Wednesday :35 : Beam lost because of trip of RCBXH3.L1

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ion Commissioning: Thursday & Friday
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Summary of week 7 Hardware Commissioning:
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Thursday morning – optics correction
Monday 18 October : Collimation system
Summary of Week 11: 14 – 21 March
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday morning 09:30 Dump of pPb fill.
SPS Transverse Damper System
Limits on damping times
Saturday 2/4/ :00-09:00 Problems with SPS:
Wednesday 8th August & night
Friday March 4th 08h32: Access for beam dump system.
Saturday 4.12 Beam in the SPS at 09:30 Beam in the LHC at 10:00
Tuesday 20 March 2012.
Monday February 28th 8h00: Injection
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Chromaticity can make a difference…
Friday morning 10:30 Optics measurements and corrections.
Friday Morning 7:30 injection for fill 2908
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Wednesday 03/11 – The Plan Finish electron-cloud program:
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Machine Tolerances in Cleaning Insertions
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday Fill 1364 (24 bunch) dumped at 07h
Thursday – Morning Energy matching at injection with H CODs
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
07/08/2010 Fill #1264 dump at 02:14:38.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Friday 28 October 2011.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Thursday 2.12 Cryo recovery…. Access… RF cavity check (noise) Cav4B1.
31/3/2010 Difficult day… but at the end stable beams.
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Presentation transcript:

Wednesday 19.05 07:35 : Beam lost because of trip of RCBXH3.L1 access needed to fix problem 10:00 : End of access 13:20 : Beam injection RF studies for bunch lengthening in the SPS and capture in the LHC analysis of injection oscillations 15:41: Beam circulating with 1011 particles per bunch additional longitudinal blow up in the LHC by turning off phase loop 15:45: Preparing for ramp B1 emittances: h = 9.2 mm; v = 2.7 mm; B2 emittances: h = 3.8 mm; v = 7.0 mm large losses for Beam2 without adjusting machine  new injection & large un-captured beam during dump 8:30 meeting

Un-bunched beam during last fill 8:30 meeting

Wednesday 19.05 17:00 : Start ramp Both beams dumped at 1.1 TeV by orbit excursion. No FB in the ramp to avoid spurious trips. 19:00: Ramp down finished & ready for new injections: Studies with orbit feedback system Damper commissioning Measurement of Q’ drift due to decay 8:30 meeting

Beam length during ramp 8:30 meeting

Wednesday 19.05 22:30 : Test ramp with orbit FB and transverse damper on B2 V plane No problems on orbit. Increased no eigenvalues to 370 for better performance. Did not quite get the orbit that was expected at 3.5 TeV. Previous incorporation did not quite do what I expected… Re-corrected orbit at 3.5 TeV. RT trims transferred to ~80% into LSA. Incorporated once more… Wire scanner at the end of the ramp: B2H 1.79 B2V 1.48 ** damper on (at low gain) in the ramp B1H 1.75 B1V 1.60 Tune FB test with large modulation from fRF: no RQT trips. MPS test at the end: start ramp-down with beam. To be analyzed – somewhat strange event… 8:30 meeting

Orbit in the ramp RMS < 0.15 mm 8:30 meeting

RT orbit trims RT trims transferred to LSA settings 8:30 meeting

Tune FB without RQT trips 8:30 meeting

Damper summary Summary of damper setting-up (D. Valuch, W. Hofle) Measured phase advances between pick-ups for all dampers to prepare for use with two pickups: H.B1: left of 4 Q9 -> Q7 : 115 degrees delta with respect to 90 degrees: 25 H.B2: right of 4 Q9 -> Q7 : 107 degrees 17 V.B1: right of 4 Q7 -> Q9 : 56 degrees 34 V.B2: left of 4 Q7 -> Q9 :137 degrees 47 ! The values seem to be correct when compared to the latest optics version. For the vertical plane the situation is now marginal and needs to be checked in detail for the use with two pick-ups. Compared to version 6.500 there is a change for the vertical plane which is significant. We continued therefore with one pick-up on V.B2; Q7 pick-up V.B2 some noise observed which must be followed up by RF. We used Q9 exclusively. Switched on feedback with previous settings from last session. Works correctly. We used ~ 2 1/2 hours beam time. We decide jointly to leave FB on in the vertical plane with one module at - 6dB gain setting for ramp. During the ramp tune activity outside tune line, lifetime is changing often, but approaching high levels of > 100 hours at high energies. Emittance measurements show better preservation for the plane for the damper was used (V.B2): 22:31 before ramp 23:54 before dump at 3.5 TeV emittance increase HB1 1.0 -> 1.053 1.747 66 % VB1 1.0 -> 1.009 1.603 59 % HB2 1.3 -> 1.334 1.787 34 % VB2 1.3 -> 1.305 1.487 14 % -> here one damper module was on most of the time 8:30 meeting

Damper Damper OFF (red) and ON (green) at 3.5 TeV 8:30 meeting

Wednesday 19.05 02:00-06:00 : Studies at injection Re-check aperture in IR6 - MQY.4R6.B1 Off-momentum n1. Seems the aperture is 2/3 of the on momentum aperture – to be analyzed Off-momentum beta-beat. 8:30 meeting

Beta-beat stability 8:30 meeting

Off-momentum b-beat 8:30 meeting

Off-momentum beta-beat 8:30 meeting

Thursday 20.05 07:00 : Start 24 hours cryo intervention for filter cleaning access for: QPS: new card in S56 & hardware commissioning during evening BI: BPM LBDS: ADC cards and humidity filter Controls: reboot Windows consoles and LINUX servers & release of new software versions Program for weekend: Physics fills Potentially some damper studies in between physics fills 8:30 meeting