Manufacturing’s Objectives

Slides:



Advertisements
Similar presentations
Capacity Management Planning the resource capacity that a firm will need to meet its demand.
Advertisements

Business Processes Sales Order Management Aggregate Planning Master Scheduling Production Activity Control Quality Control Distribution Mngt. © 2001 Victor.
Operations Management Dr. Ron Tibben-Lembke
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Aggregate Planning Operations Management - 5 th Edition Chapter.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
BA 320 Operations Management Chapter 9 Capacity and Aggregate Planning.
IES 371 Engineering Management Chapter 14: Aggregate Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
PRODUCTION AND OPERATIONS MANAGEMENT
Operations Management Dr. Ron Lembke
Aggregate Planning.
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
Manufacturing’s Objectives
Supply Chain Management (SCM) Aggregate Planning
© 2007 Pearson Education Sales and Operations Planning Chapter 14.
Rev. 03/09/05SJSU Bus David Bentley1 Chapter 12 – Aggregate Planning Planning levels (long, intermediate and short ranges and real time control);
Chapter 5 Aggregate Planning Operations Analysis Using MS Excel.
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
Perencanaan Kapasitas Produksi
Operations Planning Horizons
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Production Planning and Control Introduction
1 DSCI 3123 Forecasting & Aggregate Production Planning Strategic Role Of Forecasting Forecasting Methods Capacity Planning Aggregate Production Planning.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 Learning Objectives:  Understand the concepts and methods of aggregate.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
OPIM 204 – Aggregate Planning 1 Aggregate Planning OPIM 3104 Instructor: Jose Cruz.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Operations Management Aggregate Planning
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Introduction to Materials Management
Chapter 13 – Aggregate Planning
Aggregate Planning.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
Operations Fall 2015 Bruce Duggan Providence University College.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Lecture 3 Production Planning System Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
AGGREGATE PRODUCTION PLANNING. Business Planning Exercise  Business plan is strategic in nature and addresses the following questions: Should we meet.
1 Chapter 13 Production Planning Supplemental Slides.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
© The McGraw-Hill Companies, Inc., OUTPUT PLANNING PROCESS Aggregate Planning.
Production Planning.  What to produce  When to produce  How to produce.
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
OPERATIONS MANAGEMENT: Creating Value Along the Supply Chain,
Sales and Operations Planning
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Inventory Stock of items held to meet future demand
Aggregate Planning Chapter 13.
Chapter 14 Aggregate Planning.
Operations Management
13 Aggregate Planning.
Beni Asllani University of Tennessee at Chattanooga
Chapter 8 Aggregate Planning in the Supply Chain
Introduction to Materials Management
Sales and Operations Planning
Fundamentals of Production Planning and Control
Dr Sh Salleh bin Sh Ahmad
Chapter 13 – Aggregate Planning
Production and Operations Management
Capacity and Aggregate Planning
Aggregate Production Planning (APP)
Inventory Stock of items held to meet future demand
Master Production Scheduling (MPS)
Presentation transcript:

Manufacturing’s Objectives The goal of manufacturing is to produce The right goods Of the right quality In the right quantities At the right time At minimum cost OMGT6743

Four Basic Questions What are we going to make? What do we need to make it? What do we already have? What must we procure? OMGT6743

Priority The APICS Dictionary defines priority as: “the relative importance of jobs, i.e., the sequence in which jobs should be worked on.” - APICS Dictionary, 8th Edition Priority refers to what is needed, how much is needed, and when it is needed. OMGT6743

Capacity The APICS Dictionary defines capacity as: “the capability of a worker, machine, work center, plant or organization to produce output per time period.”- APICS Dictionary, 8th Edition OMGT6743

Hierarchical Planning Process Aggregate Production Plan Master Production Schedule (MPS) Material Requirements Plan (MRP) Production Activity Control (PAC) Resource Plan (RRP) Rough-Cut Capacity Plan (RCCP) Plan (CRP) Input/Output Control Operation Sequencing Priority Management Techniques Capacity Management Techniques OMGT6743

Manufacturing Planning and Control System (MPCS) Strategic Business Plan - A statement of the major goals and objectives the company expects to achieve over the next 2-10 years or more. - broad/general direction - low level of detail - long-range forecasts - responsibility of senior management - includes Marketing, Finance, & Production participation - usually reviewed every six months to a year OMGT6743

MPCS Aggregate Production Plan (APP) must Satisfy market demand within resources available Assist strategic business plan implementation Based upon families of products Fairly low level of detail Address a six to 18 month planning horizon Reviewed each month or quarter OMGT6743

MPCS Master Production Schedule - Plan for the production of individual end items (finished goods). breaks down aggregate production plan list the quantity of each end item to be made level of detail is higher than the aggregate production plan developed for individual end items three to 18 month planning horizon reviewed and changed weekly or monthly OMGT6743

MPCS Material Requirements Plan (MRP) - Plan for the production and purchase of the components used in making the items in the MPS Production control & purchasing use MRP to decide the purchase or manufacture of specific items Level of detail is high Determines when the components & parts are needed Planning horizon is at least as long as the combined purchase and manufacture lead times (3 to 18 months) Usually reviewed daily or weekly OMGT6743

