Engineering economics

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Chapter 5 Mathematics of Finance.
Chapter 03: Mortgage Loan Foundations: The Time Value of Money
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Which table represents a function?
Review of the Accounting Process
Time Value of Money Concepts
Chapter 5 Mathematics of Finance.
Chapter 16: Depreciation
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 4 Future Value, Present Value and Interest Rates.
STATEMENT OF CASH FLOWS
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Leasing Chapter Twenty-Six.
Building: Knowledge, Security, Confidence Pay Yourself First FDIC Money Smart for Young Adults.
Who Wants To Be A Millionaire? Decimal Edition Question 1.
1 Credit Cards Avoid the Minimum Payments Trap! 3% examples Revised November 2012.
Exam in One week, will cover Chapters 1 and 2. Do Chapter 2 Self test.
Some Practice Questions in Engineering Economics
MER439- Design of Thermal Fluid Systems Engineering Economics Lecture 2- Using Factors Professor Anderson Spring 2012.
Risk, Return, and the Time Value of Money
Exam 2 Practice Problems
Chapter 11 Cash Flow Estimation
Section 5.5 – Exponential and Logarithmic Models
Test 1 solution sketches Note for multiple-choice questions: Choose the closest answer.
Time Value of Money.
Learning Objectives for Section 3.2
Copyright © Cengage Learning. All rights reserved.
Chapter 3 Mathematics of Finance
Electronic Presentations in Microsoft® PowerPoint®
Chapter 3 Mathematics of Finance
Chapter 3 Mathematics of Finance
Operations Management
Capital Budgeting Problems
Chapter 14 Personal Financial Management
FIN 3000 Chapter 5 Time Value of Money Liuren Wu FIN3000, Liuren Wu.
Key Concepts and Skills
Annuities and Sinking Funds
Copyright © Cengage Learning. All rights reserved.
Hawawini & VialletChapter 8© 2007 Thomson South-Western Chapter 8 IDENTIFYING AND ESTIMATING A PROJECTS CASH FLOWS.
MCQ Chapter 07.
McGraw-Hill © 2004 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Introduction to Valuation: The Time Value of Money Chapter 4.
Chapter 4: Time Value of Money
6-1 CHAPTER 5 Time Value of Money The most powerful force in the universe is compound interest-Albert Einstein Future value Concept/Math/Using calculator.
The Time Value of Money.
Chapter ChEn 4253 Terry A. Ring
Time Value of Money Time value of money: $1 received today is not the same as $1 received in the future. How do we equate cash flows received or paid at.
5 Time Value of Money 5.1 Explain the importance of the time value of money and how it is related to an investor’s opportunity costs. 5.2 Define simple.
2-1. McGraw-Hill/Irwin Copyright © 2006 The McGraw-Hill Companies, Inc. All rights reserved. 2 Money Management Skills.
Time Value of Money Concepts
Section 4B Savings Plans and Investments Pages
Present value, annuity, perpetuity
The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin CHAPTER 10 Planning for Capital Investments.
Introduction to Valuation: The Time Value of Money
Chapter 5: Time Value of Money: The Basic Concepts
12 Financial Management 12-1 Financial Planning
Reporting and Analyzing Cash Flows
Chapter 15: Supply Chain Finance. Chapter 15Management of Business Logistics, 7 th Ed.2 Learning Objectives - After reading this chapter, you should be.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Long-Term Liabilities Chapter 15.
Bajtelsmit, Personal Finance: Skills for Life © John Wiley & Sons 2006 Chapter 15 Saving for Distant Goals: Retirement & Education Funding.
PSSA Preparation.
Chapter 3 Mathematics of Finance Section 3 Future Value of an Annuity; Sinking Funds.
Key Concepts and Skills
Cash Flow Problems are 5 Types Invest and Earn –solve with NPV, maybe IRR or tweeked IRR or ERR All Cost Investment Alternatives –develop cash flows for.
Topic 9 Time Value of Money.
7-1: Buying a Home. Costs of Financing a home: Purchase price = tag price Downpayment = a percentage of the purchase price; between 0% and 30% Interest.
Naval Postgraduate School Time Value of Money Discounted Cash Flow Techniques Source: Raymond P. Lutz, “Discounted Cash Flow Techniques,” Handbook of Industrial.
1 Engineering Economics Engineering Economy It deals with the concepts and techniques of analysis useful in evaluating the worth of systems,
Chapter 3 Part 2.
Chapter Five Appendix DEPRECIATION METHODS.
Straight-Line Depreciation
Presentation transcript:

