Submission doc.: IEEE 11-14/0802r0 Consideration on UL MU transmission Date: 2014-07-14 Slide 1Jinyoung Chun et. al, LG Electronics July 2014 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0410r2 Submission March 2011 Slide 1 Data Transmission Protection on the IEEE ac MU-MIMO Downlink Date: Authors:
Advertisements

Protocol for SU and MU Sounding Feedback
Submission doc.: IEEE 11-14/0xxx March 2014 Giwon Park, LG ElectronicsSlide 1 Discussion on power save mode for real time traffic Date: Authors:
Doc.:IEEE /0859r0 July 2012 Simone Merlin, Qualcomm Inc Short Block Ack Date: Authors:
Submission doc.: IEEE 11-13/1388r0 Uplink multi-user transmission Date: Slide 1Jinyoung Chun et. al, LG Electronics November 2013 Authors:
Submission doc.: IEEE 11-14/0868r0 July 2014 Johan Söder, Ericsson ABSlide 1 UL & DL DSC and TPC MAC simulations Date: Authors:
Submission doc.: IEEE 11-14/0801r0 July 2014 Dongguk Lim, LG ElectronicsSlide 1 Envisioning 11ax PHY Structure - Part II Date: Authors:
Submission doc.: IEEE 11-10/0443r0 March 2014 Jarkko Kneckt, NokiaSlide 1 What Is P2P Traffic in HEW Simulation Scenarios? Date: Authors:
Doc.: IEEE /0696r2 SubmissionLiwen Chu Etc.Slide 1 Slot-based Power Save without PS-Poll Date: Authors: Date: July, 2012.
Doc.: IEEE /0074r0 Submission NDP Type PS-Poll Frame Follow-Up Date: Authors: Slide 1Young Hoon Kwon, Huawei.
Doc.: IEEE / hew Submission March 2014 Raja Banerjea, CSRSlide 1 A Simplified Simultaneous Transmit and Receive Mechanism Date:
Doc.: IEEE /0839r0 Submission Slide 1S. Abraham, Qualcomm Inc. July 2010 DL MU-MIMO performance with QoS traffic and OBSS.
Doc.: IEEE /1377r0 Submission November 2013 Jeongki Kim, LG ElectronicsSlide 1 DL efficiency enhancement in high dense network Date:
Doc.: IEEE /630r1a Submission S. Choi, Philips Research November 2001 Slide 1 HC Recovery and Backoff Rules Sunghyun Choi and Javier del Prado.
Doc.: IEEE /0342r0 SubmissionLiwen Chu Etc.Slide 1 Power Efficient PS Poll Date: Authors: Date: March, 2012.
Doc.: IEEE /0608r2 Submission May 2012 Shoukang Zheng et. al, I2R, SingaporeSlide 1 Low-Power PS-Poll Date: Authors:
Submission doc.: IEEE /0328r0 Nokia Internal Use Only March 2012 Slide 1 Date: Authors: PS-Poll Enhancements Chittabrata Ghosh, Nokia.
Submission doc.: IEEE 11-12/1329r0 PS-Poll for Downlink Bufferable Units Date: Slide 1Eric Wong, Broadcom November 2012 Authors:
Doc.: IEEE /1325r0 Submission Nov PS-Poll TXOP Date: Authors: David Xun Yang, Huawei, et. al.Slide 1.
PS-Poll TXOP Using RTS/CTS Protection
Doc.: IEEE /0324r0 Submission Slide 1Michelle Gong, Intel March 2010 DL MU MIMO Error Handling and Simulation Results Date: Authors:
Doc.: IEEE /0567r0 Submission Slide 1Michelle Gong, Intel May 2010 DL MU MIMO Analysis and OBSS Simulation Results Date: Authors:
Doc.: IEEE /0517r0 May 2013 Submission Slide 1 Authors: Combining Process in Virtual CS Mechanism for ah Date: Lv kaiying, ZTE.
Doc.: IEEE /0782r0 Submission July 2010 Daewon Lee, LG ElectronicsSlide 1 STA MU-MIMO Group Management Signaling Design Date: Authors:
Doc.: IEEE /1278r0 Submission BSS load balancing for MU-MIMO Date: Authors: Nov 2010 Slide 1Daewon Lee, LG Electronics.
Doc.: IEEE /0783r0 Submission July 2010 Daewon Lee, LG ElectronicsSlide 1 MU-MIMO support for BSS load balancing Date: Authors:
Doc.: IEEE /1277r0 Submission MU-MIMO support for Heterogeneous Devices Date: Authors: Nov 2010 Slide 1Byeongwoo Kang, LG Electronics.
Doc.: IEEE /1123r0 Submission September 2010 Zhu/Kim et al 1 Date: Authors: [TXOP Sharing for DL MU-MIMO Support]
Doc.: IEEE /1244r1 Submission Nov.2010 Sun Bo, ZTE CorpSlide 1 Authors: Transmission Mechanism in MU-MIMO Date:
Slide 1 doc.: IEEE /1092r0 Submission Simone Merlin, Qualcomm Incorporated September 2010 Slide 1 ACK Protocol and Backoff Procedure for MU-MIMO.
Doc.: IEEE /0606r1 Submission Uplink Channel Access Date: Authors: May 2012 Minyoung Park, Intel Corp.Slide 1.
Submission doc.: IEEE /1186r2 September 2014 Pengfei Xia, Interdigital CommunicationsSlide 1 Comparisons of Simultaneous Downlink Transmissions.
