Www.altiusva.com Assessing Competence within Construction Gary Plant CEng MIMechE 12 th April 2012.

Slides:



Advertisements
Similar presentations
The Challenge to Install 1,300 New Water Meters. Scope Install electromagnetic meters (mostly) + telemetry + solar power ~700 sites in Upper Murray Valley.
Advertisements

Standard 13 Related Educational Activities. What does it cover? The institutions programs or activities that are characterized by particular content,
Module N° 6 – SMS regulation
Managing the Health and Safety of Contractors
A Joint Code of Practice Objectives and Summary Presentation
Hussey Fraser Solicitors
Background Presenters Work done in preparation for WHS changes
Part of the BRE Trust Protecting People, Property and the Planet What have fire doors ever done for us? Ian Stewart Certification scheme manager June 2014.
Babcock International Group Plc SH V0.05 Project Status Reviews APM SWWE Event, 31/01/2012 Pete Ricketts FAPM Babcock Marine,
This presentation has been made available to the Uniting Church SA by Vivienne St. John Robb from Viv it up! (Corporate training and development with a.
Child Safeguarding Standards
Subcontractor Management Nelson Kakande Program Coordinator, Clinical Operations and Health Services Research Program Joint Clinical Research Centre, Kampala,
Click to start. Next Generation Business Industries and Platinum Safety introduce.
Scott Brownrigg Regulations Review CIC Peter Caplehorn 26 th October 2010.
Overview of Session Current guidelines for accreditation Current quality assurance processes in the context of some recent examples Discussion.
Customer Service & Customer Protection in MANSELL
Different Procurement Methods
Construction Safety and Health in HK Its Development & the Way Forward The 3rd International Conference Implementation of Safety and Health on Construction.
Health and Safety Executive Control of Legionella Howard Whittaker Principal Inspector FOD Leeds.
What SMS means for an Operator’s relationship with the CAA
The German Approach on Safety of Natural Gas Distribution Pipelines WORKSHOP ON THE PREVENTION OF ACCIDENTS OF GAS TRANSMISSION PIPELINES (The Hague, 8.
Risk Assessment – An Essential Standard
Health and Safety Executive Health and Safety Executive Discretion and Judgement: HSE’s approach Mike Cross 3 June 2014.
Steve Jones, SHEQ Manager (Emergency & Critical Services)
Peter O’Connell Policy Manager Federation of Master Builders.
Unit 4: Ensuring safe environments in Health and Social Care
Ship Recycling Facility Management System IMO Guideline A.962
 COST OF PROJECT  CONTRACTS AND CONDITIONS  CHANGE ORDERS  SAFETY PROCEEDURES.
WHY CONFORMITY ASSESSMENT?. What is conformity assessment?  Conformity assessment is the name given to processes that are used to demonstrate that a.
NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za.
Level 2 Award in Employability Skills
Point of Work Risk Assessment
RISK ASSESSMENT. What is Risk Assessment? It is an examination of what we do, to determine the things that can cause harm to people It allows us to decide.
Service Transition & Planning Service Validation & Testing
An Integrated Control Framework & Control Objectives for Information Technology – An IT Governance Framework COSO and COBIT 4.0.
Procure Plus model 1. Scope 2. Kick start meeting 3. Initial surveys 4. Information for costs 7. Live on e-Procurement 6. Pre-contract meeting 5. Target.
SECHA AGM 29 September Louise Bushell and Janet Ortega Compliance Managers CQC Regulation under the Health and Social Care Act 2008.
Health & Safety Awareness - The basics. Sharon Currie Robert Fisher HWL Advisers (OH&S)
Responsible Care® Health & Safety Task Force – 06 H&S.
1 Quality in Construction; cidb Mandate & Focus February 2014.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Competence & training Version: September 2007.
Role of PM in Airport Projects.  What constitutes a Successful Airport Implementation Programme?  Should the Process of Design and Construction of Airports.
UNDER CONSTRUCTION II CONFERENCE 13 TH N OVEMBER 2009 CONSTRUCTION SKILLS CERTIFICATION SCHEME 1.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Remodelling COMAH \\ Changing the way we regulate major hazards Sarah Shore Programme Manager the Competent Authority.
Protect Association Meeting FCA s166 Skilled Person Reviews 4 March 2016 Mark Davies Associate Director Financial Services Group T: E:
PROVISION OF FIT FOR PURPOSE GUARDING SERVICES AT MAJUBA RAIL PROJECT.
Joint Residents Meeting with Mears 15 th February 2011.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
The Journey Towards Implementing a Successful Purchase Card Scheme Tony Brett Head of Procurement University of Bath.
LCLS-II ES&H Requirements: Subcontractors
Thomas A. Baden Jr. | Commissioner and State Chief Information Officer
Selection of contractors & PAS91:
Risk Management and the Treasury Function
ISO/IEC
Maintaining Safety Standards
Administration of a FIDIC Contract - Project Control
The move from a rule based system to a risk based system Challenges for the competent authorities October 2017.
Award Contract.
Maintaining Safety Standards
CIO Forum Briefing 3rd November, 2015
An-Najah National University
Temporary Works Co-ordination
TECHjOSH.COM TechJosh.com.
NEBOSH Fire Certificate Practicable Application
Presentation to the Parliamentary Portfolio Committee on Public Works – Annual Performance Plan 2018/19 24 April 2018.
Martin Duffy, Collaboration and Improvement Director, Kier
Visit Cycles Justifying Audit Days
DSC Contract Management Committee Meeting
SADC PPP Network PPPs in SADC
Presentation transcript:

Assessing Competence within Construction Gary Plant CEng MIMechE 12 th April 2012

Why assess contractors? Can they help your business Can they deliver? Will they enhance your reputation Can they harm your business Poor delivery Poor quality Accidents and incidents Reputation Commercially sound? Supervision Remedial work Why?

Who? Who should you assess? Risk £ Tactical Low risk, low spend Tactical Profit Low risk, high spend Strategic Security High risk, low spend Strategic Critical High risk, high spend

What should you assess? Consider: - What will they be doing? What risks will that expose you to? What rules and regulations are applicable? Legislation Client Site What existing certifications, management systems and approvals do they hold and do any of them provide the assurance you need? Track Record For you For others What?

When should you assess? When in doubt – don’t leave it to chance Before it’s too late Pre-contract Before work starts Before something goes wrong! Warning signs As often as necessary to maintain assurance When?

Where should the assessment take place? Desktop verses On-site On-site only if it is impossible to do remotely Where?

How do you do the assessments? Competent resources Consistency Appropriateness Keep up-to-date Records 3 rd Party service providers Safety Schemes in Procurement (SSIP) Scope? – don’t assume they cover everything you need Cost effective How?

Don’t leave it to chance Target assessments where they’re needed Keep them appropriate Don’t leave it too late Do as much as you can without visiting site Get as much assurance as you can from existing sources In short

Thank you