SksMinus status 03 HB meeting 2008/5/02 白鳥昂太郎.

Slides:



Advertisements
Similar presentations
Final(?) Design of G0 Upstream Shielding Larry Bartoszek BARTOSZEK ENGINEERING 10/22/05.
Advertisements

Joanne Beebe-Wang 7/27/11 1 SR in eRHIC IR Synchrotron Radiation in eRHIC IR and Detector Background Joanne Beebe-Wang Brookhaven National Laboratory 10/
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
SKS Minus Detectors in detail Tohoku Univ. K.Shirotori.
Discussion on cosmogenic taggers With some thinking by : M.Weber, F.Pietropaolo, A.Guglielmi, M.Ne.
1 Downstream scraping and detector sizes Rikard Sandström University of Geneva MICE collaboration meeting CERN.
Downstream transversal sizes Rikard Sandström University of Geneva MICE detector meeting.
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
May 5, 2005 AFC Module Meeting AFC Window Measurements Page 1 Window Measurement Summary Non-contact Vision machine measurements of good window complete.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
OLYMPUS Collaboration Meeting Luminosity Monitor Symmetric Möller/Bhabha Calorimeter David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting.
Monte-Carlo simulations and reconstruction for 12-degree ep-elastic Luminosity Monitor A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
HLab meeting 10/14/08 K. Shirotori. Contents SksMinus status –SKS magnet trouble –Magnetic field study.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
SksMinus status 05 HB meeting 2008/5/16 白鳥昂太郎. Contents  Helium target.
ハイパー核ガンマ線分光用 磁気スペクトロメータ -SksMinus- 東北大学 大学院理学研究科 白鳥昂太郎 ATAMI.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
SksMinus status SKS meeting 2008/1/18 白鳥昂太郎. SksMinus setup SksMinus  STOF : Time-of-flight  SAC & BAC: K - beam veto and  - ID (n=1.03)  SDC1~4 :
Setup for hypernuclear gamma-ray spectroscopy at J-PARC K.Shirotori Tohoku Univ. Japan for the Hyperball-J collaboration J-PARC E13 hypernuclear  -ray.
20to2T5m100cm Images Van Graves February 13, 2014.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
SksMinus status SKS meeting 2007/5/10 白鳥昂太郎. SksMinus setup SksMinus  STOF : Time-of-flight  SAC & BAC: K - beam veto and  - ID (n=1.03)  (SFV : K.
LCWS2004 Paris 1 Beam background study for GLC Tsukasa Aso, Toyama College of Maritime Technology and GLC Vertex Group H.Aihara, K.Tanabe, Tokyo Univ.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
11.2 Areas of Parallelograms and Triangles
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Calorimetry for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory Workshop on General Purpose High Resolution.
SHMS Spectrometer Update Hall C 2008 Users Meeting Paul Brindza January 18, 2008.
J-PARC でのハイパー核ガンマ線分光実験用 散乱粒子磁気スペクトロメータ検出器の準備 状況 東北大理, 岐阜大教 A, KEK B 白鳥昂太郎, 田村裕和, 鵜養美冬 A, 石元茂 B, 大谷友和, 小池武志, 佐藤美沙子, 千賀信幸, 細見健二, 馬越, 三輪浩司, 山本剛史, 他 Hyperball-J.
Master thesis 2006 Shirotori1 Hypernuclear gamma-ray spectroscopy at J-PARC K1.8 beam line 東北大学大学院理学研究科 原子核物理 白鳥昂太郎.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
Proton Driver – Target Station Interfaces Keith Gollwitzer Fermilab Wednesday May 28, 2014 MAP 2014 Spring Meeting.
MBA Magnets MultiBend Achromat Magnets 8/14/2015 Review By Mark Jaski.
J-PARC における 4  He の生成と構造の研究 東北大学 大学院理学研究科 白鳥昂太郎 for the Hyperball-J Collaboration.
Hypernuclear gamma-ray spectroscopy at J-PARC K1.8 Beam line Tohoku Univ. K.Shirotori 東北大学 大学院理学研究科 白鳥昂太郎.
SksMinus simulation program. Program reconstruction Modification of SksMinus Geant4 program  Included configuration file Reaction selection Simulated.
Rotated by ≈ 45 degrees Beam Diaphragm Many PMT’s Light condensor Mirror geometry:
Stopped K beam at J-PARC Designed by J.Doornbos 1)Optics design of a K0.8 branch 2)Performance 3)Pion contamination 4)Comments on K1.1 Nov. 4, 2005 Korea.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
The Status of Hyperball-J Akio Sasaki Dept. of Phys. Tohoku Univ. 23/9/2011.
SksMinus status 01 HB meeting 2008/4/1 白鳥昂太郎. Contents  Target : 4 He target  Aerogel Cherenkov counters : SAC  Hyperball-J efficiency.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
M. Sullivan International Review Committee November 12-13, 2007
IPBPM test results at the LINAC end
Final Focus Synchrotron Radiation
Duct casings for particulate filters DCA
The LHC collider in Geneva
Additional Upstream Coil Shielding
Kaon beam at K1.1BR KEK Jun Imazato.
SHMS Beam Line – Large SHMS/HMS Angles
Interaction Region Design Options e+e- Factories Workshop
Additional Upstream Coil Shielding
New particle ID detector for Crystal Ball at MAMI-C
SksMinus status 08 HB meeting 2008/7/10 白鳥昂太郎.
SHMS Master Layout-Rays
SksMinus status 14 HB meeting 2008/10/16 白鳥昂太郎.
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
SksMinus status 04 HB meeting 2008/5/09 白鳥昂太郎.
SHMS Downstream Beamline
GLD IR optimization and background study
SksMinus simulation program
NPS Status Feb 01, 2019 Paulo M & Steven L.
Measurement and Characterization of a 5T Solenoid Field
Background Simulations at Fermilab
Option 1: Reduced FF Quad Apertures
Sha Bai CEPC AP meeting Work summary Sha Bai CEPC AP meeting
Presentation transcript:

SksMinus status 03 HB meeting 2008/5/02 白鳥昂太郎

Contents Around target SDC2 position SDC1 position SP0 position Hyperball-J frame position 4He target Beam line elements

SDC2 position Interference of preamp card. ⇒SDC2 to 50 mm upstream Original SDC2 position (it means the design position in the Geant4 simulation) Interference of preamp card. ⇒SDC2 to 50 mm upstream But, we can avoid to it by changing preamp arrangement. New SDC2 position

Distance between SDC1 and SDC2 Original SDC2 position Interference of preamp card. ⇒SDC2 to 50 mm upstream The distance between SDC1 and SDC2 becomes 80 mm…. New SDC2 position

SDC1 position Original SDC1 position The distance between SDC1 and SDC2 is too small to install SP0. ⇒To change distance in which SP0 can be installed. ⇒Distance ~160 mm New SDC1 position

SP0 position (cross section) Interference (just 1 layer)

SP0 position (side view) Very tight space for installing SP0 !

HBJ position (side view) Not to insert SDC1 into Hyperball-J frame ⇒The position of HBJ frame becomes more upstream.

HBJ position (side view) To insert SDC1 into Hyperball-J frame ⇒To install SDC1 as shown in the picture

Information1 Target⇔SDC2 : 575→525 (-50 mm) SP0 space : 159 mm SDC1⇔SP0 (between surface) : 7 mm SDC2⇔SP0 (between surface) : 7 mm Target position : Original→Realistic : -90 mm Target position w/ HBJ frame: -130 mm ⇒less than -100 mm.

Acceptance by changing target position Center : 112 msr Down : 118 msr Up : 107 msr (up to 20 degree scattering angle) ⇒ ~0.5 % / 1 cm ○ : Target center × : Downstream 100 mm □ : Upstream 100 mm

Interference of SKS magnet refrigerator Need to change the SP0 magnetic shield

W/ Beam line elements (FF+600mm)

W/ Beam line elements (FF+0mm)

Information2 Target ⇔Q magnet : 1900 mm Q magnet⇔BDC3 : 400 mm (center) Q magnet⇔BDC4 : 800 mm (center) BDC4(surface)⇔Target : 1056 mm BDC4(surface)⇔HBJ (surface) : 621 mm BDC4(surface)⇔SDC1(surface) : 1272 mm

Summary The position of the target has to be changed to the upstream direction. Less than 100 mm Space between beam line and Hyperball-J frame is large enough. FF+600 mm is little larger than optimum space ?

Plan Frame design + Detector position arrangement SP0 design (by Otani) 4He target Arm design, full set size, etc. SDC2 repair and PreAmp position arrangement