Trends in North American UVM Trends in North American Utility Vegetation Management (UVM) William Porter Principal Author of CN Utility Consulting Utility.

Slides:



Advertisements
Similar presentations
RISK MGMT. Risk Inspection Risk Assessment Risk Analysis LET US CREATE A VALUE FOR BETTER TOMORROW RISK MANAGEMENT : TODAYS BUSINESS ESSENTIAL Our Strength.
Advertisements

June 25, 2009 Prepared by D. Davis and C. Burden – Williams Gas Pipeline 1 North American Energy Standards Board Capacity Release Modifications Summary.
Transport Study to support an impact assessment of the Urban Mobility Package on SUMPs CoR Meeting June 13 DG MOVE.
Vegetative Risk Management Plan Template Details for Development by Section.
Palmer House Hilton – Private Dining Room 9
Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
Reagan/Clinton Compare/Contrast Essay. I. Reagan and Clinton both argue... but... A.Reagan argues B.Clinton argues.
1 What is Arboriculture? Horticulture is “the art and science of cultivating plants.” Horticulture is “the art and science of cultivating plants.” Arboriculture.
UK UTILITY VEGETATION MANAGEMENT BENCHMARKING: WHAT IT MEANS TO YOU WILL PORTER CN UTILITY CONSULTING JUNE 2011 WILL PORTER CN UTILITY CONSULTING JUNE.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
California Integrated Waste Management Board Contractor’s Report Framework for Evaluating End-of-Life Product Management Systems in California Presented.
SYSTEM OF EVALUATION AND MANAGEMENT CONTROL RESULTS-BASED BUDGETING THE CHILEAN EXPERIENCE Heidi Berner H Head of Management Control Division Budget Office,
Business Continuity and Disaster Recovery Planning.
Feeder Maintenance Program. The purpose of the Cooperative is to provide safe, reliable, low-cost energy services in fiscally responsible partnership.
Overview of Florida Consent Decree
Vegetation Management
1 March 1, 2007 Report An Overview October 30, 2006 – Staff Workshop.
Information Technology for Management (6 th Edition) Turban * Leidner * McLean * Wetherbe 2008 Transforming Organizations in the Digital Economy.
The Business Plan: Creating & Starting the Venture
NextEnd. Supply Chain Management – Definitions Supply chain management is the management of a network of interconnected businesses involved in the ultimate.
Benchmarking at Saudi Aramco
Chapter 1 The Product Design Process
1 United States Patent and Trademark Office Revised PCT International Search and Preliminary Examination Guidelines Biotech/ChemPharm Customer Partnership.
UN/CEFACT Pioneering Paperless Trade: The way covered and the way ahead Experience of Innovative Compliance in Supply Chain Security UN/CEFACT Executive.
Mousetrap Car Project 130 pts. Cover Page : 5 pts Photo Group Name Name of the Member of the Group Grade Level School UCLA MESA Center Lawndale High School.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Analysis of minimal criteria for environmental inspection.
Metropolitan Planning Council Roundtable Discussion November 17, 2011 ComEd J. Tyler Anthony Senior Vice President, Distribution Operations.
Electric Infrastructure Workshop Gulf Power Company January 23, 2006.
SDG&E Electric Reliability Reporting CPUC Workshops May 26-27, 2015.
Colorado Springs Utilities Environmental Services Functional Assessment Presentation for the American Public Power Association’s 2001 Engineering & Operations.
3rd Party Audits and Regulatory Inspections Food Industry Perspective
FERC’s New Reliability Initiatives Kevin Kelly Director, Policy Analysis, OMTR Federal Energy Regulatory Commission NARUC Annual Meeting Nashville, TN.
YOUR RELIABLE PARTNER. “Taxation of intellectual property, research & development in Russian Federation”
2 nd National Energy Efficiency Strategy Review EELN Consultation Workshop 24 April
NBIS – National Bridge Inspection Standards National standards for the proper safety inspection and evaluation of all hwy bridges NBI – National Bridge.
Comprehensive Cultural Assessments Summary of Scope & Methodology A. Levin © SYNERGY Consulting Services Corporation, 1999.
2. Terms and definitions1 # Voltage Sags and Interruptions.
1 Determining the High-level Direction of Information Systems Part 2.
Pre-Conference III: Auditing, Monitoring and Effective Internal Investigations Pharmaceutical Regulatory and Compliance Congress and Best Practices Forum.
IAEC Reliability Webinar Presented by: Regi Goodale and Ethan Hohenadel December 11,
Employment and Training Administration DEPARTMENT OF LABOR ETA Effective Grants Management 101 Bob Lanter U.S. DOLETA, Region 6 Denise Dombek U.S. DOLETA,
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Responsible Care® Health & Safety Task Force – 06 H&S.
Section 1.1 Rectangular Coordinates; Graphing Utilities; Introduction to Graphing Equations.
ReliabiliTREE Program  Revitalized Vegetation Management Program. –25 Dedicated Crews for 4 years. –Trees adjacent to the line are pruned for 4 years.
Zeta Services Inc. Supply Chain Application July, 2009.
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
School Site Council (SSC) Essentials in brief An overview of SSC roles and responsibilities Prepared and Presented by Wanda Chang Shironaka San Juan Unified.
Advanced Energy Engineering Technology Modeling Building Energy Systems Session 5: Energy modeling today.
Onsite Quarterly Meeting SIPP PIPs June 13, 2012 Presenter: Christy Hormann, LMSW, CPHQ Project Leader-PIP Team.
2009 Hurricane Season Preparations Florida Public Utilities Company May 6, 2009.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
The MESICIC Experience & Civil Society Participation.
ACEC National Energy and Environment Challenges in Asset Management? Brian Long Transmission Line Performance Xcel Energy August 15, 2015.
Key Performance Indicators in Calibration Management
ПОРТФОЛИО профессиональной деятельности Белово 2015 Таюшовой Натальи Борисовны Преподавателя дисциплин «Химия», «Биология»
Fort Stanwix National Monument Energy Audit Contract
Synergies Between Other IEA DSM Tasks and DSB
Overview – Guide to Developing Safety Improvement Plan
Overview – Guide to Developing Safety Improvement Plan
Defense Acquisition University
Plenary: rules of indices
Information Technology for Management (6th Edition)
RECORDS AND INFORMATION
WORKSHOP GUIDELINES-MANUAL
Key Performance Plans For Excellence
UNODC-UNECE Manual on Victimization Surveys: Content
Experiment Report Format
Solving Equations 3x+7 –7 13 –7 =.
Rectangular Coordinates; Introduction to Graphing Equations
Presentation transcript:

