BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen 19 October 2006 1.What is the Megaports Initiative and which are its objectives? The.

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

1 WTO WORKSHOP ON TECHNICAL ASSISTANCE & CAPACITY BUILDING DESTINATION INSPECTION SCHEME (DIS) AS A GATEWAY OBJECTIVE FOR CEPS MODERNISATION, COMPLIANCE.
PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension W.I.
Agreement between the Village of Owego and Inflection Energy.
Ukraine, Кyiv, 2013 Presentation of LLC SERVICE-NS: Reliable and uninterrupted technical service of filling stations and petroleum storage depots, providing.
O T F O R D T O O L & G A U G E C O M P A N Y L I M I T E D The Design and Manufacture of Mini Applicators O T F O R D T O O L & G A U G E C O M P A N.
Narita International Airport Corporation All Rights Reserved. Yoshihiro Ozawa Planning Department Narita International Airport Corporation 21 April 2005.
Fuel Smart System NIORDC
Use of FuelTrac Card for Purchases of Gas for University Vehicles FuelTrac can ONLY be used in State owned Vehicles or those leased through the State Enterprise.
On the Customs front, massive changes have taken place under the Customs Modernisation Programme which was launched two years ago. As with Revenue, Customs.
Alabama State Port Authority Infrastructure for Tomorrows Market October 2005.
Inbound Logistics Incoming Cars 1.Delivery from outside of the EU – to the bonded warehouse from: Russia South-Korea Japan And other countries 2.Delivery.
BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen The Megaports Initiative in Antwerp.
Volunteering at Baxter Central.
Special Economic Zones of the Russian Federation Ministry for economic development of the Russian Federation Department of special economic zones, regional.
STEP 1 ARRIVAL OF MERCHANDISE AND DOCUMENTATION The merchandise arrives at the broker's terminal on the U.S. side of the border. The commercial invoice.
I2I2 Integrating Intermodal The Port of Huntington Tri-State Global Trade Center.
Temporary communications health quarantine command organization Central / Local Government Health sector Agricultural sector Transport.
Strategic Planning of Port Infrastructure
Business Introduction Table of Contents Introduction to Green Data, Inc.1 Green Data Services2 Scanning3 Archiving & Storage4 Shredding5 Consulting6.
ELECTRONIC FUNDS TRANSFER FINANCIAL INFORMATION SYSTEMS.
Verifying the Gross Mass of a Container FONASBA Gothenburg 2014.
Department of Transportation Support Services Branch ODOT Procurement Office Intergovernmental Agreements 455 Airport Rd. SE, Bldg K Salem, OR
California Integrated Waste Management Board Agreement with Air Resources Board for Surveillance Assistance Special Waste Committee Meeting May 10, 2006.
October ISPS and SMDG What is the possible impact of the ISPS code on the messages controlled by SMDG?
Port Security ECT Delta Terminal Rotterdam, The Netherlands.
COPAS B.V. ICT specialists for the Container Handling Industry Company profile (October 2004) Home base: Rotterdam, The Netherlands We travel all over.
Software Project Transition Planning
Presentation to CAREGROUP Board of Directors Governing Your Networked IT Organization Ken Peffers Applicable IT Research, Inc. November 21, 2002.
SiteManager Implementation Oklahoma Department of Transportation Charles Thurmon.
Building a Traffic Signal and Sign Inventory for the City of Edmond GIS Staff updated traffic feature classes and the related objects based on information.
1 Virtual Police Security System & Management Control May 2003.
Computers & Employment By Andrew Attard and Stephen Calleja.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kazakhstan.
Introduction of Sino-US Megaports Initiative DANG Xiaohong May, 2009.
1 Signature Delegation Training Presented by: Lucia Anderson January 2009.
TOWN OF TYNGSBOROUGH Article 6 Capital Exclusion Overview.
Texas Secretary of State Elections Division133rd SOS Election Law Seminar Election Funds Management Texas Secretary of State Primary Financing.
How Megaports Screens ContainersSlide 1 How Megaports Screens Containers Asia Regional Technical Workshop on Megaports Initiative Bangkok, Thailand May.
Decision making process / basic options assessment Mercury Storage and Disposal LAC Two Countries Project Gustavo Solórzano Ochoa, Consultan t Montevideo,
U.S. Department of Agriculture eGovernment Program July 23, 2003 eAuthentication Initiative Agency Responsibilities and Funding Discussion eGovernment.
Protecting our Border Securing our Future Presentation to Industry LAE Monday 12 th November 2012 Mr Ray Paul Commissioner PNG Customs Service Container.
Advantages Cloud Computing. customers only pay for the access and interfaces that they need. The customer buys only the services they need Cost Advantages.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Port of Rotterdam.
Monitoring of Radiologically Contaminated Scrap Metal Czech experience Milan Hort State Office for Nuclear Safety Czech republic UNECE Group of Experts.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
Local Alarm Station Data Acquisition, Storage and Visualization for Radiation Portal Monitor (RPM).
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Special Economic Zones of the Russian Federation Ministry for economic development of the Russian Federation Department of special economic zones, regional.
Welcome to the presentation from Bangladesh team. Welcome to the presentation from Bangladesh team.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Unified Border Information System - UBIS A Needs Assessment.
IAEA 1 - Issuing regulations a, b The regulators of transport in Republic of Belarus are Department of supervision for the safe industrial activities and.
DARDNI PORTAL INSPECTION PRODUCTS OF ANIMAL ORIGIN IMPORT CONTROLS Michael Coyle OVS.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kyrgyz Republic.
Implementation of Megaports in Belgium. Partners in the Initiative Why Antwerp? - volume - Logistical importance Why Megaports? - European context - Commercial.
Presented by; Capt. Ravi Jayawickreme WHAT IS THE SIGNIFICANCE OF MEGAPORTS IN COLOMBO Megaports - A system of equipment installed, people trained, and.
IAS 16.  Initially recognised at cost  Cost – amount of cash or cash equivalents paid or fair value of other consideration given to acquire asset 
Scientific Engineering Center ''Nuclear Physics Research (''YAFI'') St-Petersburg, RUSSIA 2014.
Activity concentration determination of NORM radionuclides in large quantity containers. Dr. Wouter Schroeyers (project coordinator NuTeC-NORM) Dr. Tim.
Safety of premises P. K. Frandsen SM 18 LHC Magnet test review 21 JUN 2005.
Enhanced Wireless Funding through HB 361 Shawn S. Smith Interim Ohio Coordinator.
Developing National Capacity for Integrated Border Management (IBM) in Lebanon Border Management Equipment.
AUTOMATIC NUMBER PLATE RECOGNITION SYSTEM
Empowering Your Business Infrastructure CORPORATE PROFILE PRESENTATION.
Principles of Information Systems Eighth Edition
PRESENTATION OF MONTENEGRO
2-6 June 2014 Panama City, Panama
Decisions on what to build: Thoughts from one who has worked on both sides Sarena D. Burch Sr. VP – Fuel Procurement and Asset Mgmt SCANA Corporation.
Presentation transcript:

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen 19 October What is the Megaports Initiative and which are its objectives? The Megaports Initiative is a project of the National Nuclear Security Administration (N.N.S.A.), a division of the U.S. Department of Energy. On November 24 th, 2004 Belgium and the United States signed a Memorandum of Understanding. The port of Antwerp is the first Belgian port to implement the MPI. This does however not exclude the implementation of MPI in other Belgian ports. The main goal of the project is to inspect the container cargo in the largest seaports (‘Megaports’) and to detect the illicit trafficking in radioactive and nuclear material in order to deter possible terrorist actions and to obtain information about terrorist networks. For the United States, the Megaports Initiative project in the port of Antwerp has been the most important MPI project so far.

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen 19 October How to achieve this goal? All containers have to be inspected by means of radiation portal monitors. The container proceeds through the portal. Detectors in the portal monitors measure the Gamma and Neutron radiation of the containers passing through. The port of Antwerp is a vast area and has dozens of ‘entrances’. Moreover these ‘entrances’ are also used for non-port-related traffic (f.i. staff of the chemical and car assembly industry). All connections with the hinterland are congested. Putting fences around the port and installing portal monitors at all entrances and exits is unrealistic. The port of Antwerp has 10 container terminals. Therefore all entrances and exits (both for road transport as for rail transport) of these terminals need to be equipped with portal monitors. Containers transported by barge will be checked by the portal monitors on the terminals themselves.

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen 19 October How to achieve this goal ? There are several portal monitors per terminal. On each terminal the portal monitors are connected with a Local Alarm System (LAS). This station is situated at the exit (gate-out) of each terminal. Secondly all terminals of the port are (by means of a special optical fibre backbone) connected with a Central Alarm Station (CAS). There are two Central Alarm Stations: one at the Left Bank (located at the future border inspection post) – for all Left Bank terminals – and one at the Right Bank (located at the scan site near the Tijsmanstunnel) – for all Right Bank terminals –.

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen 19 October Who is responsible for the project? U.S. Government is responsible for the purchase and the installation of the material. US Government also takes care of the maintenance of the material and the training of the Belgian staff. By ‘material’ we mean: the portal monitors, all hardware and software, the handheld equipment… Once the test phase is finished and the temporary acceptance has been signed, all material becomes property of the Belgian Government. Until now the U.S. Government has invested 40 million dollar in the Antwerp project Belgian Government pays VAT and other taxes on the construction works. This is a onetime cost of several million euro. About one hundred customs officers will work exclusively on the Megaports Initiative project. The Belgian FPS Finance leases an optical fibre backbone for the connection between all portal monitors and the two Central Alarm Stations. This will cost about Euro per year.

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen 4. The port of Antwerp

BELASTINGEN EN INVORDERINGEN Administratie der Douane en Accijnzen 5.What happens when a container generates an alarm? Phase 1 : The portal monitor raises an alarm The technical measuring data and the video images of the containers are immediately transmitted to the CAS through the optical fibre network. The terminal operator is informed electronically of the non-release of the container, awaiting a decision of the CAS. On the basis of a radiation profile and requested information on the consignment, the CAS will either resolve the alarm or proceed to a second inspection. The alarm rates are expected to be 5 to 10% of all trucks in Phase 1. If the alarm is not resolved, Phase 2 becomes effective. Phase 2 : The container is inspected by CAS personnel from the outside by means of handheld equipment allowing customs authorities to obtain more information on the exact location and the nature of the substances generating radiation. These officials will decide either to release the container, either to call upon the assistance of an approved organisation. Approximately 2 to 5% of the Phase 1 alarms will require a Phase 2 inspection. Phase 3 : The container is transferred to the CAS. The CAS is equipped with the necessary facilities for unloading and loading of goods. Checks are performed by an acknowledged expert. A container can, in exceptional cases and at the request of the Belgian FANC, be isolated on the spot. The amount of Phase 3 checks is estimated at a couple of dozens a year.