Engineering economics Cheat sheet Basic Economics (Time value of money) - Present/Future Value - Series Payment - Series and Future value - Future Value and Arithmetic gradient - Uniform Series and Arithmetic gradient  Do a cost comparison Cost/Benefits of owning Equipment Purchase Cost – Outflow Salvage value – Inflow Tax savings from Depreciation – Less Outflow ( will talk about later) Major repairs and overhauls – outflow Taxes – outflow Insurance – outflow Storage/Misc – outflow Operating Cost – outflow (fuel, lube, filters, minor repairs, tires, etc) Replacement Decisions Analysis Rent/Lease/Buy Decisions Depreciation (3 methods) Straight Line Methods Sum of the years Digit Method Declining balance Method www.learncivilengineering.com

present/future value- Basic economics (Time value of money) - As everyone knows if you put money in the bank, and your money earns interest, the amount of money in the bank will increase over time. These type of problems can be solved with equations and/or value tables. Table is the quicker way however, you may have to use equations for some problems that are not as straight forward. present/future value- The equation for calculation Present/Future Value is; F= P(1+i)n or P = F/ (1+i)n F = Future value after n time P = Present Value i = interest rate per period n = number of periods sometimes the problem calls for you to find the interest rate; i= (F/P)1/n – 1 Quick Ex Problem to illustrate point: You put $2000 in a savings account that generates 3% interest per year (annual). What is the value after 10 years. Solution: P = $2000, i= .03, n = 10 years F= P(1+i)n = $2000(1+.03)10= $2000(1.344) = $2,687 Try using the charts and see if you can get the same answer – Look in the F/P section. F = x(P), x = number from chart What is the solution if the 3% interest rate was per month? Solution: i= .03, n=10 years(12months/year) = 120, $2000(1+.03)120= $2000(34.7) = $69,422 What is the solution if the 3% interest rate was per year but compounded monthly? Solution: i= .03/12 = .0025, n=10 years(12months/year) = 120, $2000(1+.0025)120= $2000(1.35) = $2,699  which is more than same interest rate compounded yearly What is the interest rate if you invested $7,000 and receive $11,000 after 7 years? - i= (F/P)1/n – 1 = ($11,000/$7,000)1/7 – 1 = .067 = 6.7 % www.learncivilengineering.com

Series payments- Number 1 Type is the common loan payment schedule that we are all used to. If you get a loan for a car, house or a construction business loan, this is the equation you need to figure out what are your monthly payments. The equation for calculating a Present Value/Series payment is; P=A[(1+i)n- 1]/[i(1+i)n] A = Series Payments P = Present Value i = interest rate per period n = number of periods Quick Example Problem to illustrate point: You acquire a 10 year bank loan for $2,000,000 for a construction project at a 3.5% annual interest rate. What are your monthly payments? Solution: P = $2,000,000, i= .0029, n = 10 years = 120 months P=A[(1+i)n- 1]/[i(1+i)n] = A=P/[(1+i)n- 1]/[i(1+i)n) = A=$2,000,000/[(1+.0029)120- 1]/[.0029(1+.0029)120) = A =$2,000,000/[1.415- 1]/[.0029(1.415)] = A =$2,000,000/[.415]/[.0041] = A =$2,000,000/[101.22] = $19,759 Try using the charts and see if you can get the same answer – Look in the A/P section. Number 2 Type is the common investment strategy. You make a series of investments/payments and you assume a interest rate, what is the lump sum in the future. The equation for calculating a Future Value/Series payment is; F=A[(1+i)n- 1]/[i] A = Series Payments F = Future Value You make a $10,000 yearly payment to your 401K for 20 years, assuming a 7% annual rate of return. How much money should you have when you retire in 20 years. Solution: F = $10,000, i= .07, n = 20 years F=A[(1+i)n- 1]/[i] = $10,000[(1+.07)20 – 1]/.07 = F = $409,954 Try using the charts and see if you can get the same answer – Look in the F/A section. www.learncivilengineering.com

