1 RF Workshop 16 th & 17 th April 2012 Design Layout Alan Grant, STFC.

Slides:



Advertisements
Similar presentations
Slide 1 Insert your own content. Slide 2 Insert your own content.
Advertisements

Orthogonal Projection
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
High Voltage Braced Insulator Assemblies Design & Application
List and Search Grants Chapter 2. List and Search Grants 2-2 Objectives Understand the option My Grants List Grant Screen Viewing a Grant Understand the.
Office of Traffic, Security, and Technology Guide Sign Design June 18-19, 2013 Arden Hills, MN.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Sectional Assembly and Installation
Photo Composition Study Guide Label each photo with the category that applies to that image.
Introduction to building Estimating in South Australia 1.
7 | Means of Egress (Life Safety Code)
Introduction to composite construction of buildings
* 07/16/96 Traffic Signals 101 Topic 5 Cabinets *.
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
LCW Upgrades Update Booster Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions were.
Medical Gas Rail.
O X Click on Number next to person for a question.
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
Take from Ten First Subtraction Strategy -9 Click on a number below to go directly to that type of subtraction problems
Squares and Square Root WALK. Solve each problem REVIEW:
RF Specification discussion MICE RF workshop 16 th April 2012.
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
U2 L5 Quotient Rule QUOTIENT RULE
Sect. 5.1 Polynomials and Polynomial Functions
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Week 1.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
1 Unit 1 Kinematics Chapter 1 Day
Stave 130 Tooling John Carrol & Tim Jones. Status First generation stave assembly tool model modified to incorporate… – Stave Geometry Length 1277mm Width.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
RF Layout 3pi/2 for Discussion. 2 RF Design mtg 14/1/15 Output line from amplifier is lower than the PRY, needs to go high to clear PRY to couple to South.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
1 SPL Collaboration Meeting dec 08 - WG1 Introduction First SPL Collaboration Meeting Working Group 1 High Power RF Distribution System Introduction.
Step IV Construction North Side Walls and End Walls May 2015 Stephen Plate, Brookhaven National Laboratory.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
MICE Construction Project Update: SSs, PRY, Cavities, Tracker… 1MAP Friday Meeting – January 30, 2015 Alan Bross.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
RF Module Integration Colin Whyte University of Strathclyde on behalf of the MICE collaboration 1RF Review 9th & 10th Sept '15 Abingdon.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
DT-LHCb coordination meeting 18 April 2016
MICE CM28 Engineering Session Summary (On behalf of Wing)
RF Layout 3pi/2 for Discussion
Presentation transcript:

1 RF Workshop 16 th & 17 th April 2012 Design Layout Alan Grant, STFC

Overview Review Panel Recommendations Coax Distribution Coax Installation Coax supports Magnetic Field – 4616 pre amp Next Steps Summary 2

Recommendation from Review Panel RF Distribution Coax high power line stretchers not warranted. Relocate Hybrid splitters from behind shield wall. Provides more space for access to amplifiers. Reduces the length and volume of 4” coax. Were possible reduce number of coaxial joints. Mechanical Installation & Maintenance Try and install all under floor coax distribution at stage V. Design improved mounting mechanism to minimise protrusions. Improve lateral movement capability for any miss-alignment of coax distribution during installation. 3

Initial RF Layout – view from cooling channel side 4

NEW RF Layout – view from cooling channel side 5 line stretchers removed. no 4 inch coax over wall. hybrid splitters moved - more accessible manually adjustable phase shifters to take up errors in coax length easier to assemble – introduced flexible coax.

Initial RF Layout – view behind shield wall 6

NEW RF Layout – view behind shield wall 7 hybrid splitters moved – space freed up behind wall. no coax distribution going under the wall. Previously 8 off 4 inch under wall. 6 off 6 inch coax over the top of wall. Previously 8 off 4 inch over wall. Coax length matching now takes place other side of wall – space less of a constraint. improved access for installing amplifiers.

NEW RF Layout – view behind shield wall 8

Initial 4” Coax Distribution 9 Phase shifters to each cavity coupler Coax length matching behind shield wall above amplifiers

NEW 4” Coax Distribution 10 Flexible coax in each line – assemble & alignment easier Manually adjustable phase shifters to take up errors in coax length Total travel 60mm Next steps:- Match the coax lengths. Position coax supports. Coax under floor split for easier access and installation

Coax Sections – Installation/Removal Concerns 11 ~55mm required to clear mating flangeFlexible coax system in each line. Have adjustment in clamp system. Phase shifters to be installed last in assembly sequence

Coax Supports 12 Rotation Vertical Longitudinal Horizontal CLAMP TEE SLOT RAILS

Pre Amp Tube Position Behind Shield Wall Pre amp tube below level of shield wall ~ 0.16m and spaced ~ 0.53m back. Initial magnet field analysis predict approx 8-10 gauss. Wall Tube 4616 Pre Amp

Next Steps - What Phase Angle Do We Design For? 14

Summary Addressed all of the issues raised by the review panel. Changed the design as per their recommendations. There are no clashes with the steel work on both the cooling channel false floor and the parked position false floor – lighting trunking clash on South mezzanine floor which is being resolved. Some concrete on south side needs to be removed. Installation made simpler with introduction of flexible coax and relocation of hybrid splitters. No clash issues with moving AFC’s to parked position on false floor. Magnetic field calcs indicate no issues for 4616 pre amp. Fire officer has been consulted and agreed that what is proposed causes no access problems or issues. 15