Ensuring a 'Flexible Use of Airspace'….

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
SIP/2012/ASBU/Nairobi-WP/19
Global ATM Operational Concept
Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
The European Organisation for the Safety of Air Navigation dynamic Demand Capacity Balancing WP Marcel RICHARD Expert ATFCM Operational Specifications.
ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS)
CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels,
Moving Towards an Integrated ASM/ATFCM/ATS Approach
ACG Workshop, 17 Feb 2004 – OATA project Concept of Operations (ConOps) ACG Workshop, 17 February 2004 Jose Varela and Ian Ramsay, SD/ESC.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
ZMQS ZMQS
Civil-Military coordination in France
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
31/03/2017 Moving towards an Integrated ASM/ATFCM/ATS Approach Brussels – September 2012 Cooperation in crisis and contingency situations Asli.
Moving towards an Integrated ASM/ATFCM/ATS Approach Brussels – September 2012 Network Management Operational Performance Enhancements Razvan BUCUROIU.
ABC Technology Project
The European Organisation for the Safety of Air Navigation Network Management functions Evolutions in SESAR WP7 and WP13 Moving Towards an Integrated ASM/ATFCM/ATS.
The European Organisation for the Safety of Air Navigation ASM Solutions at Network Level ASM / ATTFCM / ATS Workshop EUROCONTROL HQ September 2012.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 FAB CE Feasibility Study Operations FAB CE Stakeholders Workshop March 5 th 2008, Prague.
Mission Trajectory Step 1 From planning to deployment.
Airspace Configurations Yevgen Pechenik EUROCONTROL DNMM/COO/NOM/OPL/PRO Civil-Military Workshop September 2012.
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
The European Organisation for the Safety of Air Navigation Civil-Military Workshop Operational requirements for ASM systems Giuseppe Acampora EUROCONTROL.
The European Organisation for the Safety of Air Navigation MILO Military Liaison Officer in NMOC Civil-Military Cooperation 20 September 2012 Support function.
The European Organisation for the Safety of Air Navigation Civil-Military Workshop Harmonised Data Sharing Giuseppe Acampora EUROCONTROL DNM/COO/NOM/OPL/PRO.
The European Organisation for the Safety of Air Navigation Civil-Military Workshop Integration of ASM, ATFCM and ATC Giuseppe Acampora EUROCONTROL DNM/COO/NOM/OPL/PRO.
ASM Dimension in Free Route Airspace Catalin Lepadatu EUROCONTROL DNM/COO/NOM/OPL Civil-Military Workshop September 2012.
Free Route Airspace in DK/SE FAB
Squares and Square Root WALK. Solve each problem REVIEW:
© 2012 National Heart Foundation of Australia. Slide 2.
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
1 Ensuring a 'Flexible Use of Airspace'…. ICAO EANPG FUA Task Force Paris, May 2008 EUROCONTROL Airspace, Network Planning & Navigation Division.
Traffic Management and FUA integration
How Cells Obtain Energy from Food
Peter Matern Head of ADM Unit 30/01/2014
Ensuring a 'Flexible Use of Airspace'….
Presentation transcript:

Ensuring a 'Flexible Use of Airspace'…. Current ASM process Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL HQ, 20-21 Sep 2012 Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL

Flexible Use of Airspace (FUA) Concept Flexible use of airspace is an airspace management concept described by the International Civil Aviation Organisation (ICAO) and developed by the European Organisation for the Safety of Air Navigation (Eurocontrol), according to which airspace should not be designated as either purely civil or purely military airspace, but should rather be considered as one continuum in which all users’ requirements have to be accommodated to the maximum extent possible.

Civil Service Providers ASM process Network Manager Network Consistency National AMC NATIONAL PLAN Military Users Civil Service Providers Civil users Military planning Civil demand NEGOTIATION

Enablers at Local, FAB and Network level Consistent Airspace Data National AMCs Sharing airspace demands at regular times (from snapshots to rolling airspace plans) Collaborative Decision Making (CDM) System support

Ensuring a 'Flexible Use of Airspace'…. Current ASM/ATFCM Processes and Interfaces Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL HQ, 20-21 Sep 2012 ANDERS HALLGREN Manager ASM procedures DNM/COO/NOM/OPL/PRO EUROCONTROL

ASM Improvements Initiative Exploit airspace availability Consistent application of FUA Safe, efficient and accurate data flows Rolling UUP Procedure 2&3 EAW CDR network B2B NOP portal CIAM ASM Support Systems TRA/TSA clarification FL publication CBA designation Support Stakeholders CDR inconsistencies

