WAF – WPC Value Stream Mapping Project Preparation and Training Prepared for: WAF & Work Packaging Control Project Team (10 August 06)

Slides:



Advertisements
Similar presentations
Understanding Value Stream Decision Making
Advertisements

Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
1 Administrative Lean for General Foremen & Supervisors Presenters: Lean Team Lean Training and Facilitation: Georgia Tech, MEP 26 August 05.
Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
1 Just-in-Time/Lean Production A repetitive production system in which the processing and movement of materials and goods occur just as they are needed!
Vandal Boat Factory Simulation
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
JIT, TPS, and Lean Operations
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Just-In-Time and Lean Systems
Just-in-Time and Lean Systems
Class 12: Chapter 8: Lean Systems Class 12 Agenda –Review Exam question challenges –Review Grade Sheet –Discuss Classroom Performance Process –Comments.
Value Stream Analysis Kaizen Training
© 2007 Pearson Education Lean Systems Chapter 9. © 2007 Pearson Education How Lean Systems fits the Operations Management Philosophy Operations As a Competitive.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
1 Lean Thinking MGMT Lean Thinking A philosophy Principles Practices For the design, operation, management, control and continuous improvement.
Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.
CONTINUOUS IMPROVEMENT PROGRAM
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
LEAN MANUFACTURING Jason Prior. Introduction to Lean  Overview of Lean in Toyota video.video  Main Concept: ELIMINATING WASTE  Not an acronym  Not.
Value Stream Mapping.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
How to Effectively Implement Set-up Reduction in Any Organization.
 2000, QualityToolBox.com, LLC, all rights reserved A STRATEGY FOR PERFORMANCE EXCELLENCE.
Lean and Clean—Friend or Foe? Great Lakes Regional Pollution Prevention Roundtable.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Value Analysis/ Flow Analysis
Lean Six Sigma Methodology.
Lean Basics Dewey Warden.
LEAN system.
1 Introduction to Value Stream Mapping & Management Major Mark McNabb, USAF.
Lean Manufacturing Takeaways SCLC / ECC Spring Meeting April 26 th, 2007.
JIT and Lean Operations
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
Just-in-Time and Lean Operations. Developments of JIT and Lean Operations 1960’s: Developed as Toyota Production System by Taiichi Ohno and his colleagues.
Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME
Philosophy and Key Concepts
Lean Manufacturing Chapter 15 pp June 29, 2012.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
Rapid Improvement Events Converting Philosophy to Action Original slides by Doug Fingles - MERC.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
PROJECT NAME EMPIRE BELT(S) Month Day, Year. 2 Agenda Lean Overview Introduction to the Project & Team The Process Next Steps.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Kaizen Eventing: The process of observation and the elimination of waste in a process.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
Implementation of Lean at Rheem Manufacturing
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Mel Wendell – Mountain Pointe High School
Introduction to Value Stream Mapping & Management
Lean Manufacturing Series
Lean operations and JIT
Lean Manufacturing Basic Overview XYZ Company.
Pull Manufacturing and Just In Time
Introduction to Lean Emily Varnado.
Welcome to my presentation
Chap 10 Learning Objectives
Value Stream Mapping (VSM) Training
Competing in the Marketplace
Implementation of Lean at Rheem Manufacturing
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Presentation transcript:

WAF – WPC Value Stream Mapping Project Preparation and Training Prepared for: WAF & Work Packaging Control Project Team (10 August 06)

Agenda Introduction –Steering Committee Scheduling Project –Objective –Steering Committee –Projects –Teams WAF – WPC Project –Goals –Scope Lean Overview –What is Lean –Where is Waste? –Value Stream Mapping –Improvement Solutions Project Approach –Project Agenda –Ground Rules

Project Objective Scheduling Project Objectives: Everyone working to the same priority and plan (coordination). Non-stop progress of work.

Involvement Steering Committee: Leo Falardeau, CO Bob Finley, XO Tom Sweeney, Technical Director Harry Spafford, Union President Gerald Mackaman, RO Mike Hader, PMA Miles Prescott, Weapons PMA Steve DeWitt, Planning Department Head Bob Thran, Deputy Planning Department Head Jill Winkelman, Georgia Tech External advisors as appropriate/needed: Commodore, Boat Captain, NSSC

Steering Committee WAF – WPC Project Team Scheduling Project Team Roles and Responsibilities of Scheduling Steering Committee: Be Leaders Provide Leadership Guidance to working groups Resources Command vision/direction Encouragement Objective feedback Timing/boundaries Monitor results/quality control Manage change (change management)

