Central Vermont Public Service SOUTHERN LOOP COOLIDGE CONNECTOR Coolidge Connector Community Working Group April 30, 2007.

Slides:



Advertisements
Similar presentations
Planning For The Future Idaho Powers 2006 Integrated Resource Plan.
Advertisements

In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
The Midwest ISO from a Transmission Owner Perspective.
MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Planning for a Low-Carbon Future at San Diego Gas & Electric Rob Anderson Director of Resource Planning San Diego Gas & Electric Western Resource Planners.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
FLORIDA PUBLIC SERVICE COMMISSON WORKSHOP ON RENEWABLE PORTFOLIO STANDARDS JULY 26, 2007 BY E. LEON JACOBS, JR. WILLIAMS & JACOBS.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Overview of the Green Infrastructure Section of PWSAs Feasibility Study Presentation Charrette No. 3: April 19, 2013 Presenter: Ross Gordon, PE, CFM, LEED.
1 Overview of ACC BTA Order and Planned Utility Response Process Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision.
Houston Region Import Capacity Project Planning for Reliable Power.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
1 Evaluation Plan for Geotargeted Efficiency Programs November 19, 2008.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Procuring Our Way to Compliance IEP 27 th Annual Meeting September 23, 2008 Fong Wan, PG&E.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Resource Adequacy in PJM
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
NERC LTRA Update / CDR Capacity Counting Issues
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
WGG Coal Retirement Case Transmission Repurposed for Renewables.
1 Demand Response Update April, Strategic Perspective Demand Response  Aligns with PGE’s Strategic Direction; helping to provide exceptional.
Economic Transmission Case Study: Champlain Wind Link Vermont System Planning Committee March 10, 2010.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
1 Docket 7081 Transmission Planning Information Workshops Third Workshop September 30, 2005 Shaping Demand-Side Resources To Address Transmission Constraints.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
The Need for Electric Transmission Improvements in Dane County.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
Network Customer Meeting Access Metric Update November 16, 2006.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
IRP in Vermont Docket 7081 Workshop Sept. 13, 2005.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
EPA Cooling System Regulations Hall of States Briefing February 22, 2011.
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
Regulatory Planning for Supply to GTA & Toronto Areas Presentation to Regulatory Affairs Standing Committee May 14, 2003.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
Long-Term Solution for Negative Generation Entergy Transmission AFC Stakeholder Meeting August 22, 2006.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Pasadena Water & Power Integrated Resource Planning “IRP” April 18, 2016 Leesa Nayudu, Resource Planning Manager.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Imperial Irrigation District 2016 Integrated Resource Plan: Imperial Irrigation District April 18th, 2016.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
Greenhouse Gas Initiatives: progress and perspective Sandra Meier Environmental Energy Alliance of New York.
National Grid Rhode Island: Piloting Wireless Alternatives
Subteam 1a Competitive Solicitations Framework Working Group Meeting
I-5 Corridor Reinforcement Project
Draft 2013 Energy-Efficiency Forecast
Windsor-Essex Electrical Service Needs and Solutions
Integrated Distribution Planning Process
Presentation transcript:

Central Vermont Public Service SOUTHERN LOOP COOLIDGE CONNECTOR Coolidge Connector Community Working Group April 30, 2007

Central Vermont Public Service Re-Cap of February 26 th Meeting Described resource options that can serve as NTAs Presented five alternative resource configurations (ARCs) for discussion Summarized results of comparing ARCs using VT societal cost test –Some ARCs had lower societal costs than the preferred transmission solution Further analyses to be performed Southern Loop Coolidge Connector - Preliminary NTA Study Update 2

Central Vermont Public Service Developments Since April 26th State-wide load level at which a solution is needed was lowered to 1,190 mw from 1,200 mw DPS memo lowered loss factors, lowered contribution from EE Revised societal cost analysis underway Risk evaluation and feasibility assessment of transmission solution and ARCs Further analysis indicated that ARC 1 is not a viable option Southern Loop Coolidge Connector - Preliminary NTA Study Update 3

Central Vermont Public Service Current Approach Preferred ARC is a combination of EE, DR, and local new generation Increased sense of urgency for action Parallel paths for implementation of solutions –DUs to explore increased EE, DR, new generation –VELCO to pursue permitting for transmission solution –Monitor load growth and implementation of NTAs If load growth meets or exceeds forecast, have transmission solution available Southern Loop Coolidge Connector - Preliminary NTA Study Update 4

Central Vermont Public Service Various Demand Forecasts with 1190 MW Clarifications Adjusted: Load forecasts include an additional ten MWs associated with increased losses due to Highgate OOS Planning assumption. Actual VT Demand: Includes a loss adder to reflect Reliability Assessment generation dispatch assumptions that differ from actual dispatch during the Peak and for 2002 an adjustment of ten MWs of load that was offline at the peak hour. Adjusted ISO Forecasted Demand: Loads prior to 2006 are a regression of the ISO forecast High Eco: LaCapras optimistic economic expectations load forecast Southern Loop Coolidge Connector - Need Analysis 5

Central Vermont Public Service Decision Point Southern Loop Coolidge Connector – Load Based Decision Model 6

Central Vermont Public Service DUs Plan for NTA ARC 3/4 takes advantage of other plans –Energy Efficiency budget increase thru 2008 –Geo-targeting per Act 61 –Peaking Generation and Ld Mgt per Forward Capacity Market –Renewable Generation and CHP per Act 61 –Generation Feasibility Study by DUs Southern Loop Coolidge Connector – NTA Planning & Implementation 7

Central Vermont Public Service Southern Loop Coolidge Connector – NTA Planning & Implementation 8

Central Vermont Public Service Proposed Next Steps Submit a §248 filing with the VT PSB for the transmission solution (late July- August) –Current Need Year = 2009 –Construction will take 18 months following receipt of all regulatory approvals and permits –Receipt of regulatory approvals and permitting could take up to ~25 months –Project maintains Vermont transmission in compliance with national reliability standards Which are now mandatory and can be enforced with substantial fines on 6/4/07 Monitor actual load levels vs MW need level –If load levels are tracking consistent with forecast, proceed with the transmission project Load levels that may impact the timing of the project lie within Vermont and outside of Vermont (New York and New Hampshire) due to the networked nature of the transmission grid –If load levels are tracking lower than forecast, considering pausing construction of the transmission project –If load levels are tracking lower than forecast, CVPS and VELCO will submit localized transmission designed to address local reliability issues in the Brattleboro-West Dummerston area Southern Loop Coolidge Connector – Transmission Planning & Implementation 9

Central Vermont Public Service Proposed Transmission Project Proposed Project Elements A new 51 mile 345 kV transmission line constructed in VELCOs existing ROW adjacent to an existing 345 kV line built in ~1970 New substations in Vernon and West Dummerston A substation modification at Coolidge substation Deferred Project Elements 115 kV lines or substations from West Dummerston-Stratton, Stratton-Bennington as DSM/DG will be implemented to defer the need Southern Loop Coolidge Connector – Transmission Planning & Implementation 10