CS-TR-095 Transactions Detail Inquiry, 3.21.1 RCT - WO DR 1500 (Inventory) $1,220.01 Qty issued x Total GL cost 1,000 x 1.22001 = 1,220.01 CR 1600 (WIP)

Slides:



Advertisements
Similar presentations
Chapter 23 Invoice Verification
Advertisements

Visualize Success 2011 Alan Chorney Professional Services Visual South, Inc. Troubleshooting Costing Visualize Success 2012.
Standard Cost Accounting in Oracle ERP
Flexible Budgets and Standard Costs
CS-PR – Cost Roll-Up Freeze/Unfreeze Sets costs so roll-up functions do not recalculate Used in accordance with your setting of standards.
CS-SU-067 RCT - WO DR 1500 (Inventory) CR 1600 (WIP) Qty x (Total GL Cost) 1,000 x = $1, RCT - WO DR 1500 (Inventory) CR 1600 (WIP) Qty.
MANAGEMENT ACCOUNTING
Process Costing Chapter 04 Chapter 4: Process Costing
Chapter 1: Introduction to MYOB Accounting Plus
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Standard Costs: Direct Labor and Materials Chapter Twelve.
Operations Scheduling
Standard Costs and Variances
RXQ Dual Billing Process Flow Distribution Company Supplier Customer Distribution Company reads meter(s) ( ) Supplier receives and processes.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 9 Recording and Evaluating Conversion Process Activities.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Oracle EBS: Buy/Sell Subcontracting
12 Financial Management 12-1 Financial Planning
What’s with all these numbers?
Manufacturing Order Variances
Slides prepared by JOHN LOUCKS St. Edward’s University.
1 of 29 DA Purchase Invoice Matching to Goods Received Last updated: DA0533 Purchase Invoice Matching to Goods Received DA Purchase Invoice.
Ultriva Users Conference 2012 RTS And Pick List Presented by Nandu Gopalun.
Standard Costing and Variance Analysis
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Training Monday, February 04, Saturday, October 11, Welcome to the Accounts Payable Invoice Processing Course.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
A Closer Look at Food Cost
Week 1.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
Logan Consulting Unlocking the Secrets of WIP Unlocking the Secrets of WIP Nadia Truxell.
Case Study. Agenda Introductions Endologix Overview Project Overview Labeling Process Transaction Specifics Impact on the process Questions & Answers.
1 of 17 DA General Ledger WIP Variance Links Last updated: October 2005 DA0501 General Ledger WIP Variance Links.
The Production Process
Lecture 6 Cost Variances for Direct Costs. The derivation of the price and efficiency variances AP ACTUAL COST AQ AP = actual price per unit of input.
LEARNING OBJECTIVE: Compute the variable manufacturing overhead rate and efficiency variances. Explain how direct materials standard and direct labor standards.
perform extensive cost simulations using unlimited cost types determine profit margin using expected product costs update standard costs from any.
QAD Routings Implementation Sheri Forrest – RFBP Nadia Truxell – Logan Consulting.
Introduction SAP Manufacturing Execution (ME) Dr. Djamal Ziani King Saud University.
California User Group October 11, 2011 Santa Barbara, CA Paul Rubin Advanced Repetitive – Advanced Tools for Managing WIP.
 SAP AG 2007 Production Maintaining bills of material (BOM) Production process Contents:
 SAP AG 2007 Production Maintaining bills of material (BOM) Production process Contents:
Performance Evaluation
Production Process Contents: Maintaining bills of material (BOM) Production process.
Variance Analysis Chapter 8. Material Costs Total Quantity X price Total Quantity = good units X Standard Qty per unit.
Midwest User Group September 23, 2013 Grand Rapids, MI Paul Rubin Strategic Information Group Advanced Repetitive vs. Work Orders The Great Debate.
Introduction to Managerial Accounting Chapter M1.
1 Brenda Mallouk Standard Costing I Management Accounting One.
 Total Quantity X price  Total Quantity =  good units  X  Standard Qty per unit.
OAUG Cost Sub-Committee – 1 Manufacturing Variances October 20, 2009 Discrete Manufacturing SIG Cost Sub-Committee Manufacturing Variances October 20 th,
Chapter 9 Introduction to a Standard Cost System.
Financial Accounting 1 Lecture – 16 Recap Stock accounts Purchases account Stock in trade Other manufacturing costs Cost of goods sold Recording of stock.
AutoSimply Process Flow. Legend System Process Manual Process System Document Manual Document Flow Connector to another slide Terminator Predefined Process.
XA Standard Costing for the Non-Accountant Rick Altenau, CPIM, CIRM Guide Technologies, LLC (513) x123 XA.
GLENCOE / McGraw-Hill. Controlling Manufacturing Costs: Standard Costs.
Setup and Demo in D365 Subcontracting in AX.
Production Cost Variance Analysis
WIP examples
Dynamics GP Manufacturing
Production Contents: Maintaining bills of material物料清單(BOM)
Cost Accounting Deep Dive
STANDARD COSTS AND VARIANCE ANALYSIS FOR DECISION MAKING
Understand Freight Allocations
Presentation transcript:

