M. Modena, CLIC Stabilization Day # 10, 14 September 2010

Slides:



Advertisements
Similar presentations
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Integration study of dipole corrector (for the MB Quad of CLIC Module) A.Samoshkin, M. Modena (CTC, 06-Apr-2010) 1.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
CLIC Workshop 2009 Power Converters implications for CLIC machine protection 25/05/2015TE-EPC / S. Pittet1.
Hybrid QD0 Studies M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A.Aloev, E. Solodko, P.Thonet, A.Vorozhtsov “CLIC/ILC QD0” Meeting.
M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A. Aloev, E. Solodko, P. Thonet, A. Vorozhtsov “CLIC magnets developments” “CLIC Project.
April 12, 2006 J. Garcia Workshop on Test Facilities and measurement equipment needed for the LHC exploitation Resistive magnet measurements & coils, manufacture.
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
Options for Final Focusing Quadrupoles Michele Modena CERN TE-MSC Many thanks for the contributions of: J. Garcia Perez, H. Gerwig, C. Lopez, C. Petrone,
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
CLIC QD0 R&D Status 1 Michele Modena, CERN TE-MSC IWLC10, WG5, 21October 2010.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
Permanent Magnet Quadrupoles for the CLIC Drive Beam Jim Clarke, Norbert Collomb, Neil Marks, James Richmond, and Ben Shepherd STFC Daresbury Laboratory,
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
1962 First CMM DEA (Italy) Ahmed CHERIF CERN Metrology lab. CLIC TECHNICAL COMMITTEE – EDMS : EDMS :
July 5, 2007 C. HAUVILLER CLIC stabilization Beam line and final focus.
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
November : PACMAN Kick-off Meeting Introduction to Work Package 3: “Precision mechanics and stabilization” Michele Modena - CERN.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Dec 04 Beam Stability First considerations for beam stability at ALBA Marc Muñoz ALBA Team.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
SUM ESR ESR ESR ESR ESR ESR ESR ESR (TBC)
Proton Plan PMG 5/25/06 David Harding Booster Correctors Status and CR David Harding.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
EuCARD NCLinac 9.3 Linac and FF Stabilisation A.Jeremie.
PACMAN : technical objectives Hélène Mainaud Durand.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
CTC Work Packages ver 2.1 HS for CTC. CTC-001SC wigglers Cooling design, hor. or ver. Racetrack coil Nb3Sn or NbTi cable Prototypes construction Experimental.
Two-beam module layout
Ideas for a Tungsten HCal Prototype CALICE Collaboration Meeting, Lyon September 18, 2009 Christian Grefe CERN, Bonn University.
Chris Booth Sheffield 29th March 2006
PACMAN impact on future module design
Roadmap for triplet cryostats
Procurement, Measurement and Installation of 2 Octupoles for ATF
CSP 25th November 2010 Technical agreement number 3: overview
F. Audinet, C. Martel : Cern GS-SE-HE
Status report on MQYY (Q4)
WP1 Metrology & Alignment
Far Detector Activities Late 2017 – Early 2018
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
MicroMegas Mechanical Meeting --- Cern April 2014
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
ELENA Magnet Installation Planning
Status on CLIC Long Quadrupole Prototype for Stabilization Studies (M
QXF schedule and milestones
LCLS Undulator System Production Management
Flex studies status. Module flexes: 4 types; M4, M2, M1plane, M1mountain. constraint: components and bondings on the same side. Constraining for the wing.
Undulator Integration Test Status
SAME 15 existing quadrupoles (QFS, QDS, QFL)
Presentation transcript:

M. Modena, CLIC Stabilization Day # 10, 14 September 2010 Status of Procurement of MB Quadrupole Prototypes (M. Modena at CLIC Stabilization Day # 10, 14 September 2010) - COILS for first 2 MB Quad prototypes (one Type1 and one Type4) were (finally!) delivered at CERN at mid July. They were tested in August: Tests are OK. Later in August we received also the coils for the two EXTRA prototypes (now tested and also OK). - 1 Prototype steel QUADRANT was delivered in Spring 2010 and is now at LAPP for mechanical and stabilization studies M. Modena, CLIC Stabilization Day # 10, 14 September 2010

Status of Procurement of MB Quadrupole Prototypes The QUADRANTS for 2 MB Quads grinded “at the best possible precision” (contractually 10 and 20 μm) are travelling this week from Netherland to CERN . We analyzed with CERN Metrology first measurements done by the Contractor; the component EVIDENTLY don’t keep the contractual tolerances! As soon as at CERN, the quadrants will be deeply measured by Metrology Lab, a mandatory action for further Technical and Commercial decisions. M. Modena, CLIC Stabilization Day # 10, 14 September 2010

Status of Procurement of MB Quadrupole Prototypes M. Modena, CLIC Stabilization Day # 10, 14 September 2010

Status of Procurement of MB Quadrupole Prototypes - Prototype ASSEMBLY and FUNCTIONAL TESTS will be done at NORMA Lab in Prevessin, then, the magnet will be available for Stabilization Tests and Magnetic Measurements. - For Stabilization Tests site we are (with Kurt) looking at different solutions, mainly: at Magnetic Measurement Labs in I8 (ISR Tunnel, the best site if enough “quite”) at NORMA Lab in Prevessin (Bld. 867) RESUMING: We have now at CERN coils to make: 2 LONG Quadrupole prototypes ( for Type4 Module) 2 SHORT Quadrupole prototypes (for Type1 Module) Steel quadrants for 1 LONG and 1 SHORT Quad will arrive at CERN this week. They will be deeply measured even if we know that they will be NOT conform to required tolerances. This should have no impact for stabilization tests that is a priority activity. We will try to negotiate a better grinding for the 2nd LONG and SHORT prototypes quadrants procurement. We also need to temporary send back the LONG quadrant now at LAPP for the final grinding; when it will be a good moment for LAPP Colleagues?? The Test Site is under discussion: various options, ground motion measurements needed (and planned). M. Modena, CLIC Stabilization Day # 10, 14 September 2010