Arithmetic gradient- Arithmetic gradients are when payment increase after every payment. It is not very common in loans or investments. However, if you know that every year or month you are going to increase your investment to figure out the future value you will need to use these formulas. The equation for calculating Future Value and Arithmetic Gradient is; F=G/i[((1+i)n- 1)/i)-n] F = Future Value G = Arithmetic Gradient (Value increased per period) i = interest rate per period n = number of periods Quick Example Problem to illustrate point: You are making monthly payments of 0, 500,1000,1500, etc for 11 years. What is the lump sum payment after 11 years if the interest rate is 5%? Solution: G = $500, i= .05, n = 11 years  F=G/i[((1+i)n- 1)/i)-n] = $500/.05[((1+.05)11- 1)/.05)-11]  = $500/.05[((.71)/.05)-11] = = $500/.05[((14.21)-11] = = $500/.05[3.21]  $500/.05[3.21] = $32,100 Try using the charts and see if you can get the same answer – Look in the F/G section. The equation for calculating Present Value and Arithmetic Gradient is; P = Present Value www.learncivilengineering.com

Series payments- Number 1 Type is the common loan payment schedule that we are all used to. If you get a loan for a car, house or a construction business loan, this is the equation you need to figure out what are your monthly payments. The equation for calculating a Present Value/Series payment is; P=A[(1+i)n- 1]/[i(1+i)n] A = Series Payments P = Present Value i = interest rate per period n = number of periods Quick Example Problem to illustrate point: You acquire a 10 year bank loan for $2,000,000 for a construction project at a 3.5% annual interest rate. What are your monthly payments? Solution: P = $2,000,000, i= .0029, n = 10 years = 120 months P=A[(1+i)n- 1]/[i(1+i)n] = A=P/[(1+i)n- 1]/[i(1+i)n) = A=$2,000,000/[(1+.0029)120- 1]/[.0029(1+.0029)120) = A =$2,000,000/[1.415- 1]/[.0029(1.415)] = A =$2,000,000/[.415]/[.0041] = A =$2,000,000/[101.22] = $19,759 Try using the charts and see if you can get the same answer – Look in the A/P section. Number 2 Type is the common investment strategy. You make a series of investments/payments and you assume a interest rate, what is the lump sum in the future. The equation for calculating a Future Value/Series payment is; F=A[(1+i)n- 1]/[i] A = Series Payments F = Future Value You make a $10,000 yearly payment to your 401K for 20 years, assuming a 7% annual rate of return. How much money should you have when you retire in 20 years. Solution: F = $10,000, i= .07, n = 20 years F=A[(1+i)n- 1]/[i] = $10,000[(1+.07)20 – 1]/.07 = F = $409,954 Try using the charts and see if you can get the same answer – Look in the F/A section. www.learncivilengineering.com