Discussion on OFDMA in HEW
Doc.: IEEE /1190r2 September 2014 Submission Kaiying Lv (ZTE) Frame Exchange Control for Uplink Multi-user transmission Slide 1 Date:
Submission doc.: IEEE /0091r1 January 2015 Woojin Ahn, Yonsei UniversitySlide 1 UL-OFDMA procedure in IEEE ax Date: Authors:
Submission doc.: IEEE /0091r0 January 2015 Woojin Ahn, Yonsei Univ.Slide 1 UL-OFDMA procedure in IEEE ax Date: Authors:
Submission doc.: IEEE /0333r0 March 2015 Oghenekome Oteri (InterDigital)Slide 1 Throughput Comparison of Some Multi-user Schemes in ax Date:
Submission doc.: IEEE /1454r1 November 2014 Jarkko Kneckt (Nokia)Slide ax Power Save Discussion Date: Authors:
Doc.: IEEE /1431r1 Submission September 2014 Issues on UL-OFDMA Transmission Date: Authors: Slide 1.
Submission doc.: IEEE /0567r0 May 2015 Xiaofei Wang (InterDigital)Slide 1 Multi-STA BA for SU Transmissions Date: Authors:
Submission doc.: IEEE /1397r0 Month Year Myeong-Jin Kim, Korea UniversitySlide 1 Discussion on Frame Structure for Future WLAN Systems with OFDMA.
Submission doc.: IEEE /1454r0 November 2014 Jarkko Kneckt (Nokia)Slide ax Power Save Discussion Date: Authors:
Doc.: IEEE /0112r4 Submission Supporting Authentication/Association for Large Number of Stations September 2012 Slide 1 I2R Date:
Submission doc.: IEEE 11-14/0598r0 Slide 1Tran Thi Thao Nguyen, Kyushu Institute of Technology May 2014 Uplink multi-user MAC protocol for 11ax Authors:
Doc.: IEEE /0285r0 March 2013 Submission Resource Allocation Frame Format for RAW- based Medium Access Date: Authors: Chittabrata Ghosh,
Submission doc.: IEEE /0868r0 July 2015 Hakan Persson, Ericsson ABSlide 1 Impact of Frequency Selective Scheduling Feedback for OFDMA Date:
Submission doc.: IEEE 11-13/0288r0 TXOP Sharing Operation for Relay Date: Slide 1Eric Wong, Broadcom Authors: March 2013.
Submission Vida Ferdowsi, NewracomSlide 1 doc.: IEEE /0856r0July 2015 Compressed Uplink Trigger Frame Date: Authors:
Doc.: IEEE /0068r0 Submission Discussions on the better resource utilization for the next generation WLANs January 2012 Yasuhiko Inoue (NTT),
Submission doc.: IEEE /1096r0 Sep 2015 John Son et al., WILUSSlide 1 Recovery Procedures in Cascading Sequences Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0840r1 Submission AP Assisted Medium Synchronization Date: Authors: September 2012 Minyoung Park, Intel Corp.Slide 1.
Submission doc.: IEEE /1081r3 September, 2015 Jing Ma, NICTSlide 1 Further consideration on receive behavior based on the cascading structure.
Doc.: IEEE /0843r1 July 2015 Submission(ZTE) UL MU Random Access Analysis Date: Slide 1 Authors: NameAffiliationAddress Yonggang.
Submission doc.: IEEE /1349r0 November 2015 Sungho Moon, NewracomSlide 1 Sounding for Uplink Transmission Date: Authors:
Investigation on 1024 QAM feasibility in 11ax
Doc.: IEEE /0066r0 Submission January 2015 Yongho Seok, NEWRACOM Downlink OFDMA Protocol Design Date: Authors: Slide 1.
Doc.: IEEE /0806r0 SubmissionSlide 1Young Hoon Kwon, Newracom Protection for MU Transmission Date: Authors: July 2015.
Submission doc.: IEEE /1116r1 September 2015 Jinsoo Ahn, Yonsei UniversitySlide 1 Trigger Frame Channel Access Date: Authors:
Submission doc.: IEEE /0662r0 May, 2016 Jing Ma, NICTSlide 1 Further consideration on channel access rule to facilitate MU transmission opportunity.
Doc.: IEEE /0333r0 March 2016 SubmissionStéphane Baron et al., Canon Issue related to unused UL OFDMA RUs Date: Slide 1 Authors: NameAffiliationAddress .
Comparisons of Simultaneous Downlink Transmissions
AP access procedure for UL MU operation
Frame Exchange Control for Uplink Multi-user transmission
MU-MIMO support for Heterogeneous Devices
DL MU MIMO Error Handling and Simulation Results
UL MU Random Access Analysis
PS-Poll TXOP Date: Authors: Month Year
Error Recovery Scheme for Scheduled Ack
Location Measurement Protocol for 11ax
Consideration on System Level Simulation
Presentation transcript:

Submission doc.: IEEE 11-14/0802r0 Consideration on UL MU transmission Date: Slide 1Jinyoung Chun et. al, LG Electronics July 2014 Authors:

Submission doc.: IEEE 11-14/0802r0 Motivation In [1], we checked PHY and MAC feasibility to support UL MU transmission. In this contribution, we further discuss the procedure of UL MU transmission and the related issues in 11ax. Slide 2Jinyoung Chun et. al, LG Electronics July 2014

Submission doc.: IEEE 11-14/0802r0 Procedure of UL MU transmission AP’s scheduling  For STAs to transmit UL data frame simultaneously, AP has to set TXOP and let each STA know its own resource such as frequency band in FDM and stream index in SDM. Therefore, we suggest the procedure of UL MU transmission as below. Jinyoung Chun et. al, LG Electronics July 2014 Slide 3

Submission doc.: IEEE 11-14/0802r0 UL MU transmission UL Scheduling frame  AP sets TXOP for UL MU transmission and indicates the transmission method to STAs such as frequency/spatial resource to use. Issue 1. How to send UL MU scheduling frame Issue 2. How to choose UL MU STAs UL data frames  STAs transmit their UL data frames respectively as AP indicates. Issue 3. How to make UL data frames synchronously received by AP. ACK frame  AP transmits ACK frame(s) to STAs separately or together. Jinyoung Chun et. al, LG Electronics July 2014 Slide 4

