CRYOMODULE FINAL ASSEMBLY

Slides:



Advertisements
Similar presentations
Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
Advertisements

AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
ESS cavities interfaces
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Mechanical Design of Main Linac Cryomodule (MLC) Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Tim O’Connell, Ralf.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Overview of the ESS Linac Cryogenic Distribution System
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain la Neuve 17-18/04/2013 Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain.
October 7, 2010 HINS Test Cryostat 2 K Conversion Status October 7, 2010.
650MHz-Cryomodule for CEPC
Teleconf ACS – FREIA 28th March 2017
Status of the M-ECCTD F. Peauger - P. Bosland
Mechanical and cryogenic configurations
CERN – Zanon discussions
Overview of Mechanical Design
LARP Vertical Test Facility
The 11T cryo-assembly: summary of design and integration aspects
2K Cold Box Mechanical Design
KEK injector cryomodule
Teleconference ACS – FREIA 20th February 2018
Summary of the checking items of the Module-C design
Pressure Piping Analysis
ESS elliptical cryomodule
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
CEPC-650MHz Cavity Cryomodule
PANDA The conceptual design of the control Dewar
CRYOMODULE FINAL ASSEMBLY
SNS PPU Cryomodule Thermal Shield
SNS PPU Cryomodule Vacuum Vessel
SNS PPU Cryomodule Space Frame
V. Veshcherevich Cornell University
UPPSALA UNIVERSITY_GERSEMI PROJECT
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Space Frame
SNS PPU Cryomodule Thermal Shield & MLI
SNS PPU CRYOMODULE FDR Magnetic Shields Gary Cheng June 10, 2019.
Burst Disc Experiences at CEA Test Stand
SC1R Cold Box PDR Assembly Sequence
SNS PPU Cryomodule Design Overview
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

CRYOMODULE FINAL ASSEMBLY SNS PPU CRYOMODULE FDR CRYOMODULE FINAL ASSEMBLY Jim Henry June 10, 2019

OUTLINE This discussion will address the final cryomodule assembly. The Spaceframe / Thermal Shield Assembly has been installed, aligned, and locked down. The End Cans have been final aligned and installed. Design requirements are the same as stated for similar components.

SUPPLY END – INITIAL CONFIGURATION

SUPPLY END FINAL ASSEMBLY STEP 1 PRIMARY JT VALVE FLANGE / COUPLER JT VALVE PRIMARY LHe SUPPLY BEAMLINE THERMAL INTERCEPT SHIELD SUPPLY HP He FROM H/X HP He TO H/X

SUPPLY END FINAL ASSEMBLY STEP 2 Thermal shield extension

SUPPLY END FINAL ASSEMBLY STEP 3 Outer MLI

SUPPLY END FINAL ASSEMBLY STEP 4 OUTER MAGNETIC SHIELD EXTENSION

SUPPLY END FINAL ASSEMBLY STEP 5 WARM / COLD BEAMPIPE

SUPPLY END FINAL ASSEMBLY STEP 5

RETURN END – INITIAL CONFIGURATION

RETURN END FINAL ASSEMBLY STEP 1 BEAMLINE FLANGE THERMAL INTERCEPT PRIMARY 2K RETURN SURGE TANK HP He FROM H/X HP He TO H/X SHIELD RETURN

RETURN END FINAL ASSEMBLY STEP 1

RETURN END FINAL ASSEMBLY STEP 2 THERMAL SHIELD EXTENSION

RETURN END FINAL ASSEMBLY STEP 3 OUTER MLI

RETURN END FINAL ASSEMBLY STEP 4 OUTER MAGNETIC SHIELD EXTENSION

RETURN END FINAL ASSEMBLY STEP 5

RETURN END FINAL ASSEMBLY STEP 5

EXTERIOR ASSEMBLY INSTRUMENTATION PORTS INSULATING VACUUM GAGES ASME BURST DISC INSULATING VACUUM VALVE COUPLER OUTER CONDUCTOR COOLING RETURN PARALLEL PLATE VACUUM RELIEF (X2)

SUMMARY Thermal Shield Extensions, Magnetic Shield Extensions, MLI, and Warm / Cold Beampipe drawings are in final checking. Piping detail drawings must be created. Top assembly drawings must be created.

Questions? CRYOMODULE FINAL ASSEMBLY THANK YOU FOR YOUR ATTENTION Jim Henry Questions? CRYOMODULE FINAL ASSEMBLY THANK YOU FOR YOUR ATTENTION