MPCS Production Activity Control & Purchasing Represents the implementation & control phase Purchasing is responsible for establishing and controlling flow of raw materials into the factory PAC is responsible for planning & controlling flow of work through the factory Planning horizon is very short, a day to a month Level of detail is high Reviewed and revised daily OMGT6743

MPCS At each level in the MPCS, 3 questions must be answered: 1. What are the priorities - how much of what is to be produced & when? 2. What is the available capacity - what resources do we have? 3. How can differences between priorities & capacity be resolved? OMGT6743

Manufacturing Resource Planning (MRP II) Manufacturing resource planning (MRP II) is a method for the effective planning of all resources of a manufacturing company. Ideally, it addresses operational planning in units, financial planning in dollars, & has a simulation capability to answer “what if” questions. It is made up of a variety of functions, each linked together: business planning, sales and operations planning, production planning, master production scheduling, material requirements planning, capacity requirements planning, and the execution support systems for capacity & material. Output from these systems is integrated with financial reports such as the business plan, purchase commitment report, shipping budget, & inventory projections in dollars. - APICS Dictionary, 8th edition, 1995 OMGT6743

Creating the APP APP is . . . setting the overall level of manufacturing output . . . & other activities to best satisfy the current planned levels of sales . . . while meeting general business objectives of profitability, productivity . . . etc., as expressed in the overall business plan. - APICS Dictionary, 8th edition, 1995 OMGT6743

Creating the APP APP is concerned with Quantities of each product group in each period. Desired inventory levels. Resources of equipment, labor, & material needed Availability of needed resources Why are plans made for product groups? What should the product groups be based on? OMGT6743

Creating the APP APP characteristics Time horizon may be more or less than 12 months, depending on the manufacturing cycle Demand is seasonal for many products, but not for all (seasonal demand is the worst-case scenario) Plan is made for families or groups Management will have a variety of objectives What might be some management objectives? OMGT6743

Developing the APP Three Basic Strategies Chase (Demand Matching) Strategy: Produce the amounts that are demanded at any one time Production Leveling Strategy: Continuously produce an amount equal to the average demand Subcontracting: Meeting additional demand through subcontracting Hybrid Strategy: Combination of any of the above strategies OMGT6743

Chase APP Strategy Chase (demand matching) Strategy Units 1 2 3 4 5 6 7 8 9 10 11 12 Periods Chase (demand matching) Strategy - Produce the amounts demanded at any given time. - Inventory levels remain stable as production varies to meet demand. OMGT6743

Chase APP Strategy • Chase Strategy Disadvantages As production increases, workers must be hired and trained - increases cost. As production decreases, people are laid off and morale suffers - increases cost When production starts to increase again, the best workers may have other jobs and their skills will not be available Manufacturing must have enough plant capacity to produce at the highest capacity needed • What industries use a chase strategy? OMGT6743

Level APP Strategy • Production Leveling Strategy - Continuously produce an amount equal to the average demand - Maintain stable workforce Units 1 2 3 4 5 6 7 8 9 10 11 12 Periods OMGT6743

Level APP Strategy Production Leveling Strategy Avoids the disadvantages of demand matching However, inventory builds up What are some examples of industries that could use this strategy? OMGT6743

Subcontracting & APP • Subcontracting Strategy • Major Advantage Producing at the level of minimum demand & meeting additional demand through subcontracting • Major Advantage Excess capacity costs are avoided Since production is leveled, there are no costs associated with changing production levels • Major Disadvantages Purchasing cost may be greater than if made in-house Certain core skills or technologies may be lost OMGT6743

Hybrid APP Strategy - Combination of any of the 3 strategies • Hybrid Strategy - Combination of any of the 3 strategies - Combination of strategies that • minimizes the sum of all costs involved • provides required level of service • meets financial & marketing plan objectives OMGT6743

APP Using Pure Strategies Quarter Sales Forecast (lb) Spring 80,000 Summer 50,000 Fall 120,000 Winter 150,000 Hiring cost = $100 per worker Firing cost = $500 per worker Inventory carrying cost = $0.50 pound per quarter Production per employee = 1,000 pounds per quarter Beginning work force = 100 workers OMGT6743

Level Production Strategy Sales Production Quarter Forecast Plan Inventory Spring 80,000 100,000 20,000 Summer 50,000 100,000 70,000 Fall 120,000 100,000 50,000 Winter 150,000 100,000 0 400,000 140,000 Cost = 140,000 pounds x 0.50 per pound = $70,000 OMGT6743

Chase Demand Strategy Sales Production Workers Workers Workers Quarter Forecast Plan Needed Hired Fired Spring 80,000 80,000 80 - 20 Summer 50,000 50,000 50 - 30 Fall 120,000 120,000 120 70 - Winter 150,000 150,000 150 30 - 100 50 Cost = (100 workers hired x $100) + (50 workers fired x $500) = $10,000 + 25,000 = $35,000 OMGT6743

Strategies for Managing Demand Shift demand into other periods incentives, sales promotions, advertising campaigns Offer product or services with countercyclical demand patterns create demand for idle resources OMGT6743

Hierarchical Planning Process Items Product lines or families Individual products Components Manufacturing operations Resource level Plants Individual machines Critical work centers Production Planning Capacity Planning Resource Requirements Plan Rough-Cut Capacity Plan Capacity Input/Output Control Aggregate Production Plan Master Production Schedule Material Shop Floor All work centers OMGT6743