Approved for Public Release; Distribution Unlimited The Falcon Launch Vehicle: Towards Operationally Responsive Space Space Exploration Technologies 1310.

Slides:



Advertisements
Similar presentations
Recycling Waste Heat – CHP as an alternative
Advertisements

1 Resp Space Presentation LM Concept is Responsive & Affordable Approved for Public Release, Distribution Unlimited.
2013 Key Issues Review: Enabling Sustained Deep Space Exploration with a Broad Vision Congressional Visits Day Preparatory Briefing Teleconferences February.
Advanced Hypersonic Weapon Flight Test Overview to the Space & Missile Defense Conference 14 August 2012 Ms. Debra G. Wymer Director, Technical Center.
Concept Overview for 2 mt Case “2 mt case”: integrated payloads of no more than 2 mt can be landed on the surface of Mars; extension of current Mars EDL.
Larry Phillips MAY 13th-17th, 2002 Micro Arcsecond Xray Imaging Mission: Pathfinder (MAXIM-PF) Launch Vehicle Information Final Version.
Presented by Marco Christov at the 11th Mars Society Annual Convention, 14 – 17 August 2008, Boulder Colorado. A Mars Heavy Transport.
FEDERAL SPACE AGENCY International conference “Europe space policy: ambitions 2015” Session 1. “General view on propulsion systems: LV of the future”
HQ AFSPC/XORS Air Force Space Command Long Range Launch Scheduling Process MSgt Phil LeMaitre HQ AFSPC/XORS 25 Oct 05.
NASA Commercial Crew Program COMSTAC May 2011 Page 1 National Aeronautics and Space Administration COMMERCIAL CREW PROGRAM COMSTAC May 2011 E. Mango Commercial.
Liquid Rocket Engine Cycles
Blue Origin AIAA Civil Space Symposium Huntsville, Alabama
Solid Rocket Boosters Overview Two solid rocket boosters provide the main thrust to lift the Space Shuttle off the pad. They are the largest solid- propellant.
Mission Design Requirements First priority is to deliver takeoff mass to aircraft team. Deliver 5kg item to ISS 24 hour launch lead time Vehicle must be.
Launch Vehicles. LAUNCH SYSTEM CONCEPTS SHROUD PROTECTS THE SPACECRAFT SHROUD PROTECTS THE SPACECRAFT MAIN VEHICLE PRIMARY LIQUID OR SOLID ROCKET PROPELLANT.
Architecture Team Industry Day Briefing 17 January, 2002.
National Aeronautics and Space Administration Commercial Crew and Cargo Program Overview June 17, 2009 Doug Cooke.
MAE 4262: ROCKETS AND MISSION ANALYSIS Single and Multi-Stage Rockets September 9, 2014 Mechanical and Aerospace Engineering Department Florida Institute.
Design Goals Saturn V Ariane 4 Pegasus Vanguard Bellerophon ? ? ?
Principles of Propulsion and its Application in Space Launchers Prof. Dr.-Ing. Uwe Apel Hochschule Bremen REVA Seminar1.
Choices: Some Considerations in Configuring Launch Systems Dr. John M. Jurist Adjunct Professor of Space Studies, Odegard School of Aerospace Sciences,
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status to the COMSTAC Philip McAlister NASA Exploration Systems Mission.
Propulsion Engineering Research Center NASA Technology Roadmap: Launch Propulsion Systems Robert J. Santoro The Propulsion Engineering Research Center.
Mid-Atlantic Regional Spaceport (MARS) 17th Annual Small Payload Rideshare Symposium June 11, 2015 Zigmond “Zig” Leszczynski Deputy Executive Director.
GPS Status and Modernization Maj Wesley Chidester Deputy Chief, Systems Engineering & Integration GPS Wing, Air Force Space Command GEOSpatial Information.
California's first Delta 4-Heavy arrives at Vandenberg AFB, CA The three Common Booster Cores and the cryogenic upper stage to comprise the West.
GPS Status and Modernization Capt Damon Smith PNT Requirements Division Air Force Space Command "This briefing is for information only. No US Government.
Space Exploration Technologies Corporation Spacex.com 1 Rocket Road Hawthorne (Los Angeles) CA USA 1212 New York Ave, Suite 1025 Washington DC
Intercollegiate Rocket Engineering Competition Spring 2015 EML Ethics and Design Project Organization.
Launch System Launch Vehicle Launch Complex Orbit Insertion Orbit Maneuvers.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
GPS Status and Modernization 3 rd International Satellite Navigation Forum Moscow, Russia 12 May 2009 Lt Col Tim Lewallen, US Air Force Acting Chief, PNT.
A3 Altitude Test Facility
