Identify Problems, Planning Objectives and Constraints.

Slides:



Advertisements
Similar presentations
Ron Bass, J.D., AICP, Senior Regulatory Specialist Jones & Stokes Common NEPA Mistakes and How to Avoid Them January 17, 2008 Oregon Department of Transportation.
Advertisements

Introduction to Water Resources Planning. WELCOME.
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Implement the Plan. Implementation n Implementation bridges plan development and operations n Implementation is the cornerstone of plan success Need for.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Strategic Planning An Overview. General Definition The process of strategic planning involves deciding where you want to go, how you want to be positioned,
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
Formulate Alternatives. Accomplishments n Put together a team n Established a shared vision of the status quo n Identified problems n Defined planning.
Defining the Status Quo. Definition of Status Quo The “Status Quo” describes existing or anticipated conditions of a water resources system if policies,
AN INTRODUCTION TO STRATEGIC ENVIRONMENTAL ASSESSMENT
Identify Problems, Planning Objectives and Constraints
Farm Business Planning Dr. Laurence M. Crane
Workplace Safety and Health Program
Planning and Strategic Management
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 3: Phase Management - Inception.
IWRM PLAN PREPARED AND APPROVED. CONTENT Writing an IWRM plan The content of a plan Ensuring political and public participation Timeframe Who writes the.
Environmental Impact Assessment (EIA): Overview
Objective- and Strategic Analysis
IWRM as a Tool for Adaptation to Climate Change
Developing an IS/IT Strategy
AGENDA 09/09 & 09/10 F Nature of Strategic Challenge & F Strategic Management F The Strategy Concept and Process F Strategic Plan - Team Meetings.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Reaching Goals: Plans and Controls Today’s smart supervisor.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
BUILDING STRONG SM Plan Formulation: General Module G-1: What is plan formulation?
What If I Have to Go Beyond an IEE?. EA Training Course Tellus Institute 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs)
Stakeholder Analysis.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Creating a Shared Vision Model. What is a Shared Vision Model? A “Shared Vision” model is a collective view of a water resources system developed by managers.
1 Environmental Planning in the Army Corps of Engineers Ch 2 Mod 5 Relationship of the NEPA to Principles & Guidelines
CHAPTER 1 FOUNDATION. 1.1 National Environmental Policy Act (NEPA) “An act to establish a national policy for the environment, to provide for the establishment.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
M4 - 1 BU ILDING STRONG SM Multi-Purpose Projects Module M4: Telling the Plan Formulation Story.
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Chapter 7 FOUNDATIONS OF PLANNING © Prentice Hall,
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
1 Identify Preferred Alternative and Finalize Plan Planning Steps 7 & 8.
Measuring Results of Improvement Actions Márcio Rodrigues, Tallin, 13/01/2015.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
DEVELOPING THE WORK PLAN
An Agile Requirements Approach 1. Step 1: Get Organized  Meet with your team and agree on the basic software processes you will employ.  Decide how.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Evaluating Engagement Judging the outcome above the noise of squeaky wheels Heather Shaw, Department of Sustainability & Environment Jessica Dart, Clear.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
Environmental Planning in the Army Corps of Engineers Relationship of the NEPA to Principles & Guidelines 1 Ch 2 Mod 5
Chapter 7 FOUNDATIONS OF PLANNING 7.1© 2003 Pearson Education Canada Inc.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Strategic Environmental Assessment Patrick White and Nelly Isyagi.
Stakeholder consultations
Planning for Information System
Chapter 7 FOUNDATIONS OF PLANNING © Prentice Hall,
MGT 210 Chapter 8: Foundations of Planning
Foundations of Planning
WATER POLICY And Management in AlabamA
Water Resources Planning for an Uncertain Future Climate
Chapter 7 FOUNDATIONS OF PLANNING © Prentice Hall,
Strategic Environmental Assessment (SEA)
Chapter 7 FOUNDATIONS OF PLANNING © Prentice Hall,
INTERNATIONAL COMPETITIVE STRATEGY
Copyright © 2005 Prentice Hall, Inc. All rights reserved.
Managing the Planning Process
Managing the Planning Process
CJA/475 FORECASTING AND STRATEGIC PLANNING The Latest Version // uopcourse.com
CJA/475 CJA/ 475 cja/475 cja/ 475 FORECASTING AND STRATEGIC PLANNING The Latest Version // uopstudy.com
Presentation transcript:

Identify Problems, Planning Objectives and Constraints

Problem Identification n Successful plans address real problems n Problem identification directs future activities and the allocation of resources

A Shared Vision What is needed most is a Common Understanding of the Problem

Common Vocabulary Common Understanding of the Problem Requires:

Agreement on Appropriate Levels of Detail Common Understanding of the Problem Requires:

Willingness to Learn About the Issues Common Understanding of the Problem Requires:

The Process of Problem Identification

n Solicit input n Identify problems that currently exist, have been experienced in the past and are expected to recur, or could occur in the future n Identify the conditions under which these problems occur n Prioritize the problems identified To Begin

Importance of Goals and Planning Objectives Goals are general concepts n Economic efficiency n Environmental quality n Fairness n Health n Happiness Objectives are operational definitions of goals

Planning Is Iterative We will find ourselves refining all stages of the planning process. These are iterations When we iterate, we change the scale, time, focus or emphasis of the process. Iteration relies on feedback for knowing how much is good enough. We use different techniques planning detail in our iterations.

