Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling Work in progress, This version: 22 September 2011 updated after 5 th AESAG, 20 September 2011,
How to do intraday capacity pricing in a continuous trade environment? 10 October 2011 NRA-TSO-PX meeting (Informal minutes, made during workshop, of the.
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
SWE IG Meeting Paris, CRE XBID Overview Supported by.
EuroPEX Decentralized Market Coupling as the preferred cross-border method B. den Ouden, President of Europex APEx Annual Conference 2004 Leipzig, Germany,
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
NWE Day-ahead price coupling project Cost Issue 2 nd IG Meeting 26 October APX ENDEX.
Cross-Regional Roadmap for Intraday DRAFT Updated 31/10/2011.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
1 Intraday in the CWE region NWE and Bilateral initiatives Common RCC CSE - CWE 28 September 2010.
2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
Assessment of differences in market designs in the CS region Milan 18 July 2008.
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
Intraday projects - Commitment of the parties towards an integrated intraday market.
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
IFE-CASC long term auctions Project status Implementation Group Meeting - Lisbon,
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Progress with coupling FUI and CWE region
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Jan Müller Bundesnetzagentur ERI Central.
Draft Cross-regional roadmap for Capacity Calculation Still work in progress, for discussion 27 June 2011.
on Congestion Management (IG)
1 TITRE Update on approval processes for NWE price coupling NWE IG on DA and ID Copenhagen, 9 May 2012.
Directie Toezicht Energie 11 Roadmap GRI NW Robert Spencer, NMa/DTe.
New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
Draft document – Work in progress
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
IG FUI, Brussels, 21 st of May European thinking on intraday target model.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
PCR Status report AESAG, September Supported by:
The Market Coupling Experience in Europe Jean-François CONIL-LACOSTE CEO Powernext SA CEO EPEX Spot SE APEX 2008 Conference Session 1 - Part 3: European.
1 Auction Office establishment, antitrust issues and Project Plan IG Meeting, Vienna January 30 th 2008.
The European Electricity Market Integration and some Thoughts on Gas Markets Market Coupling and Ways Forward Lene Sonne Vice President, Market.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
RMC Regional Market Coordination RMC Regional Market Coordination RMC Regional Market Coordination CWE Capacity Allocation Service Company CASC Presentation.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
Market Coupling and Ways Forward Lene Sonne Vice President, Market
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
ETSO main 2006 Issues for West-Central Europe Market Development
NWE Day-Ahead Price Coupling
37th IG Meeting South Gas Regional Initiative
Linking of regional markets
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Incentives for electricity infrastructure – ERGEG view
Presentation transcript:

CWE Flow Based Market Coupling Presentation of the project to the CSE IG Milano, 3 June 2008

Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation is made in the name of Powernext and RTE only, and does not commit the other CWE Project Parties. Furthermore, the following presentation is not a CWE project working paper, and presents only some facts and opinions on the CWE project.

Project organization – 1 Complex project 11 parties involved, many stakeholders Technical complexity of the project High range of expertise needed Different legal framework Professional project organisation and management is requirement for success Three phases Design phase until July 2008 Regulatory approval (2-3 months) Implementation phase (planning to be defined)

Project organization - 2 Meeting Monthly JOINT STEERING COMMITTEE: All Partners / Co-Chaired by TSO/PX Every 2 weeks JOINT PROJECT BOARD : All Partners / Chaired by Project Manager Coordination Team : Project Manager + Workstream Leaders + Subproject Leaders Communication Coordinator + Distribution list All Parties Weekly Workstream Legal & Governance Workstream Algorithm Design + Task forces when needed Workstream Market Design Workstream Technical Workstream Regulatory Workstream Communication Subproject TSO – Flow Based Model

Interaction with PLEF/REGs Purpose Inform regulators and other stakeholders on progress and solutions Facilitate regulatory approval procedure and market consultation Take into account REGs concerns Transparency, non-discrimination, risk of the exercise of market power Process Periodically regulators are informed on the progress and issues through PLEF or IG 4 reports during design phase Technical meetings when necessary (with regulators and/or market parties)

Deliverables to PLEF/REGs Orientation study Progress report Implementation study 31 Jan 30 april 30 July Network model Algorithm selection Governance Market design Algorithm design Tender initiated Implementation plan – estimated budget End of design Project plan 30 Nov Project organization Project deliverables

Technical Architecture Overview TSOs Back-end System: - Produces the internal grid analysis - Transfers the grid forecast to the FB System FB System: - Produces the Flow model parameters - Sends the Flow model parameters to the MC System and the TSOs back-end System MC System (CCU): built, operated and maintained by PXs - Runs the market coupling algorithm PXs Trading System: - Aggregates the order information - Transfers the aggregated order information to the MC System Bilateral Exchange System: - Calculates the cross-border flows schedules - Sends the cross-border flows schedules to the TSOs Back-end System Shipping agent: - Sells and buys energy on markets taking into account the results of the MC System - Collects the congestion revenue and sends it to CASC TSOs Back-end System Bilateral Exchange System FB System Shipping agent MC System (CCU) PXs Trading System

Legal & Governance Governance framework Set of arrangements to ensure that CWE market coupling is: Designed, built and operated to meet the needs Able to support extensions Governed by a combination of regulations, agreements, contracts, licences, shareholder agreements, procedures, etc

Design of the Market Coupling system WS Algorithm design MC system algorithm basis : 5 steps process Definition of requirements and evaluation criteria Inventory of technical options Evaluation of technical options and decision on algorithm basis (ongoing) Finalisation of the algorithm Full documentation WS Technical MC system design : IT specifications ongoing

Business processes WS Market design Description of business processes ongoing Decision on price / volume coupling taken Before the merge of the spot market of Powernext and EEX : Price coupling in TLC region + tight volume coupling from TLC to Germany After the merge : Price coupling on the whole region Fall back arrangements : Explicit auctions or Capacity distribution or Intraday TSO Sub Group Flow Based Implementation The FB prototype has been validated at the end of 2007

Conclusions and further impacts

CWE: a complex project Main constraints Technical and governance issues Very tight timeline Many resources involved Advancing… but heavy organisational constraints to deal with! Several requests for further extensions

Overview of the current European regional integration projects Many regional market systems projects are running in parallel: CWE has to deal with: flows from the Norned and the Britned cables and the EMCC project Ongoing discussions in the Central South but also in the South-West region Ongoing / Foreseeable regional integration projects

Integrating Spot power markets requires important resources and commitment from stakeholders Overlapping projects, while, in principle, one market area can participate in one implicit auction only Current discussion between CWE and EMCC / Norned participants illustrates the complexity of projects aiming at coupling already coupled or overlapping regions: Increasing number of parties, working on the consensus principle The variety of partners (commercial vs. regulated cost & revenues, private vs. public, supervised by different regulators, liquid vs. not yet liquid…) creates heterogeneous incentives Harmonization requirements (e.g. GCT, price boundaries…)

Going forward while managing the risks: How to proceed? - 1 Risks in launching different market integration projects in parallel : Risk of unmanageable overlapping integration projects Risk of inconsistency of the chosen interregional solutions regarding the other regional systems Risk of ill-designed interregional solution on the long-term Project complexity Incompatibility System quality problems

Going forward while managing the risks: How to proceed? - 2 Proposed methodology : Going further in the knowledge-sharing work regarding the features of local markets and the harmonization requirements for regional integration Keeping the CS IG informed on the CWE FBMC project Keeping the CS IG informed on the studies and the further developments made by GME on implicit auctions It is important to assess the possible modalities of coexistence of the CWE and CS regional initiatives.

Thank you for your attention!