Satellites and Launch Vehicles. “Gee Whiz” Facts Number of satellites currently in orbit is over 900 Satellites orbit at altitudes from 100 miles (Low.
The Rocket Men Project One Giant Leap. Final Launch Vehicle Dimensions Rocket Length in. Rocket Mass- 171 oz. Top Body Tube Length in. Bottom.
University of Florida Rocket Team Critical Design Review Presentation.
1 SpaceX proprietary data constituting “Confidential Information” under applicable agreements. Tim Hughes Vice President & Chief Counsel.
1 Commercial Crew Program The Next Step in U.S. Space Transportation Brent W. Jett October 11, 2012 Commercial Crew Program - Same Crew…New Ride.
Commercial Space: A New Frontier Dr. George C. Nield Deputy Associate Administrator for Commercial Space Transportation January 9, 2007 Federal Aviation.
Team PM8 Eventus Slide 1. Commercial spaceflight has seen increased activity as more privately owned companies invest in the venture. To avoid a catastrophic.
2/27/021 Spaceport Vision Team Members. 2/27/022 Systems Definition Spaceport System Spaceport Stakeholder Needs High-Level Trade Study Performance Gaps.
Global Positioning Systems Wing 11 November 2008 GPS Program Update.
Space Exploration Technologies Corporation Spacex.com Space Exploration Technologies Corporation Spacex.com.
AAE 450- Propulsion LV Stephen Hanna Critical Design Review 02/27/01.
5/9/02 1 Spaceport Vision Team Members Organizations that contributed: Federal Government DoD DoC DoT NASA State Government NCSS Industry University Detailed.
03/11/021 Spaceport Vision Team Members. 03/11/022 Systems Definition Spaceport System Spaceport Stakeholder Needs High-Level Trade Study Performance.
Space Exploration Technologies Corporation Spacex.com Space Exploration Technologies Corporation Spacex.com.
1 ATDC ASTWG Presentation – May 2001 Advanced Technology Development Center (ATDC) Presentation to ASTWG Presenter: Greg Clements ATDC Project Manager.
Constellation Space Transportation Planning Office July 30, 2009.
HARDING UNIVERSITY FLYING BISONS A Study of Atmospheric Properties as a Function of Altitude Flight Readiness Review.
© ИАЦ КВНО ЦНИИмаш Собственность ИАЦ. All rights reserved GLONASS Status and Progress Sergey Revnivykh CGSIC Meeting , Savannah, GA, US.
Office of Space Flight Spaceport and Range Technology Development Initiative Al Sofge NASA Headquarters May 15, 2001.
ASTWG Vision Team Group Exercise: Initial Summary of Results.
January 14,  Length: inches  Diameter: 6 inches  Mass: oz. / lbs.  Span: 22 inches  Center of Gravity: inches 
GPS Status and Modernization Munich Satellite Navigation Summit Munich, Germany 3 March 2009 Colonel David Buckman, US Air Force PNT Command Lead Air Force.
2015 in Spaceflight: A year in review Tal Inbar Head, Space Research Center The Fisher Institute for Air & Space Strategic Studies, Israel.
03/20/021 Spaceport Vision Team Members Organizations that contributed: Air Force NASA NCSS FAA Industry University Etc.
UCF_USLI Preliminary Design Review David Cousin Freya Ford Md Arif Drew Dieckmann Stephen Hirst Mitra Mossaddad University of Central Florida.
Millennium Engineering and Integration Company A NEW DOCUMENTATION PROCESS TO STREAMLINE RANGE SAFETY PROCEDURES 0 O. “Rusty” Powell, Allan Smith, Jeff.
00:00:00 Standby 3.0L.
Matt Chapin, Nick Wackel, Olon Pierce Preliminary Design Review THF-15
LAUNCH OF GEO STATIONARY SATELLITES
Development and Principles of Rocketry
AIRLINE TRANSPORTATION AERO 4100 / 5100
Derivation of the FSOA in Ariane 6 Specifications
International Space Station Providers
Vice President, Business Development
DESIGN OF THE ARIES IV TRIBRID LIQUID PROPELLANT ROCKET ENGINE
Main information on the «WORLD SPACE OBSERVATORY» project
2019 First Nation Launch – Oral Presentation
Presentation transcript:

Approved for Public Release; Distribution Unlimited The Falcon Launch Vehicle: Towards Operationally Responsive Space Space Exploration Technologies 1310 Grand Avenue El Segundo, CA Phone (310) X 228 Fax (310) spacex.com The views, opinions and/or findings contained in this article are those of the author and should not be interpreted as representing the official policies, either expressed or implied of the Defense Advanced Research Projects Agency or the Department of Defense