Deliverables Achieved NOP Portal B2B More CDRs Less Inconsistencies Rolling UUP CDRs Availability

Improved Processes and Procedures At pre-tactical level assess impact by expected airspace allocation Procedure 2: Better exploitation of airspace opportunities on the day of operation

Improved Processes and Procedures Enhanced flexibility on the day of operations ATCO: Tactical rerouting Rerouting via IFPS reprocessing = lower workload AO: less overbooking on D-1 more capacity, predictability, less tactical actions by air crew

2012 ASM/ATFCM Process D-1 D NM Time Axis AMCs FMP AO 10 FPLs Users (Summer) > 12.00 12.00 12.00- 13.00 13.00- 14.00 14.00 15.00 15.00- 16.00 16.00 16.00- 17.00 17.00 17.15 17.15> >08.00 08.00 08.00- 09.00 09.00 09.15 09.15> Requests fine-tuning (D) Coordin. with other Users Draft UUP 1 Network and Local assessments Coordination with Users UUP 1 Network and Local assessments Coordination with Users UUP 2 Draft AUP Coordination AUP Coordin. with other Users Draft UUP 2 AMCs Network impact assessment eAUP Rerouting Proposals to AOs Rerouting Proposals to AOs CFMU ENV Update CFMU ENV Update NM CFMU ENV Database Update Notification Notification Final CDR Request FMP Earlier area deactivation Coordin. with AMC Coordination with AMC Earlier area deactivation Coordin. with AMC Coordination with AMC Requests fine-tuning (D) Final airspace Request Airspace Users FPLs React (CGH, CNL or new FPL) React (CGH, CNL or new FPL) AO 10

2012 ASM/ATFCM Process D-1 D Time Axis AMCs NM FMP AO 11 FPLs Users Airspace Users AMCs FMP AO Draft AUP Time Axis (Summer) 14.00 15.00 15.00- 16.00 17.00 17.15 12.00 09.00 09.15 NM AUP 12.00- 13.00 UUP 1 Notification UUP 2 Earlier area deactivation Coordin. with other Users D-1 D Final airspace Request > 12.00 >08.00 FPLs React (CGH, CNL or new FPL) Rerouting Proposals to AOs 17.15> 09.15> Coordin. with AMC CFMU ENV Update Final CDR Request CFMU ENV Database Update eAUP Draft UUP 1 Network and Local assessments 16.00- Coordination with Users 08.00 Draft UUP 2 08.00- Coordination with AMC Requests fine-tuning (D) 13.00- Network impact assessment Coordination Coordination Network impact assessment 11

2012 ASM/ATFCM Process FPLs D-1 D CFMU ENV Database Update eAUP Time Airspace Users AMCs FMP AO Draft AUP Time Axis (Summer) 14.00 15.00 15.00- 16.00 17.00 17.15 12.00 09.00 09.15 Network impact assessment NM AUP 12.00- 13.00 UUP 1 Notification UUP 2 Earlier area deactivation Coordin. with other Users D-1 D Final airspace Request > 12.00 >08.00 React (CGH, CNL or new FPL) Rerouting Proposals to AOs 17.15> 09.15> Coordin. with AMC CFMU ENV Update Final CDR Request Coordination Draft UUP 1 Network and Local assessments 16.00- Coordination with Users 08.00 Draft UUP 2 08.00- Coordination with AMC Requests fine-tuning (D) 13.00- eAUP CFMU ENV Database Update CFMU ENV Database Update eAUP FPLs FPLs 12

2012 ASM/ATFCM Process UUP 1 UUP 2 D-1 D Time Axis AMCs NM FMP AO 13 (Summer) > 12.00 12.00 12.00- 13.00 13.00- 14.00 14.00 15.00 15.00- 16.00 16.00 16.00- 17.00 17.00 17.15 17.15> >08.00 08.00 08.00- 09.00 09.00 09.15 09.15> Requests fine-tuning (D) Coordin. with other Users Draft UUP 1 Network and Local assessments Coordination with Users UUP 1 Network and Local assessments Coordination with Users UUP 2 Draft AUP Coordination AUP UUP 1 Coordin. with other Users Draft UUP 2 AMCs UUP 2 Network impact assessment eAUP Rerouting Proposals to AOs Rerouting Proposals to AOs CFMU ENV Update CFMU ENV Update NM CFMU ENV Database Update Notification Notification Final CDR Request FMP Earlier area deactivation Coordin. with AMC Coordination with AMC Earlier area deactivation Coordin. with AMC Coordination with AMC Requests fine-tuning (D) Final airspace Request Airspace Users FPLs React (CGH, CNL or new FPL) React (CGH, CNL or new FPL) AO 13