Involvement WAF & Work Packaging Control Project Team: Mike Hader, PMA Bob Thran, Planning Andy Lowe Chief Martin, Chief Discher or other (as designated by Andy Lowe) Moore, PO (or other designated by PMA) Refit manager Mixson or Emerson Mel Garmin, Planners Supervisors June Byrd (alt. Dave Crosby, John Parsons or Lonnie Smith) Dennis Kapparis, GF (alt. Steve Swan) Wayne Collier Ms. Liz Pittaluga, Code 700 Jill Winkelman, Georgia Tech

WAF – WPC Project Goals *Reliable, consistent method for opening WAFs (consistent by shop and boat, by tagouts and non-tagouts…) Standardize process Standardize WAFs Reduce WAF Process/Scheduling/Review Time of General Foremen and Supervisors (with consideration to emergent work)

WAF – WPC Project Scope Regular refits with consideration of ERP’s TRF Work Only (includes TRF Alts) From the point of the job loaded and screened to the point of the WAF (Work Authorized) From the point of Work Complete to the point of the AWR signed off. (handle variation?)

Lean Overview

A systematic approach throughout an organization to: –Specify value by specific product –Identify the value stream for each product –Make value flow without interruptions –Let the customer pull value from the producer –Pursue perfection Source: Lean Thinking, Womack & Jones, 1996 Definition of Lean Thinking Product: Anything that flows from input to output.

Lean Overview VA vs. NVA Value Added Activities (VA) Activities that transform materials into the finished product Customer willing to pay for Non-Value Added Activities (NVA) Activities that take time and resources (Waste) Customer is NOT willing to pay for Need to eliminate or minimize

Lean Overview Product Leadtime 95%5% Traditional Focus Lean Focus Value Adding activitiesNon-Value Adding activities

Lean Overview Cycle Time One of the most noteworthy accomplishments in keeping the price of Ford products low is the gradual shortening of the production cycle. The longer an article is in the process of manufacture and the more it is moved about, the greater is its ultimate cost.” Henry Ford, 1926

Types of Waste Defects: Rework or Scrap Overproduction Inventory Waiting of parts/people/machines/paperwork Transportation of parts/people/paper Extra processing Motion of people/machines Unused employee ideas

Lean Overview Setup Reduction Standardized WorkBatch ReductionTeams Quality at Source 5S SystemVisualPlant Layout POUS Cellular/FlowPull/KanbanTPM Value Stream Mapping Continuous Improvement

Lean Overview Customer Service Order Entry/ New Accounts Credit CheckDistribution Center Shipping What is a Value Stream? What happens when you order something by phone…..

Lean Overview Value Stream Includes all activities related to getting from raw material to delivery of the product Includes both value-added and non-value added activities Includes the interactions related to the larger value stream

Lean Overview Value Stream Map Visual Common language Material and information flow Identifying opportunities Understanding impact Current State Future State

Lean Overview Product Family Current State Map Future State Map Plan and Implement How the process currently operates. The foundation of the future state. Designing a lean flow. Using the Value Stream

5S A safe, clean, neat arrangement of the workplace which provides a specific location for everything and eliminates anything not required. Sort Set in Order Shine Standardize Sustain

Standardized Work Where there is no Standard, there can be no Kaizen.-- Masaaki Imai Three Elements of Standard Operations: 1. Takt Time 2. Work Sequence 3. Standard WIP Standard Operations Sheet Debur Machine Drill Grind QA Clean Takt Time 4 min Cyc Time 4 min Std WIP = 6 Quality ChkSafety Focus # of Emp 2 Make it Visible!

Quality at the Source Places responsibility for quality on the worker doing the job Promotes doing the job right the first time Pass  Fail

Point-of-Use Storage Raw materials stored where used Frequent, small shipments from vendors Requires trustworthy workforce Simplifies physical inventory tracking

Batch vs. One Piece Flow 10 minutes Batch & Queue Processing Lead Time:30+ min. for total order 21+ min. for the first piece 10 minutes Process A B C 12 min. for total order 3 min. for first piece Process B A C Continuous Flow Processing

Setup Time The time from the last good product of the previous run to the first consistently good product of the next run. Gathering necessary items Exchanging parts Positioning parts Making adjustments

Pull System / Kanban Make to Order versus Forecast. Signals (Kanbans) communication tool for production. Producing at the rate of the customer buying the product.

Takt Time Calculation = Takt Time Time Available Demand Example: Time Available = 25,200 seconds (one shift) Demand = 200 Gold Buzz per day Takt Time = 25, units 126 seconds == 2.1 minutes

How Do We Know We’re on Target?

Project Approach

–Project Timeline –Project Agenda –Process –Ground Rules –Management Support

Next Steps