parameters, significant.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Report Technical Director Storage-Ring-Installation Completed
Preparation Phase of the FAIR Project
NICA injection complex status
A. Martynov on behalf of accelerator division.
Uppsala Commitment to ESS and FREIA Planning
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Hosting Orsay Walid KAABI
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Revised Commissioning Strategy
Physics Design on Injector I
(Beam) Commissioning Plan
Presentation transcript:

Cyclotron Refurbishing & Development Meeting March 6, 2008

Outline 5-year plan process Accelerator development program Cyclotron refurbishment Cyclotron high intensity upgrade Plan for extracted beam instabilities measurements (L. Root) New results for extraction considerations (G. Dutto, Y. Rao)

5-Year Plan Preparation 5-Year Plan Steering Committee is guiding the process Details are described at TRIUMF web page: Plan will be reviewed by a number of external committees: –Mar 14-15, 2008: Policy and Planning Advisory Committee (PPAC) MeetingPolicy and Planning Advisory Committee –Mar 25-26, 2008: "Special" Experiments Evaluation Committee (SEEC) Meeting"Special" Experiments Evaluation Committee –Mar 27-28, 2008: Halo Nuclei WorkshopHalo Nuclei Workshop –Apr 3-4, 2008: Accelerator Advisory Committee (AAC) MeetingAccelerator Advisory Committee –Apr 3-4, 2008: Life Sciences Projects Evaluation Committee (LSPEC) MeetingLife Sciences Projects Evaluation Committee –May 9-10, 2008: Advisory Committee on TRIUMF (ACOT) MeetingAdvisory Committee on TRIUMF –Sep 24-26, 2008: (NRC) International Peer Review Committee Meeting Short descriptions of proposed projects ready for PPAC:

Science needs for accelerators upgrade 1.More proton beam to existing facilities Meson Hall 1A: 110 μA μA ISAC 2A: 75 μA μA STF 2C: 60 μA μA 2.More beams to ISAC users New proton beam line 4N: 100 μA 50 MeV electron linac as a new driver for exotic beams Two new actinide target station Low energy separators and switchyard New chain of accelerators: RFQ, DTL, low beta SC linac

Requirements to the cyclotron Reliability (low downtime) Quality (stable beams of required parameters at production targets) High intensity (up to 450 μA) Maintainability (low beam losses) Efficiency (reproducibility, easy tuning and control)

Cyclotron beam physics issues Injection –High intensity low emittance ion source –Space charge problems at injection –Beam tune reproducibility Cyclotron centre region –Vertical focusing –Longitudinal acceptance –Collimation –Beam losses (heating power) Acceleration –Machine instabilities –Resonances –Beam tune reproducibility –Beam losses (radiation exposure)

Cyclotron beam physics issues (continued) Extraction –Shadow mode extraction –Multiple energy extraction –Extraction foils studies and 7Be contamination –Beam intensity stabilization –High intensity (up to 200 μ A) extraction to Beamline 2A –Beam losses –Beam quality at ISAC production target New Beamline 4N –Achromatic beam transport –Beam losses –Beam quality at ISAC production target BL1A (Meson Hall) –Low loss tune down to TNF –Beam dump full capacity exploitation (up to 300 μA?)

To be refurbished (replaced) Vault re-cabling Main magnet power supply Trim-and-Harmonic coils power supplies Main magnet and RF high voltage transformers, feeder and breakers BL4 front end BL1A components (Q14-Q16 triplet) Injection line vacuum (cryo-pumps for turbo- pumps replacement)

New developments 10 mA H- ion source (I3) Water cooled cyclotron probes, flags RF intermediate power amplifier (IPA) Additional beam diagnostics Extracted beam intensity stabilization Injection energy stabilization

Upgrades Main RF system (50% more power) Injection Line (high intensity) Cyclotron extraction and diagnostic probes Cyclotron and beam lines vacuum controls Centre region cooling Main controls infrastructure Dee voltage stabilization

Resources request Accelerator staff: employees Operational budget: 2 M$/year Refurbishing budget: 7 M$ E-linac: 20 M$ Beam line 4N: 5 M$ Target stations: 12 M$ ISAC-III front end: 11 M$ Buildings: ?

ISAC-III overall timeline installacquiredesigncomm installacquiredesigncomm installacquiredesign installacquiredesign installacquiredesign comm installacquiredesigncomm installacquiredesigncomm installacquiredesigncomm Design Tunnel, cave Grade level installacquiredesigncomm Develop conceptcommDevelopAcquire installacquiredesign concept design, acquire Design Install comm installacquiredesign installacquiredesign installacquiredesigncomm installacquiredesigncomm installacquiredesigncomm Control Room