Trends in North American UVM Trends in North American Utility Vegetation Management (UVM) William Porter Principal Author of CN Utility Consulting Utility Vegetation Management Benchmark & Industry Intelligence (2010)

Trends in North American UVM Overview Some Metrics We Are Covering Today: I. Snapshot of North American Utilities II. UVM Program Drivers III. Cycles and Scheduling Methodology IV. Clearance Requirements V. UVM Methods VI. Production VII. Customer Issues VIII. Reliability IX. Regulations X. Conclusion

Introduction I.Basic Trend In North American UVM: Right Tree-Right Place II.CNUC Objective: Discover Industry Best Management Practices (BMPs)

Introduction

SNAPSHOT OF NORTH AMERICAN UTILITIES Company Type

SNAPSHOT OF NORTH AMERICAN UTILITIES Utility Type

SNAPSHOT OF NORTH AMERICAN UTILITIES Service Territory

SNAPSHOT OF NORTH AMERICAN UTILITIES Service Territory Description – Customer Density

SNAPSHOT OF NORTH AMERICAN UTILITIES Overhead System Circuit Kilometres

SNAPSHOT OF NORTH AMERICAN UTILITIES Overhead System Span Kilometres

SNAPSHOT OF NORTH AMERICAN UTILITIES Tree Population

UVM PROGRAM DRIVERS The Most Important Program Driver Is at the Top of the Graph

CYCLES AND SCHEDULING METHODOLOGY Cycle Definitions

CYCLES AND SCHEDULING METHODOLOGY Cycle Lengths

CYCLES AND SCHEDULING METHODOLOGY Cycle Scheduling Methodology

CLEARANCE REQUIREMENTS California’s Clearance Requirements GO 95 Rule 35: California has the most comprehensive UVM regulation in North America Comments made by utilities with requirements: This enhances cycle times. They are our major negotiating tool for obtaining what is proper clearance. Clearance requirements set clear expectations and assist with funding requests.

CLEARANCE REQUIREMENTS Mandatory Clearance Requirements Opinions are Changing

CLEARANCE REQUIREMENTS Do They Work? Companies Were Asked, “ Could You Achieve 100% Compliance with a Mandatory Clearance Requirement?”

UVM METHODS Crew Type

UVM METHODS Herbicide Usage

UVM METHODS Special Programs Included in Routine Maintenance

PRODUCTION Cost per System Span Kilometre

PRODUCTION Relative Efficiency

CUSTOMER ISSUES UVM Inquiries per Year

CUSTOMER ISSUES UVM Complaints per Year

CUSTOMER ISSUES Perceived Customer Disconnect Commentary by Utilities: Customer equates aesthetics with proper tree pruning, not aware of utility best management practices for line clearance. Although it is getting better, customer expectations are often not in sync with safety and reliability requirements.

CUSTOMER ISSUES UVM Problem Solving That Requires the Most Time Ranked the Fifth Activity Out of 40 That Requires the Most Problem Solving Customer Relations Ranks Tenth

RELIABILITY Causes for Outages

RELIABILITY US Reliability Metrics SAIDI = SAIFI = CAIDI =

RELIABILITY Frequency of Outages Caused by Trees

LAWS AND REGULATIONS FAC

LAWS AND REGULATIONS Increase in Activities Due to Federal Regulations

CONCLUSION Measuring Progress This Graph Only Includes Companies with an Established Hazard Tree Removal Program Relatively High Correlation of Which Means: The More Trees Removed, The Better The Reliability (In other words: SAIFI is Reduced)

CONCLUSION BMPs and Regulations for Right Tree in The Right Place 1.Clear Concept of Cycle Based Scheduling or a Replacement for Cycle Scheduling. 2.Cost Effective and Standardized Method of Tree Inventory/ Work Load Assessment. 3.Capture and Disseminate Research and Development Results. 4.Address the Customer Complaints Proactively, Recognizing the Political Force of an Insignificant Number of Complaints. 5.Keep Open and Debate the Concept of Mandatory Clearance Distances.