CS-TR-095 Transactions Detail Inquiry, RCT - WO DR 1500 (Inventory) $1, Qty issued x Total GL cost 1,000 x = 1, CR 1600 (WIP) $1, GL transaction type = IC OVH POST DR 1600 (WIP) $100 Qty issued x GL Overhead cost: 1,000 x 0.10 = 100 CR 6490 (Overhead Applied) $100 WO Receipt – Transactions Detail

CS-CS-218 Work Order Receipt, WO Receipt

CS-TR-194 Work Order Topics Work Order Life Cycle Introduction Work Order Cost Report WO Maintenance Screen Component Issues WIP Material Cost Revaluation Floor Stock Intersite Transfers/Multi- site Component Issues Labor Reporting Work Order Receipts Non-Std Work Orders WO Accounting Close Information Sources

CS-TR-083 Variance When Calculated Subcontract Rate PO Receipt, Calculated only if WO number and operation are specified Cause Difference between actual subcontract rate (PO price) and the subcontract rate entered in the routing detail View both actual and standard subcontract rates in Receipt Transactions Report, Subcontract Usage WO Accounting Close, 16.21Difference between the subcontracted quantities received and the work order quantity completed. This variance can be due to yield differences, rework requirements, etc. Formula [Qty Rcvd on PO - (Qty Complete + Qty Reject)] x Subcontract Frozen WO BOM Unit Rate Formula (Subcontract PO Unit Rate - Subcontract Frozen WO BOM Unit Rate) x Qty Received Subcontract-Related Variances

CS-TR-079 Subcontract PO ReceiptGL Trans Type DR Cost of Production (COP)IC CR PO Receipts Issue to WIP DR WIPWO CR Cost of Production DR Subcontract Rate VarianceWO CR WIP Positive amounts = unfavorable variance Negative amounts = favorable variance If purchase order, of type S, does not reference a work order, then subcontract amount stays in COP Subcontract – GL Effect * *

CS-TR-063 Variance When CalculatedCause [(Act Set-Up Hrs - Std Set-Up Hrs) x Set-Up Bdn] + [(Act Run Hrs - Std Run Hrs) x Std Run Bdn] Where: Set-Up Bdn = (Std Set-Up Rate x Lbr Bdn%) + Lbr Bdn Rate + (Mach Bdn Rate x Mach/Op) Run Bdn = (Std Run Rate x Lbr Bdn%) + Lbr Bdn Rate + Mach Bdn Rate Labor Burden Usage Variances Manufacturing-Related Variances Work Order Cost Report, View in Report Formula Labor Burden Usage SFC feedback (17.1, 17.2, 17.3); or WO Receipt (16.11/12) Equivalent to labor usage variance with burden rates factored in

CS-TR-063a Variance When CalculatedCause Labor Usage SFC feedback (17.1, 17.2, 17.3); or WO Receipt (16.11 or 16.12) Can be deferred until WO Receipt, 16.11/16.12, based on WO Control File setting Difference between actual lbr hrs reported and the std time that should have been required to complete the quantity received View both actual and earned hours in WO Routing Maintenance, [(Act Set-up Hrs - Std Set-up Hrs) x Std Set-Up Rate] + [(Act Run Hrs - Std Run Hrs) x Std Lbr Rate] Std Run Hrs = Run Hrs/Unit x (Qty Complete + Qty Reject) Formula Labor Usage Variances Manufacturing-Related Variances Work Order Cost Report, View in Report