Submission doc.: IEEE 11-14/0802r0 Issue 1. How to send UL MU scheduling frame Option1. With PIFS access  It is used to send CF-Poll frame for assignment of polled TXOP  It provides the highest priority to access channel and doesn’t have to manage CW Option2. Using a specific AC (e.g., AC_VO) parameters  It is used to send a management frame using AC_VO  It provides fixed priority to access channel and has to manage CW Option3. Using AC parameters of STAs assigned UL MU TXOP  It is used to send RTS or CTS frame using the access category of the corresponding QoS Data  It provides variable priority to access channel and has to manage CW Slide 5Jinyoung Chun et. al, LG Electronics July 2014

Submission doc.: IEEE 11-14/0802r0 Slide 6Jinyoung Chun et. al, LG Electronics Issue 2. How to choose UL MU STAs In order to select UL MU STAs and to set UL MU TXOP,  STA’s buffer status helps the AP assigning UL MU resource efficiently. To report the STA’s buffer status  Current standard can be leveraged, i.e., Piggybacked in UL data (e.g., Queue size in QoS Control field) Standalone UL frame (e.g., QoS Null frame including Queue size)  Additionally Piggybacked in DL dependent UL control frames (e.g., Modified CTS, BA, ACK, etc.) July 2014

Submission doc.: IEEE 11-14/0802r0 Issue 3. How to make UL data frames synchronously received by AP (1/2) Timing synchronization  Need 2 or 4 times longer CP for UL MU transmission in outdoor environment Frequency synchronization  By [2], over±4kHz difference between 2 STAs causes performance degradation in UL MU MIMO. Power synchronization [1]  More critical in SDM/CDM than in FDM where UL data is separated in frequency domain before quantization. Slide 7Jinyoung Chun et. al, LG Electronics July 2014 Indoor (scenario 3)Outdoor (scenario 4) Radius [3] 20 meters150 meters 95% channel delay [1] 58 nsec700/1200 nsec in UMi/UMa Max. round trip delay67 nsec500 nsec Time difference125 nsec1200 nsec ~ 1700 nsec

Submission doc.: IEEE 11-14/0802r0 Issue 3. How to make UL data frames synchronously received by AP (2/2) Potential solution(s) for synchronization in UL MU  Longer CP size Need 2 or 4 times longer CP for UL MU in outdoor environment Need further system-level verification  Adjustment procedure for synchronization AP indicates each STA to adjust time/frequency/power difference. AP calculates the difference among MU STAs by frame exchange with STAs.  UL MU only for STAs who are sufficiently synchronized Implementation-specific, but usage is limited Slide 8Jinyoung Chun et. al, LG Electronics July 2014

Submission doc.: IEEE 11-14/0802r0 Conclusion We discussed the procedure of UL MU transmission and related issues to support UL MU transmission in 11ax.  AP initiates UL MU transmission by transmitting UL scheduling frame.  AP needs information to schedule STAs in advance.  11ax system needs to align the differences of time, frequency and power among STAs. Next issues are  TXOP protection based on RTS-CTS, L-SIG protection, etc.  Processing time of UL data frame Need to check if the time is enough for STA to prepare data packet within SIFS after receiving UL MU scheduling frame which includes MU scheduling information (e.g., STAs’ ID, assigned MU channel, TXOP, etc.).  Channel access and retransmission rule  And verification of system-level gain of UL MU transmission Slide 9Jinyoung Chun et. al, LG Electronics July 2014

Submission doc.: IEEE 11-14/0802r0 Reference [1] , “Uplink multi-user transmission” [2] , “Uplink MU-MIMO Sensitivity to Power Differences and Synchronization Errors” [3] , “Simulation scenarios” Slide 10Jinyoung Chun et. al, LG Electronics July 2014