TITLE: Resistance and Inductance Testing SWI:REVISION:DATE:PAGES:WORK STATION: Resistance-InductanceA1/1/2014# OF 103015 Technology in Motion STANDARD.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

LEUCEMIA MIELOIDE AGUDA TIPO 0
TITLE: Pilot Diameter and Depth Measuring SWI:REVISION:DATE:PAGES:WORK STATION: MI Shop-Pilot Dia./DepthB # OF 6Shop Technology in Motion STANDARD.
Title: Name 轴的检验 On this page is information about operators that are trained and certified to perform this Standard Work. The operators signing below.
TITLE: Pilot Diameter Measuring SWI:REVISION:DATE:PAGES:WORK STATION: MI Shop-Pilot Dia.A # OF 4Shop Technology in Motion STANDARD WORK INSTRUCTION.
Title: Name 最终装配垂直度检验 On this page is information about operators that are trained and certified to perform this Standard Work. The operators signing.
Bellwork If you roll a die, what is the probability that you roll a 2 or an odd number? P(2 or odd) 2. Is this an example of mutually exclusive, overlapping,
As a stand-alone overview of test tools.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
UNITED NATIONS Shipment Details Report – January 2006.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
Fractions SOL 3.5 :Students will name fractions. SOL 3.6: Students will compare two fractions.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
ZMQS ZMQS
Photo Composition Study Guide Label each photo with the category that applies to that image.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
AS9102 First Article Inspection Report
ABC Technology Project
TV Show Trivia Princeton Puzzle Hunt Do NOT flip over your answer sheet!
© S Haughton more than 3?
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
Twenty Questions Subject: Twenty Questions
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
© 2007 Lawrenceville Press Slide 1 Chapter 3 Margins.
Squares and Square Root WALK. Solve each problem REVIEW:
Energy & Green Urbanism Markku Lappalainen Aalto University.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
We will resume in: 25 Minutes.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
New Rubrics? Create Assignment and Project Templates and Send the Assignments in Tk20 Must do before you can use updated rubrics Theresa Dorn.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
How Cells Obtain Energy from Food
Chapter 30 Induction and Inductance In this chapter we will study the following topics: -Faraday’s law of induction -Lenz’s rule -Electric field induced.
Presentation transcript:

TITLE: Resistance and Inductance Testing SWI:REVISION:DATE:PAGES:WORK STATION: Resistance-InductanceA1/1/2014# OF Technology in Motion STANDARD WORK INSTRUCTION Trained and capable of performing this work: Date: Supervisor or engineer giving Approving to perform: Operator 2 Operator 5 Operator 6 Operator 4 Operator 1 Operator 3 On this page is information about operators that are trained and certified to perform this Standard Work. The operators signing below have read this SWI and have successfully performed the work described in it in the presence of the Supervisor or Engineer signing in the second column on the date in the third column.

TITLE: Resistance and Inductance Testing SWI:REVISION:DATE:PAGES:WORK STATION: Resistance-InductanceA1/1/2014# OF Technology in Motion STANDARD WORK INSTRUCTION Safety Requirements:Safety glasses In Process Check 1) 2) 3) 4) 5) Inductance and resistance testing station Operator Maintenance 1) 2) 3) 4) 5) Material / Components 1) 2) 3) 4) 5) Tools & Fixtures 1) Resistance meter (Harris Instruments, ) 2) Inductance meter (Sencore, LC53) 3) Inductance Meter Resistance Meter Inductance Test Fixture Resistance Test Fixture

TITLE: Resistance and Inductance Testing SWI:REVISION:DATE:PAGES:WORK STATION: Resistance-InductanceA1/1/2014# OF Technology in Motion STANDARD WORK INSTRUCTION Safety Requirements:Safety glasses In Process Check 1) Verify that wire insulation is not in connection. 2) 3) 4) 5) Operator Maintenance 1) 2) 3) 4) 5) Material / Components 1) Stator winding assembly 2) 3) 4) 5) Tools & Fixtures 1) Inductance test fixture 2) Inductance meter 3) 4) 5) 2. R-S Set the phase selector on test fixture to R-S. 1. Connect test fixture to meter 3. R S T Connect red wire to R, white to S and black or blue to T.

