IUK view of LT UIOLI NGG EU Workgroup 03/04/14. CONFIDENTIAL www.interconnector.com IUK view of LT UIOLI: 3 processes ProcessFrequencyPartiesInformation.

Slides:



Advertisements
Similar presentations
Allocation of Capacity in Portugal Under the New Regulation 24th IG meeting S-GRI, Madrid September 23, 2013.
Advertisements

Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Classification: Internal Status: Draft Statoils view on the ERGEG GRI Secondary Capacity work Helga Franse – EU & Regulatory Affairs Stockholm – 26 November.
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Energy Investment in the EU and Russia: Investment Regulation under the Third Energy Package and the Russian Law on Foreign Investments in Strategic Sectors.
ERGEG Gas Regional Initiative North-West IP Medelsheim / Obergailbach TSOs’ joint diagnostic 9 October 2007.
EU Developments Transmission Workgroup 3rd November 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Enagás IT roadmap CAM & CMP 19 July Index CAM IT roadmap CMP IT roadmap.
15 th September 2013 Enagás and TIGF Information to NRAs.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Gas Regional Initiative – North West Region Bonn 28 April 2009 Fiete Wulff Capacity Project C1 Short-Term Capacity (STC) Operators’ Group Update.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Implementation Programme Action TR1003: All to consider how to address EU developments going forward and send any identified issues to:
European Developments Transmission Workgroup 1 March 2012.
1 19 th June videoconference 23 rd IG Meeting South Gas Regional Initiative.
1 Madrid, 27 th February st IG Meeting South Gas Regional Initiative.
1 Madrid, 30 th April th SG Meeting South Gas Regional Initiative.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
UNC Mod 485: CMP-LTUIOLI Progress Update 3 April 2014.
Discretionary Release Interruptible Entry Capacity 1st November 2007.
Classification: Internal Status: Draft ERGEG GRI NW Investment Workstream Shippers’ contribution Helga FRANSE, Jerome DUROYON,
Modification 500 slides for Workgroup
Time-Series Forecast Models EXAMPLE Monthly Sales ( in units ) Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Data Point or (observation) MGMT E-5070.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
Transfer & Trades Special Transmission Workstream
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
27 th IG meeting 28 th March 2014 Enagás, GRTgaz, REN and TIGF.
Coordination of Capacity Products Meinhard Janssen GTE ExCom Member GTE+ Workshop on GTE+ Work Programme 24 June 2008.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
240,000 20p + a SATMathVideos.Net A) 550 books B) 600 books C) 650 books D) 700 books 1,000 books sold in a month when the price was $10 per book. An equation.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
Congestion Management
Conclusions STC Core Group 8 September 2009 The Hague
21st IG Meeting South Gas Regional Initiative
New transparency guidelines
Proposer: Matthew Hatch Panel Date: 20/10/16
19th June videoconference
EU Implementation Programme
26th IG meeting 23th January 2014
Current Situation Service Retention vs. Annual Costs
26th February 2015 Teleconference
8th February 2018 Teleconference
Project Nexus Workgroup AQ Correction Process Timeline
Gas Regional Investment Plan project
Study 4 – Business Income Forms: Sum Insured; Loss Settlement
Enagás, GRTgaz, REN and TIGF
MOD0166 – Reform of the NTS Offtake Arrangements Shipper Perspective
26th February 2015 Teleconference
IPO volume has been very low in the U.S. since 2000
Unit 3 Review (Calculator)
PARCA Timeline.
Revised Tender Timescale for DN Interruption Arrangements
Proposer: Debbie Brace Panel Date: 20th March 2014
DAILY CAPACITY PUBLICATION
Girls Night Out Activity Nights
Modification 501 slides for Workgroup
Gas European Network Code Implementation
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Capacity validation, renominations and within-day capacity purchase
Modification 0043 – Limitation on offering for sale unsold capacity
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
South Gas Retional Initiative
BREXIT Confidence – Monthly Tracker
Nominations 11 July 2014.
Presentation transcript:

IUK view of LT UIOLI NGG EU Workgroup 03/04/14

CONFIDENTIAL IUK view of LT UIOLI: 3 processes ProcessFrequencyPartiesInformation 1MonitoringRegularly [monthly] TSO to Shippers Report of Shipper’s capacity, nominations and utilisation (including offered for sale) 2ReportingRegularly [annual] TSO to NRAReport of each Shipper’s capacity, nominations and utilisation (including offered for sale) 3Justification and potential withdrawal Following a trigger (party unable to acquire firm capacity) TSO, Shippers, NRA TSO: calculation of utilisation Shipper: justification if under-utilised NRA: decision to withdraw

CONFIDENTIAL LT UIOLI Process for IUK IUK performs calculation of utilisation (nominated, sold & offered) for 1 Apr – 30 Sept and 1 Oct – 31 Mar Shipper provides justification to IUK if utilised <80% in both 6 month periods If insufficient justification then IUK forward to Ofgem & CREG; Ofgem & CREG decide whether to withdraw notify Shipper and IUK of quantity and duration IUK offers withdrawn capacity in next auction Capacity remains with the original Shipper unless reallocated The original Shipper always remains liable for the full tariff to IUK revenues received if capacity reallocated will be passed to original Shipper within limits (being defined with NRAs & Shippers)

CONFIDENTIAL CMP wording Long-term use-it-or-lose-it mechanism 1. National regulatory authorities shall require transmission system operators to partially or fully withdraw systematically underutilised contracted capacity on an interconnection point by a network user where that user has not sold or offered under reasonable conditions its unused capacity and where other network users request firm capacity. Contracted capacity is considered to be systematically underutilised in particular if: (a) the network user uses less than on average 80 % of its contracted capacity both from 1 April until 30 September and from 1 October until 31 March with an effective contract duration of more than one year for which no proper justification could be provided; or (b) the network user systematically nominates close to 100 % of its contracted capacity and renominates downwards with a view to circumventing the rules laid down in point 2.2.3(3). 2. The application of a firm day-ahead use-it-or-lose-it mechanism shall not be regarded as justification to prevent the application of paragraph Withdrawal shall result in the network user losing its contracted capacity partially or completely for a given period or for the remaining effective contractual term. The network user shall retain its rights and obligations under the capacity contract until the capacity is reallocated by the transmission system operator and to the extent the capacity is not reallocated by the transmission system operator. 4. Transmission system operators shall regularly provide national regulatory authorities with all the data necessary to monitor the extent to which contracted capacities with effective contract duration of more than one year or recurring quarters covering at least two years are used.’;