Basic Setting Out.

Slides:



Advertisements
Similar presentations
LOGO APPLICATION OF A PARCEL. Agenda APPLICATION FOR PROJECT BUILDING OPERATIONS 1 ) Without help account application APPLICATION OF A PARCEL -- How can.
Advertisements

Geometry Point Line Line segment Ray Plane Parallel lines
Sectional Assembly and Installation
Interior Wall and Ceiling Finish
Access BDD Survey School
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Pattern Layout, Pinning & Cutting
Split Sole 45 Degree Raker
Framing Agriculture Structures
Direct Method Presentation
C. Dittmer Sept Girl’s Lacrosse Field Dimensions NOTE: While most dimensions of a girl’s field are flexible, the distance between the Restraining.
How To Mark a Field. 4 May 06, Ver. 1.5How To Mark a Field2 Tools Required A long (150 yards) accurate tape measure with a ring on one end. A long (150.
14 Ventilation Skill Drills. 2 Objectives (1 of 2) Break glass with a hand tool. Break a window with a ladder. Break windows on upper floors using the.
Wall plate should measure the insertion point height plus 30” to accommodate a 30” cleat. The 30” cleat receives 20 X 16d nails. Cut the wall plate and.
Safe Use of Agricultural Mechanics Hand Tools
From Isometric Drawings to Plans and Elevations
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Solid Sole 60 Degree Raker
Set out masonry structures
Hip Rafters • Hip Jack Rafters • Constructing Hip Roofs
Connecting crank and pivot shaft assemblies. Press fits, or interference fits are sometimes used in manufacturing to reduce manufacturing costs or liabilities.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Hand-cranked Windmill Assembly Instructions copyright Mechanical Kits Ltd
CONSTRUCTING A FIVE CABIN LATRINE
Geometry and Measurement
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Pyramid Construction Pyramids Square Rectangle Hex Cone.
1. b. Rip Saw 2. d. Used for cutting with the grain.
Reading a Tape Measure. Countries that have not officially adopted the metric system Myanmar, Liberia and the United States.
ENTC 1110 OBLIQUE PICTORIALS.
Square Pyramid (cut). Cut Square Pyramid - Problem The given views show the Front Elevation and unfinished Plan of a cut square pyramid. Draw the following.
Left side Right side Note pad Roll block. The Plan.
Surfacing Rough Lumber Woodworking 2,3,4. Materials Surfacing Rough Lumber Worksheet Tape Measure Square –Combination –Tri-Square Scrap Lumber.
f30 G1 G A a F B E C D T F A1 A G G1 B C G A 50 G1 A1
RAKING MOULDS by Greg Cheetham. Start with an original mould with square corners as it will sit in the square corner of the side wall and raked ceiling.
7.3 Similar Right Triangles Geometry. Objective(s)  Students will understand geometric concepts and use properties of the altitude of a right triangle.
Ventilation Skill Drills.
Slide 1 Copyright © 2015, 2011, 2008 Pearson Education, Inc. Lines and Angles Section9.1.
{ MAKING ENVELOPES BY BY Mrs. Surekha B. Mali Mrs. Surekha B. Mali.
Gingerbread House Construction Instructions graham crackers 2.Knife 3.Cutting board 4.Hot glue gun 5.Base for house (paper plate)
Cut Cones. At the end of this unit you will be able to: Identify a Cone and draw orthographic views of Cones with cut surfaces. Project a cut surface.
Square Plant Stand. TOOL: Radial Arm Saw NEXT STEP: Surface Planer RESULTS: Rough size pieces for 4 Legs. 33” long PROJECT Square Plant Stand PART Legs.
Lean Notes Page. Lean Notes What are the four things that need to get written on the reference edge ?_______ ______ ______ ______ This written information.
Building Boxes What is the largest volume open top box that you can build from an 8 ½ by 11 inch sheet of paper?
Parallel Lines and Transversals. What would you call two lines which do not intersect? Parallel A solid arrow placed on two lines of a diagram indicate.
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
Safe Use of Agricultural Mechanics Hand Tools
9 Multiview Drawings Permission granted to reproduce for educational use only. © Goodheart-Willcox Co., Inc. Understand the principles of orthographic.
GOVERNMENT ENGINEERING COLLEGE
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
CIVIL DEPRTMENT  Introduction :  The process of laying out engineering projects by placing pegs Or marks at the site of works is known as setting out.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Mezzanine Build Plans.
Mr. Vedprakash Maralapalle, Asst. Professor
Stringing your car to determine wheel alignment is decidedly old school, but it's also effective, efficient and cheap. Begin by placing your car in a level.
Geometry Point Line Line segment Ray Plane Parallel lines
Hand-cranked Windmill Assembly Instructions
9.1 Similar Right Triangles
Geometry Point Line Line segment Ray Plane Parallel lines
Geometry Point Line Line segment Ray Plane Parallel lines
Optimization Chapter 4.4.
Rafter Marking Information Technology and Communication Services
Building a Nightstand Woods 1 Final Project Step #1
8.1 Parallel Lines.
Rectangular Coordinates Level control in trenches
8.2 Perpendicular Lines.
Reading a Tape Measure.
Laying out the Foundation
2 POINT PERSPECTIVE.
Properties of Transversal Lines
Presentation transcript:

Basic Setting Out

Determining the Building Line A building square is positioned against the rear of the kerb, beyond the corner mark indicated on the kerb. The dimension is then taken from the back edge of the kerb keeping the tape running parallel with the builders square. A wooden peg is then driven into the ground and the exact dimension is marked by a nail in the top of the peg. Corner of building marked on kerb X End of tape against back edge of kerb X

Determining the Building Line Positioning peg Z can be done in the same way as peg X making sure that it is positioned beyond the length of the building. Z X

Determining the Building Line Once pegs X and Z have been positioned a Ranging line is fastened to the two nails in the pegs. The ranging line needs to be pulled taut between the pegs as this indicates the Building Line. Z X

Establishing the corner of the building. A line is then extended along the edge of the builders square and beyond the building line where the two lines intersect determines the front corner of the building. Z Builder's square positioned against kerb and aligning with the corner of the building mark on the kerb. X

Establishing the corner of the building. A peg (A) is driven in at the intersection of the lines and a nail in the top of the peg identifies the exact position of the intersection. This denotes the front corner of the building. Z A X A

Establishing the width of the building Z The dimension for the width of the building is measured from the nail in the top of peg A. Peg B is driven in at the required measurement. The exact measurement is identified by a nail in the top of the peg B. B A X Note. For accuracy keep the tape taut.

Setting out a right angle (corner of the building). Y Z B A Positioning Peg Y A builders square is positioned against the building line and lined up with the nail in the top of peg A a line is then pulled out to peg Y the line is to run parallel with the square creating a right angle. Peg Y is positioned beyond the required measurement of the building. X

An alternative method of setting out a right angle is to use the 900 4m 3m

Identifying the dimension for the side of the building Z C B A A measurement is then taken to identify the width of the building a peg (C) is then driven in the exact measurement is then identified by a nail in the top of the peg. When peg C is positioned pegs X, Y and Z can be removed. X

Identifying the position of the final corner B Check the dimensions of the side of the building ( A-C). Transfer the measurement to the other side to (B-D) Drive in a temporary peg. A

Identifying the position of the final corner B Check the dimensions of the front of the building (A-B) then transfer the measurement to the rear this allows peg D to be positioned a nail can then be put in at the required measurements. A

All four corners of the building are now positioned

Checking the diagonals B Measure and note the diagonal measurement (A-D). Now measure diagonals (B-C) and check against the (A-D) measurement. If the dimensions match this indicates that the corners are at right angles and the building is square. A

Checking the diagonals If one of the diagonals is longer than the other, the back two peg positions (C-D) will to be adjusted. Note large adjustments may require additional pegs to be located adjacent to pegs (C-D). B A

Checking the diagonals Small adjustments can be made by moving the nail/screw in the top of the peg. Move nails/screws by the same amount, in the same direction, to maintain the overall Dimension.

Checking the diagonals Correct setting out will indicated by identical diagonal dimensions. Check all dimensions are correct. All surplus pegs are removed, leaving the four corner pegs indicating the building position. B A

Building Position Four corner pegs indicating the building position.

Profile Boards Foundation Walling Overall widths of foundation trenches and walls are identified on profiles. The pegs are positioned on the inside of the profile board cross pieces. This prevents the line tension pulling the cross piece from the pegs.

Profile Boards Partly driven nails in the top of the cross piece Identify the wall and trench marks. But as an alternative to this saw cuts can be made into the cross piece.

Position of Corner Profiles Profiles should be positioned approximately 1.500m minimum away from the edge of the trench. The distance may need to be increased if a mechanical excavator is to be used for the excavation. 1.500 Min The cross pieces should be kept level. Future Foundation Excavation

Profile Boards Once the profiles are set the ranging line needs to be extended from the corner pegs and marked on to the profile.

The completed setting out on profile boards.