Screening Screening - separate the obviously bad from the others We screen on all levels of the planning process (goals, objectives, constraints, alternatives, data, processes, etc.) Screening is essential but over screening eliminates valuable choices.

Scoping Scoping - an open and early process for determining the scope of issues to be addressed an for identifying the significant issues related to a proposed action. (NEPA) 1. Invite participation of all parties 2. Determine scope and significant issues 3. Identify and eliminate from detailed study issues not significant or previously covered.

Scoping 4. Allocate assignments for preparation of EIS among lead agencies 5. Identify other public ongoing studies or other EISs 6. Identify other environmental reviews 7. Relate study timeline to decision making.

Other Considerations Planning Area “location of resources that would be directly or indirectly or cumulatively affected by alternative plans” Period of Economic Analysis Period over which we are to study, may be less than life of project Must be the same for all alternatives

Definition of Planning Objectives A planning objective is a concise, formally structured statement which outlines n What a plan should accomplish n Where a plans influence should be felt n When a plan should be initiated WHAT WHERE WHEN ?

Purpose of Planning Objectives Planning objectives are developed to n Focus efforts on problems of greatest concern n Ensure that multiple goals are explicitly considered throughout the process n Provide a common vision n Allow evaluation of a plan

Importance of Planning Objectives Without good planning objectives n Planning loses focus n Important interests ignored n Important problems not addressed n Effective alternatives not formulated n Plans cannot be evaluated n Implementation becomes impossible

Comments on Past Experience With Planning Objectives Experience suggests n Poor planning objectives are difficult to overcome n Reframing planning objectives late in a study results in lost time and higher costs n The importance of planning objectives is not fully appreciated n Planners (as well as engineers) do not embrace innovative approaches to meet planning objectives

Strategic Versus Tactical Planning Tactical plans n Contain effective responses that mitigate the adverse impacts of short term problems such as drought n Can be implemented quickly

n Contain long term responses related to resource availability, system management strategies, or legal frameworks n Requires time to implement Strategic Plans Strategic Versus Tactical Planning

Elements of Well Defined Plans Both tactical and strategic plans must include n Clearly stated policy objectives n Forecasts of future conditions n Evaluation criteria n Multiple alternatives n Comprehensive description of a preferred strategy

Strategic and Tactical Plans Are Interrelated Both contribute to system sustainability

Formulation of Planning Objectives 1. Identify problems of greatest concern 2. Translate problems into achievable objectives 3. Identify where this objective is to be met 4. Identify under what conditions the objective is to be met Objectives should be stated in a positive sense!

Two Sheets of Paper Every Planning Study should be able to summarize the “Problems and Opportunities” and the “Planning Objectives” on two sheets of paper. A fourteen-year old should be able to read these to his/her class and everyone in the room should be able to understand the essential features of the problem.

Problems and Opportunities

Examples of Poorly Defined Planning Objectives n Develop a drought contingency plan n Build a pumping station at the X reservoir n Evaluate instream flow requirements at the Y River basin n Avoid adverse effects to fish and wildlife during 50 year droughts n Enhance hydropower production

Examples of Well Defined Planning Objectives n Enhance the long term reliability of municipal water supply in the Y River basin n Ensure adequate instream habitat protection in the Y River basin during drought n Enhance fish and wildlife protection in the Z River basin during drought n Enhance annual hydropower production in the X River basin for the next 30 years n Maintain navigation on the X River during drought

Identification of Constraints

Definition of Constraints Constraints are limits to the range of planned responses Three types of constraints exist Natural - bound by the laws of nature External - enforced by outside agents Perceived - assumed to be undesirable, prohibited or impossible

Role of Constraints in the Planning Process Constraints are used in the planning process as n Situations that define the status quo n Screening criteria for alternatives n Guidelines for project evaluation

When Should Constraints be Challenged? Constraints should be challenged if they n Obstruct planning objectives n Significantly reduce alternative effectiveness n Address external agents that no longer exist n Are unfounded x

Summary n Problems should be identified and prioritized so that planning objectives can be properly formulated. n Planning objectives focus planning efforts and provide a framework for evaluating alternative solutions and formulating effective strategies. n Tactical and strategic plans, although inter-related, address different time scales and responses. n Planning objectives are essential elements of any tactical or strategic plan. n The impact of constraints, real or perceived

Exercise