Sat 26.05.12 06:24 Fill 2669 stable beams, average bunch intensity 1.5e11, peak lumi: ~6.5e33 cm-2s-1. 14:37 Beams dumped by operation due to cryo problem.

Slides:



Advertisements
Similar presentations
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
Advertisements

Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
Saturday 25/11/10 & Night 12:24 Dump fill #1523 after more than 8 hours in physics It takes some time to get back:  Parallel sequences: Fewer clicks to.
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
LHC Status Fri Morning 3-June
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Wednesday September 14th
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Summary of Week 16 G. Arduini, J. Wenninger
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Saturday – Morning 7:36 beams dumped
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Sunday
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Thursday Physics fill 1250 (with 13b) dumped at 10.30
LHC Morning Meeting - G. Arduini
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Mon Access for switching temperature probe DFB L7.
Thursday 26th July 13:21 Fill 2880 beam dumped
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
Thursday – Morning Energy matching at injection with H CODs
Cold compressor speed S45
Thursday 22 September 2011.
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Friday morning 08:00 Stable beams with 840b.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Tuesday In the morning test cycle with probe for Q’ measurement.
Fri :52 Stable beams fill #2536
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Monday 27th August & night
Wednesday 26 October 2011.
Wednesday 14:30 Fill 2011 dumped.
Wednesday morning / afternoon
Saturday 6th October 05:38 STABLE BEAMS # :06 OP dump
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Saturday 26 November 2011.
Thursday 10:00 Fill 1986 in stable beams.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Presentation transcript:

Sat 26.05.12 06:24 Fill 2669 stable beams, average bunch intensity 1.5e11, peak lumi: ~6.5e33 cm-2s-1. 14:37 Beams dumped by operation due to cryo problem. Refrigeration unit (QURC) down in point 8. Integrated lumi: 132 pb-1. 16:28 Access to US85 to reset the magnetic axle bearing of QURCB. 17:20 ALICE access (dipole and compensator had been ramped down before). 22:08 End of ALICE access. Pressure rise in the triplet zone 7.4L1.X (no pump in the segment and triplet warming up). Cryo recovery ongoing. 27-05-2012 LHC morning report

Saturday 27-05-2012 LHC morning report

Problems with Lumi Optimization Used Optimize_All based on DIP signals. OK for IR1. For IR5 we got hit again by the algorithm that ignores the optimum found: While the scan takes place there is a natural decay of the luminosity but once the scan is finished the algorithm moves to the newly found optimum and checks the validity of this optimum by checking that the luminosity there is higher than at the starting point. If the luminosity gain is very significant this is indeed the case and the algorithm stays at the optimum; if the luminosity gain is small enough and the natural decay is comparable or larger the legitimate optimum is rejected and the algorithm moves back to the starting point, thereby losing the small gain. The algorithm should be changed to remove that last check. 27-05-2012 LHC morning report

Cryo Problem 27-05-2012 LHC morning report

Planning Ahead Recovery from cryo fault Access point 6 for change of cryo PLC? Delivering luminosity… 27-05-2012 LHC morning report