Approved for Public Release; Distribution Unlimited Background and Programmatic Progress SpaceX, under private investment, is developing a reliable, low cost launch vehicle in the light payload class As a result of the relatively simple design, robust margins, and the necessity to keep prices low, Falcon is a responsive launcher Programmatic Progress SpaceX has developed the facilities, holds all permits and licenses, and has developed the documentation necessary to build, test, and transport Falcon to VAFB State Department, 8 separate Environmental regulatory agencies, the ATF, the Western Test range and our local Fire Departments Agreement in place with the Army to operate from Kwaj Business Progress First launch contracted with support from the Secretary of Defense Government Mission assurance review initiated First customer signed for the Falcon V

Approved for Public Release; Distribution Unlimited Falcon SLV Technical Status Kestrel development nearly complete robust c* efficiency indicating a 327 Isp (which exceeds goal) Merlin component development complete; full engine development near complete Structural qualification begun Flight tankage in manufacture Complete prototype vehicle integrated as a manufacturing pathfinder Range telemetry successfully completed Command and Control Van and transporter erector nearly complete

Approved for Public Release; Distribution Unlimited Proto-Falcon final assembly on the precision manufacturing track November 2003

Approved for Public Release; Distribution Unlimited Falcon in Washington DC for its Unveiling

Approved for Public Release; Distribution Unlimited Technical Summary-- Falcon SLV Payload capability: Over 1500 lbs to LEO (28.5 deg, 100 nm, circular) Launch from Vandenberg, Kwajelein, and the Cape Multiple manifest, multiple orbit Very benign payload environment $5.9M per launch plus range fees for single flight contracts Vehicle flight ready by mid 2004 Diameter 5.5 tapering to 5 Length 68 1 st Stage Parachute/Water Recovery 1 st Stage Lox/RP1 2 nd Stage Lox/RP1

Approved for Public Release; Distribution Unlimited Falcon First Stage Re-usable 1 st Stage Lox – RP1 Propellant Aluminum 2219-T6 Tanks Flight Pressure Stabilized Design Common bulkhead 94% Mass Ratio Parachute to Water Landing SpaceX Merlin Engine Thrust: 72k SL, 85k Vacuum Isp: 261 SL, 310 Vacuum Ablatively Cooled Pintle Injector Geometry Pump-fed Gas Generator Cycle Turbine Exhaust Roll Control Hydraulic TVC

Approved for Public Release; Distribution Unlimited Merlin Engine Test

Approved for Public Release; Distribution Unlimited Falcon Second Stage Expendable 2 nd Stage Lox – RP1 Propellant Aluminum Lithium Tanks Common Bulkhead 91 % Mass Ratio Engine: 7.5Klbf Vacuum Thrust Pressure Fed with GHe Isp: 325 Vacuum Hot Helium Attitude Control Ablative/Radiative Cooling Pintle Injector Geometry EMA for TVC

Approved for Public Release; Distribution Unlimited Kestrel Engine Test

Approved for Public Release; Distribution Unlimited Falcon Performance from VAFB

Approved for Public Release; Distribution Unlimited Performance from VAFB Varying Inclination

Approved for Public Release; Distribution Unlimited Performance From Kwajalein

Approved for Public Release; Distribution Unlimited Predicted Injection Accuracies Published accuracies: inclination +/- 0.1 deg perigee +/- 10 km apogee +/- 20 km Predicted accuracies:

Approved for Public Release; Distribution Unlimited Launch Sites: Falcon I and Falcon V SLC 3W at the Western range (VAFB) for high inclination launches Reagan Test Site (Kwaj) for low to mid inclination launches Agreements also in place for LC-46 at the Eastern Range

Approved for Public Release; Distribution Unlimited Transporter/Erector

Approved for Public Release; Distribution Unlimited Launch Timeline, Standard SLV Mission

Approved for Public Release; Distribution Unlimited Falcon Launch Operations

Approved for Public Release; Distribution Unlimited Hurdles: The Non-Responsive Part Operationally responsive space requires extensive non- recurring/preparatory effort (i.e. not responsive) Hurdles are developmental and regulatory in nature Development hurdles include the capital investment and technical development leading to production of a low cost capability Regulatory elements include: MOA for launching; Annexes for individual Federal Sites Environmental FONSI Environmental permits Site license Range Safety Approval (FAA License) ATF DOT SpaceX has been successful in clearing the hurdles and is looking forward to first flight this summer