Value Engineering How DOT’s uses this valuable tool in project development What is it When is it used How do we use it.

Slides:



Advertisements
Similar presentations
Requirements Engineering Processes – 2
Advertisements

Project Appraisal Module 5 Session 6.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Information Systems Systems Development Chapter 6.
Integrated Approach to Area Master Planning in Jubail Industrial City
1 Quality Indicators for Device Demonstrations April 21, 2009 Lisa Kosh Diana Carl.
System Development Life Cycle (SDLC)
© 2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Aug. 22, 2007 Americas CF&S Kick Off Meeting 1 Overview of Value Engineering Program T. Lackowski.
Systems Analysis and Design: What is it? Systems analysis: the systematic study of the information needs and problems of some organizational domain in.
5.1.2 Situative Planning 1 Situative Planning - A Strategic Approach to Urban Planning UPA Package 5, Module 1.
Info1409 De Montfort University Lecture 3 The Systems Development Life Cycle Systems Analysis & Design Academic Year 2008/9.
CEM-512 Value Engineering Highway Project: South Interchange.
© Prentice Hall CHAPTER 9 Application Development by Information Systems Professionals.
KING FAHD UNIVERSITY OF PETROLEUM AND MINERALS CEM-512 Value Engineering Think Value Engineering Prakash Acharya Charles Pfrommer Charles Zirbel JOURNAL.
Computers: Tools for an Information Age
ABET 1 SAYS - Your Senior Design Course Should Include Engineering design is the process of devising a system, component, or process to meet desired needs.
System Development Life Cycle (SDLC)
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
SDLC. Information Systems Development Terms SDLC - the development method used by most organizations today for large, complex systems Systems Analysts.
Introduction to Systems Analysis and Design
© 2011 HDR All rights Reserved. Value Engineering Ken L. Smith, PE, CVS (360) April 27 th, 2011.
1 Major Highway Program Legislative Audit Bureau January 2004.
Achieving Value: The How and Why of Value Engineering Paul Johnson, CH2M HILL Presented at the PNWS – AWWA 2008 Annual Conference Vancouver, Washington.
Value Engineering. Definition Value Engineering (VE) is defined as a systematic process of review and analysis of a project, during the concept and design.
Virginia Department of Transportation (VDOT) Value Engineering Program Virginia Department of Transportation (VDOT) Value Engineering Program VDOT 6/14/2012.
Introduction to Systems Analysis and Design Trisha Cummings.
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
A Design Process.
A Design Process. What is Design? What is a Design Process? Design Process Examples Design Process used in IED The Design Process.
Design Process.  What is Design? What is a Design Process? Design Process Examples Design Process used in STEM.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Phase 1: Preliminary Investigation or Feasibility study
Computers Are Your Future © 2008 Prentice Hall, Inc.
Strategic Planning Management Control Systems Chapter 8 August 2014Iwan Pudjanegara SE., MM.1.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
Develop Project Charter
Feasibility Study.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
1 Introduction to Value Analysis Caltrans Delivers Value By Renee Hoekstra, CVS RH & Associates, Inc. for Caltrans.
SOFTWARE ENGINEERING. Objectives Have a basic understanding of the origins of Software development, in particular the problems faced in the Software Crisis.
Traditional Project Development Process ConstructionPlanningNEPA Design ROW CE, EIS, EA Location and Design Concept approval.
Developing a Purpose & Need Statement. Objectives  Understand when the P&N is developed in the PDP  Understand the importance of a well- written/well-justified.
A Design Process Introduction to Engineering Design
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Lecture 2. An Overview of Engineering Design JANUARY 2016 GE105 Introduction to Engineering Design College of Engineering King Saud University.
10-1 McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved.
Office of Major Project Development (OMPD) Overview November 2015.
MANAGEMENT INFORMATION SYSTEM
IS Development Methodology
Information Systems Development
Design and modeling 10 step design process
Fundamentals of Information Systems, Sixth Edition
FOR LOCAL AGENCY FEDERAL AID PROJECTS
System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)
Information Systems Development
Engineering Design Process
Introduction to Systems Analysis and Design
FOR LOCAL AGENCY FEDERAL AID PROJECTS
System Development Life Cycle (SDLC)
Term Project: Challenges in supplying Energy to Central Region
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
System Analysis and Design:
Presentation transcript:

Value Engineering How DOT’s uses this valuable tool in project development What is it When is it used How do we use it

What is Value Engineering  Value Engineering is a tool we use in project development  Builds consensus with partners

What is Value Engineering  Formal process that breaks components of a project into functions  A team of experts then identifies solutions that will satisfy the function  80% of a project cost can be found in 20% of the items

Value Engineering is:  Systematic problem solving process  Multi-discipline team approach  Life-cycle cost oriented  Value oriented ( Measurement of Scope Performance / Project Costs)  Function-based analysis  Free of normal design restrictions  A proven management technique

Value Engineering is not:  A DESIGN REVIEW  It is not intended to correct omissions in the design, nor to review calculations made by the designer. A COST CUTTING PROCESS  It does not cut cost by sacrificing needed quality, reliability or performance. ROUTINELY DONE ON ALL DESIGNS  It is not a part of the normal design process, but a formal cost and function analysis.

What Value Analysis Can Do  Focus on the “big picture”  Improve decision-making  Develop realistic budgets  Ensure required functions are addressed  Enhance understanding of total project  Challenge paradigms  Identify and remove unnecessary costs  Accelerate the design process  Encourage cross-discipline communication

OPPORTUNITY CURVE High Low Preliminary Concepts Design Construction Maintenance Potential For Savings / Improvements

When to Perform a VE Study  Concept stage (scoping)  Schematic design stage (beginning PS&E)  percent development stage

Value Engineering Team Make UP  We start with a small group of experts in the required disciplines (Design, Construction, Bridge, Environmental, Maintenance, Traffic)  Then we add partners from outside the DOT Cities, Counties, other agencies, outside funding sources, permitting agencies

VE Project Selection  23 CFR Part 627 requires VE on all Federal - Aid (NHS) projects of $25 million or more  Types of projects that can benefit from VE : complex projects, interchanges, major structures, new alignments, extensive traffic control, special processes/procedures unusually expensive

Value Engineering Success  Has not necessarily come by changing the scope or design  Has come from removing constraints or drivers often set by our partners

Phases of the VE Process Investigation Phase Investigate the background information, technical input reports, field data, function analysis, and team focus and objectives. Speculation Phase Be creative and brainstorm alternative proposals and solutions.

Phases of the VE Process Evaluation phase. Analyze design alternatives, technical processes, life cycle costs, documentation of logic, and rationale. Development phase. Develop technical and economic supporting data to prove the feasibility of the desirable concepts. Develop team recommendations. Both long & short term.

Phases of the VE Process Presentation Phase Present the recommendations of the VE team in an oral presentation to the Design Team and in a written report and workbook Implementation Phase Design Team then evaluates the VE Team’s recommendations and implements those acceptable to them

Phases of the VE Process Audit Phase Performance measures of the recommendations compiled and reported to FHWA

Value Engineering Tools Functional Analysis Feasibility Evaluation Matrix

How do we use Value Engineering  Guardrail around a bridge pier

F.A.S.T. How Why Functional Analysis System Technique Enhance Safety Protect Pier Re-direct Traffic Install Guardrail

How do we use Value Engineering  Function - re-direct traffic  Idea - Pile of dirt  Justification - Low cost & low maintenance  Becomes a design standard

SUMMARY OF PAST VE SAVINGS Federal-Aid Highway Program FY 2001FY 2000FY 1999 FY 1998 Number of VE Studies Cost of VE Studies Plus Administrative Costs $7.29 Mil.$7.78 Mil.$7.47 Mil.$6.58 Mil. Estimated Construction Cost of Projects Studied $18,882 Mil.$16,240 Mil.$18,837 Mil.$17,22 7 Mil. Total No. of Recommendations2,0132,0172,0822,003 Total Value of Recommendations$2,375 Mil.$3,483 Mil.$3,226 Mil.$3,085 Mil. No. of Approved Recommendations Value of Approved Recommendations $865 Mil.$1,128 Mil.$846 Mil.$769 Mil. Return on Investment119:1145:1113:1117:1