International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Global ATM Operational Concept
System of Systems (DRAFT) To be approved by the ICAO Council
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-85/PIA-3 Air Traffic Situational Awareness (ATSA) Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization ASBU Methodology Summary of Block 0 Modules H. Sudarshan SIP/2012/ASBU/Nairobi -WP/8 Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-102 Increased Effectiveness of Ground-Based Safety Nets SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Measurement of environmental benefits Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Measurement of environmental benefits Saulo Da Silva
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Rome November 2008 Johan Martensson, CASCADE
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Hands-on Exercises Performance Based Planning and use of IFSET
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Trajectory-Based Operations(TBO) Saulo Da Silva
Measurement of environmental benefits Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent Procedures using ADS-B SIP/ASBU/2012 -WP/24E Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi, May 2012)

2 Module N° B0-86 Improved Access to Optimum Flight Levels through Climb/Descent Procedures using ADS-B ICAO SIP ASBU WORKSHOP Summary This ITP module enables an aircraft to reach a more satisfactory flight level for flight efficiency or to avoid turbulence for safety. The main benefit of ITP is significant fuel savings and the uplift of greater payloads Main Performance ImpactKPA-02 Capacity, KPA -04 Efficiency and KPA-05 Environment. Operating Environment/Phases of FlightEn-Route Applicability Considerations This can be applied to routes in procedural airspaces, Global Concept Component(s)CM, AUO, AOM Global Plan Initiatives (GPI)GPI-9, GPI-7 Pre-RequisitesNIL Global Readiness ChecklistStatus (ready now or estimated date). Standards Readiness√ Avionics Availability√ Infrastructure Availability √ Ground Automation Availability √ Procedures Available√ Operations Approvals√

3 ITP using ADS-B is in operational use and hence can be considered to be a baseline. ICAO SIP ASBU WORKSHOP Module N° B Baseline

4 The introduction of ITP and ADS-B based separation minima enable aircraft to climb or descend through the altitude of other aircraft when the requirements for procedural separation cannot be met ICAO SIP ASBU WORKSHOP Module N° B0-86 – Change Brought by the Module

5ICAO SIP ASBU WORKSHOP Module N° B0-86 – Intended Performance Operational Improvement CapacityImprovement in capacity on a given air route EfficiencyIncreased efficiency on oceanic and potentially continental en-route. EnvironmentReduced emissions SafetyA reduction of possible injuries for cabin crew and passengers CBATo be determined

6 Procedures for ITP using ADS-B have been developed and a PANS-ATM Amendment is in progress. Additional information will be available in an ICAO circular – “Safety Assessment for the development of Separation Minima and Procedures for In-Trail Procedure (ITP) using Automatic Dependant Surveillance – Broadcast (ADS-B) Version 1.5.4” ITP requires the use of CPDLC as per PANS-ATM amendment for an applicability date of Nov ICAO SIP ASBU WORKSHOP Module N° B0-86 – Necessary Procedures (Air & Ground)

7 Avionics – The aircraft performing the in-trail procedure will require an ADS-B IN capability compliant with DO-312/ED-159 or DO- 317A/ED-194. The other aircraft involved in the procedure will require an ADS-B OUT capability compliant with AMC /DO-260A/DO-260B/ED-102A, or DO-317A/ED-194. – CPDLC compliant with DO-306 chg 1 / ED-122 chg 1is required. Ground Systems – It is recommended that conflict probe logics be adapted to ITP separation minimum. ICAO SIP ASBU WORKSHOP Module N° B0-86 – Necessary System Capability

8 The flight crew needs to be trained and qualified to understand the limitations of the equipment and to ensure a correct usage of the In-Trail Procedure and supporting avionics. The controller needs to be trained and qualified to assume the tasks and to ensure a correct usage of the In-Trail Procedure and ground support tools. ICAO SIP ASBU WORKSHOP Module N° B0-86 – Training and Qualification Requirements

9 Regulatory/Standardization – Use current published criteria Approval Plans – To Be Determined. – Operational Approval guidance/criteria may be needed based upon regional application for ATSA. ICAO SIP ASBU WORKSHOP Module N° B0-86 – Regulatory/standardization needs and Approval Plan (Air and Ground)

10 Standards – EUROCONTROL ATSAW Deployment Plan(draft) – EUROCAE ED-159 / RTCA DO-312 “Safety, Performance and Interoperability Requirements Document for the In-Trail Procedure in Oceanic Airspace (ATSA-ITP) Application”. Procedures - TBD Guidance Material : TBD Approval Documents – FAA AC a; and FAA TSO-C195a – FAA Memo; Interim Policy and Guidance Automatic Dependent Surveillance Broadcast (ADS-B) Aircraft Surveillance Systems Supporting Oceanic In-Trail Procedures (ITP). Dated: May 10, 2010; – DO-312/ED-159; – DO-317A/ED-194; – ICAO circular – “Safety Assessment for the development of Separation Minima and Procedures for In-Trail Procedure (ITP) using Automatic Dependant Surveillance – Broadcast (ADS-B) Version 1.5.4”. ICAO SIP ASBU WORKSHOP Module N° B0-86 – Reference Documents

11 Improved Access to Optimum Flight Levels through Climb/Descent Procedures using ADS-B Benefits: Capacity, Efficiency, Environment and Safety Elements: – Avionics: ADS-B IN; ADSB OUT; and CPDLC – Ground: Conflict probe for ATC To be reflected in ANRF ICAO SIP ASBU WORKSHOP Module N° B0-86 Implementation - Benefits and Elements

12ICAO SIP ASBU WORKSHOP