TITLE: Resistance and Inductance Testing SWI:REVISION:DATE:PAGES:WORK STATION: Resistance-InductanceA1/1/2014# OF Technology in Motion STANDARD WORK INSTRUCTION Safety Requirements:Safety glasses In Process Check 1) 2) 3) 4) 5) Operator Maintenance 1) Verify inductance meter calibration is current. 2) 3) 4) Material / Components 1) Print 2) 3) 4) 5) Tools & Fixtures 1) 2) 3) 4) 5) 4. Turn ON the inductance meter and set the correct range. 5. Compare the value measured on the inductance meter to range on print sheet. If not within range, notify Supervisor. 6. R-T Change the phase selector to R-T setting.

TITLE: Resistance and Inductance Testing SWI:REVISION:DATE:PAGES:WORK STATION: Resistance-InductanceA1/1/2014# OF Technology in Motion STANDARD WORK INSTRUCTION Safety Requirements:Safety glasses In Process Check 1) 2) 3) 4) 5) Operator Maintenance 1) 2) 3) 4) 5) Material / Components 1) 2) 3) 4) 5) Tools & Fixtures 1) 2) 3) 4) 5) 8. S-T Change the phase selector to the S-T setting. 7. Compare the value measured on the inductance meter to range on print sheet. If not within range, notify Supervisor. 9. Compare the value measured on the inductance meter to range on print sheet. If not within range, notify Supervisor.

TITLE: Resistance and Inductance Testing SWI:REVISION:DATE:PAGES:WORK STATION: Resistance-InductanceA1/1/2014# OF Technology in Motion STANDARD WORK INSTRUCTION Safety Requirements:Safety glasses In Process Check 1) Make sure the wire insulation in not within the connection 2) 3) 4) 5) Operator Maintenance 1) Verify resistance meters calibration is current. 2) 3) 4) Material / Components 1) 2) 3) 4) 5) Tools & Fixtures 1)Resistance meter 2)Resistance test fixture 3) 4) 5) 10. Plug the connectors from the resistance test fixture into the resistance meter. 12. R, S T Connect red wire to R, white to S and black or blue to T. 11. R-S Set the phase selector on test fixture to R-S.

TITLE: Resistance and Inductance Testing SWI:REVISION:DATE:PAGES:WORK STATION: Resistance-InductanceA1/1/2014# OF Technology in Motion STANDARD WORK INSTRUCTION Safety Requirements:Safety glasses In Process Check 1) 2) 3) 4) 5) Operator Maintenance 1) 2) 3) 4) 5) Material / Components 1) 2) 3) 4) 5) Tools & Fixtures 1) 2) 3) 4) 5) 14. Compare the value measured on the resistance meter to range on print sheet. If not within range, notify Supervisor. 13. Turn ON the resistance meter and set the correct range. 15. R-T Change the phase selector to R-T setting.

TITLE: Resistance and Inductance Testing SWI:REVISION:DATE:PAGES:WORK STATION: Resistance-InductanceA1/1/2014# OF Technology in Motion STANDARD WORK INSTRUCTION Safety Requirements:Safety glasses In Process Check 1) 2) 3) 4) 5) Operator Maintenance 1) 2) 3) 4) 5) Material / Components 1) 2) 3) 4) 5) Tools & Fixtures 1) 2) 3) 4) 5) 16. Compare the value measured on the resistance meter to range on print sheet. If not within range, notify Supervisor. 18. Compare the value measured on the resistance meter to range on print sheet. If not within range, notify Supervisor. 17. S-T Change the phase selector to the S-T setting.

TITLE: Resistance and Inductance Testing SWI:REVISION:DATE:PAGES:WORK STATION: Resistance-InductanceA1/1/2014# OF Technology in Motion STANDARD WORK INSTRUCTION Safety Requirements:Safety glasses In Process Check 1) 2) 3) 4) 5) Operator Maintenance 1) 2) 3) 4) 5) Material / Components 1) 2) 3) 4) 5) Tools & Fixtures 1) 2) 3) 4) 5) 20. Turn off the resistance and inductance meters. 19. Disconnect the stator from the test fixture. 21. Coil the wires of stator.

TITLE: Resistance and Inductance Testing SWI:REVISION:DATE:PAGES:WORK STATION: Resistance-InductanceA1/1/2014# OF Technology in Motion STANDARD WORK INSTRUCTION Signatures of Authorization Production:Manufacturing:Quality:Design:Other: Revision:Date:Reason for Change:Editor: A10/30/2006New SWI Introduction.Tony Dick