2012 ASM/ATFCM Process Notification Notification D-1 D Time Axis AMCs (Summer) > 12.00 12.00 12.00- 13.00 13.00- 14.00 14.00 15.00 15.00- 16.00 16.00 16.00- 17.00 17.00 17.15 17.15> >08.00 08.00 08.00- 09.00 09.00 09.15 09.15> Requests fine-tuning (D) Coordin. with other Users Draft UUP 1 Network and Local assessments Coordination with Users UUP 1 Network and Local assessments Coordination with Users UUP 2 Draft AUP Coordination AUP Coordin. with other Users Draft UUP 2 AMCs Network impact assessment eAUP Rerouting Proposals to AOs Rerouting Proposals to AOs CFMU ENV Update CFMU ENV Update NM CFMU ENV Database Update Notification Notification Final CDR Request Notification Notification FMP Earlier area deactivation Coordin. with AMC Coordination with AMC Earlier area deactivation Coordin. with AMC Coordination with AMC Requests fine-tuning (D) Final airspace Request Airspace Users FPLs React (CGH, CNL or new FPL) React (CGH, CNL or new FPL) AO 14

2012 ASM/ATFCM Process Rerouting Proposals to AOs D-1 D Time Axis (Summer) > 12.00 12.00 12.00- 13.00 13.00- 14.00 14.00 15.00 15.00- 16.00 16.00 16.00- 17.00 17.00 17.15 17.15> >08.00 08.00 08.00- 09.00 09.00 09.15 09.15> Requests fine-tuning (D) Coordin. with other Users Draft UUP 1 Network and Local assessments Coordination with Users UUP 1 Network and Local assessments Coordination with Users UUP 2 Draft AUP Coordination AUP Coordin. with other Users Draft UUP 2 AMCs Network impact assessment eAUP Rerouting Proposals to AOs Rerouting Proposals to AOs CFMU ENV Update Rerouting Proposals to AOs CFMU ENV Update Rerouting Proposals to AOs NM CFMU ENV Database Update Notification Notification Final CDR Request FMP Earlier area deactivation Coordin. with AMC Coordination with AMC Earlier area deactivation Coordin. with AMC Coordination with AMC Requests fine-tuning (D) Final airspace Request Airspace Users FPLs React (CGH, CNL or new FPL) React (CGH, CNL or new FPL) AO 15

2012 ASM/ATFCM Process React (CHG, CNL or new FPL) React (CHG, CNL or D-1 D Time Axis (Summer) > 12.00 12.00 12.00- 13.00 13.00- 14.00 14.00 15.00 15.00- 16.00 16.00 16.00- 17.00 17.00 17.15 17.15> >08.00 08.00 08.00- 09.00 09.00 09.15 09.15> Requests fine-tuning (D) Coordin. with other Users Draft UUP 1 Network and Local assessments Coordination with Users UUP 1 Network and Local assessments Coordination with Users UUP 2 Draft AUP Coordination AUP Coordin. with other Users Draft UUP 2 AMCs Network impact assessment eAUP Rerouting Proposals to AOs Rerouting Proposals to AOs CFMU ENV Update CFMU ENV Update NM CFMU ENV Database Update Notification Notification Final CDR Request FMP React (CHG, CNL or new FPL) React (CHG, CNL or new FPL) Earlier area deactivation Coordin. with AMC Coordination with AMC Earlier area deactivation Coordin. with AMC Coordination with AMC Requests fine-tuning (D) Final airspace Request Airspace Users FPLs React (CGH, CNL or new FPL) React (CGH, CNL or new FPL) AO 16

UUP PUBLICATION D-1 D-1 D-OPS 16.00 17.00 18.00 19.00 20.00 06.00 Winter time

UUP PUBLICATION D-OPS D-OPS 07.00 08.00 09.00 10.00 11.00 12.00 20.00 Winter time

CDR Network

Uptake CDRs

Rolling UUP

Rolling UUP

UUP Publication March 2012 Not Using CIAM Using UUP Not Using UUP

Improved Economies

Environmental Benefits

Ensuring a 'Flexible Use of Airspace'…. Thank you for attention!