Daniel, Gianluca and Belen (for the Collimator team)

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Ion Commissioning: Thursday & Friday
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Monday 14th March Second fill with pilot + 3 nominal bunches
Saturday 30th June - Sunday: Rocky !
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Summary of Week 11: 14 – 21 March
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
LHC commissioning Week 38
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 36 plan Todo’s: And also: 12+b injection.
Week 35 – Technical Stop and Restart
Friday morning 10:30 Optics measurements and corrections.
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Wednesday 03/11 – The Plan Finish electron-cloud program:
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Summary Thursday h21: Stable beams fill #1303.
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Friday 25 bunch fill dumped just before (BLM in 5)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday Nov Stop proton operation. Switch back to ions
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Sat morning Until 12:40: Loss maps at injection
Summary for LPC (March 7th, Ralph Assmann)
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Plan for 1 m b* J. Uythoven & J. Wenninger
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Tuesday – Morning and Evening
LHC Morning Meeting - G. Arduini
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Daniel, Gianluca and Belen (for the Collimator team) Loss Maps We have analyzed the Beam Loss Maps with the ions settings and they look ok. Please find attached the plots for: in-collision: B1H, B1V, B2H, B2V (no off-momentum) after-squeeze (non-colliding): B1H, B1V, B2H, B2V, off-momentum Neg and Pos Efficiencies are between 1-3% as expected for ions, however it rises up to around 10% for the positive momentum losses, but the setup is still good. From the collimation side we give green light, we don't need new BLMs. Daniel, Gianluca and Belen  (for the Collimator team) 11-11-11 LHC status

Async dumps 6/11/11 @ 20:04: Asynch dump in collision. This one was already looked at by Brennan. There was very little beam left for this loss map, with the TCDQA losses about a factor 100 lower than for the asynch dump performed later that night. For this reason the TCT/TCDQ loss ratios could not be properly calculated. However, if the loss ratio would be above the unacceptable level (> 5e4), they would have been measured. No losses on triplets either. XPOC BLM module did not fail due to the little beam. However, this loss map is ok. 7/11/11 @ 02:03 Asynch dump after squeeze separated. Nice asynch dump with 1.3e10 p+ on the DC BCT. Loss ratio TCT/TCDQ 4.2e-5 for B1 and 2.3e-6 B2. No losses on triplet. XPOC BLM module failed on this dump, which is a good sign. Asynch dump ok. Asynch dumps remain to be done at flat top and at injection. Jan Uythoven 11-11-11 LHC status

ADT Need about 6h ideal date: Saturday afternoon. 1.) the main topics: single bunch injection (typical probe beam intensity for protons, for ions the intensity is small anyway) to set up the sample delay (in myb words: the overall timing of the ADT) injection of several bunches (6-12), at the same bucket position in LHC and / or at different positions shot by shot to measure / adjust the timing for the different n=bunches. injection of a 200ns bunch train to check the multi bunch performance 2.) if possible: at 3.5 TeV with separate beams excite the beams using the tune kicker and measure the damping time. This could be done after the first test-collisions with a few bunches (single bunch OK) on Sunday, just before dump; 1-2 hours 11-11-11 LHC status

Incoming Async dump & loss map (B2 to repeat) at injection Test ramp/async dump at flat top – 1 ramp Steering of TI8 (2 mm injection oscillations to correct) Collisions of 2b / beam - 1 fill - stable beams Transverse feedback set-up with ions Collisions of 170b / beam - 2 fills Collisions of 360b / beam The 200 ns bunch spacing will be used (for the first phase at least), with injection of up to 24 ion bunches per SPS transfer. 11-11-11 LHC status

On the list Additional BLMs L2 (Bernd Dehning) I propose to prepare the installation beginning of next week, with 4 new monitors monitors. We will pull an new optical fibre cable and install new electronics in this area. We need for the installation 4 hours, hoping that could be scheduled during some downtime of the LHC. 11-11-11 LHC status