Depreciation- Depreciation means the decline in fair market value of an item due to its age and it standard deterioration. There are two very separate uses for depreciation. One is for tax liability and the other one is for calculation the allocation of the cost of the asset per time period used. The Main methods for depreciation are 1. Straight Line Method 2. Sum of the years Digit Method 3. Declining balance Method 4. 200% Declining Balance Method Straight Line Method This is the simplest and most often used method. All you do is estimate the salvage value of the asset at the end of a time period. Then subtract that salvage value from the initial value and divide by the time period. That value will be the depreciation per year. Dn = (Initial Cost – Salvage Value)/ N Dn = Depreciation per period N = Equipment life per period Example: A dozer that you own depreciates over a 7 year period and was purchased for $168,000 and will have a salvage value of $30,000. a. What is the depreciation value per year? What is the book value of the dozer at the end of two years. b. What is the book value of the dozer at the end of two years. Answer: a. Find Dn = $168,000 - $30,000 = $138,000/7 = $19,714 b. Find book value = Initial Cost – Dn(n) = $168,000 – ($19,714)(2years) = $128,572 www.learncivilengineering.com

Depreciation- Sum of the year Digit Method This method is a depreciation that results in a more accelerated write off than straight line but less than declining balance method. The sum of the digits can be determined by using the following formula; Dn = (n2 + n)/ 2 , where n is equal to useful life of the assets Or just sum the digits. So for an example if the useful life of an asset is 5 years. The sum of the would be (52 + 5)/2 = 15, or 5+4+3+2+1 = 15 The depreciation rates are as follows if you are using the 5 years of the useful life - For example: 1st Year: 5/15, 2nd Year: 4/15, 3rd Year: 3/15, 4th Year: 2/15, 5th Year: 1/15 Example: A dozer that you own depreciates over a 7 year period and was purchased for $168,000 and will have a salvage value of $30,000. a. Using the Sum of the year Digit Method. What is the depreciation value by year? b. What is the book value of the dozer at the end of two years. Answer: Find Dn = (72 + 7)/2 = 28 , 7+6+5+4+3+2+1 = 28 1st Year: $168,000 - $30,000 = $138,000(7/28) = $34,500  2nd Year: $138,000(6/28) = $29,571 3rd Year: $138,000(5/28) = $24,643 4th Year: $138,000(4/28) = $19,714 5th Year: $138,000(3/28) = $14,785 6th Year: $138,000(2/28) = $9,857 7th Year: $138,000(1/28) = $ 4,928 b. Find book value = Initial Cost – Dn(n) = $168,000 – ($34,500+$29,571) = $103,929 www.learncivilengineering.com

Depreciation Calculation Declining Balance Depreciation Method This method accelerates the depreciation since a large part of the depreciated cost is taken at the beginning of the life of the asset. To calculate declining balance depreciation the depreciable basis of the fixed asset is multiplied by a factor. The factor is the percentage of the asset that would be depreciated each year under straight line depreciation times an accelerator. For example, an asset with a five year life would have 20% of the cost depreciated each year. If the accelerator is 200% then the factor would be 40% (20% x 200%). The 200% accelerator is referred to as double declining balance and is the most common. But you put 150% or any accelerator percentage if it was specified. Example: A dozer that you own depreciates over a 7 year period and was purchased for $168,000 and will have a salvage value of $30,000. a. Using the double declining balance. What is the depreciation value by year? b. What is the book value of the dozer at the end of two years. Using double declining balance the depreciation would be calculated as follows: factor = 2 * (1/7) = 0.285 Year Depreciable Basis Depreciation Calculation Depreciation Expense Book Value 1 $168,000 $168,000 * .285 = $47,880 $120,120 2 $120,120 * .285 = $34,234 $85,886 3 $85,886 * .285 = $24,478 $61,409 4 $61,409 * .285 = $17,502 $43,907 5 $43,907 * .285 = $12,514 $31,393 6 $31,393 * .285 = $8,947 SV - $1,393 $30,000 7 - since the salvage value was $30,000 after the 6th year, you weren’t able to use anymore depreciation. If the salvage value was lower you would be able to. Book value after 2 years is $85,886. www.learncivilengineering.com