Measurement of the beam (transverse) emittances

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

BSRT Optics Design BI Days 24 th November 2011 Aurélie Rabiller BE-BI-PM.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
1 BeamBeam3D: Code Improvements and Applications Ji Qiang Center of Beam Physics Lawrence Berkeley National Laboratory SciDAC II, COMPASS collaboration.
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
Beam-Beam Simulations for RHIC and LHC J. Qiang, LBNL Mini-Workshop on Beam-Beam Compensation July 2-4, 2007, SLAC, Menlo Park, California.
LHC First LHC Emittance Measurements at 6.5 TeV IBIC15 Melbourne, Australia 2015 Maria Kuhn 1,2 – September 16, 2015 F. Antoniou 2, E. Bravin 2, B. Dehning.
SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
LHC LHC Emittance Measurements and Preservation LBOC Meeting July 28, 2015 Maria Kuhn – July 28, 2015 Many thanks to G. Baud, E. Bravin, B. Dehning, J.
BSRT CALIBRATION MD SUMMARY LSWG #6-15/09/2015 BSRT TEAM.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
Matching monitors for SPS and LHC E. Bravin 31 March 2011.
G. Trad on the behalf of the BSRT team LHC BI 2015 summary 13/11/2015.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
PROBLEM 1 Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
LHC LHC performance with low-emittance h=9 beam Focus on emittance preservation M. Kuhn, H. Bartosik, B. Dehning, A. Guerrero Ollacarizqueta, V. Kain,
LHC Emittance Preservation MD 3 - Preliminary Results M. Kuhn, V. Kain, G. Arduini, J. Emery, W. Hofle, A. G. Ollacarizqueta, F. Roncarolo,
Wire Scanners Observations In SPS & LHC G. TRAD Emittance working group 26/08/2015.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
LHC First LHC Emittance Measurements at 6.5 TeV Emittance Meeting August 26, 2015 Maria Kuhn – August 26, 2015 Many thanks to G. Baud, E. Bravin, B. Dehning,
Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
F Monitor of Beam in the Abort Gap Randy Thurman-Keup DOE Review of Tevatron Operations at FNAL March 29-31, 2005 a.k.a. Abort Gap Integrator (AGI)
MD377 Schottky diagnostic M. Wendt, M. Betz, T. Lefevre.
AB/BI J. Koopman New WS design - Brain storm session 18/06/2007 1/16 New WS design - Brain storm session.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
LHC LHC Wire Scanners: Updates on Measurement Accuracy Emittance Meeting 18 November 2015 Maria Kuhn – 18 November 2015 Many thanks to G. Baud, E. Bravin,
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
G. Trad on the behalf of the BSRT team Emittance meeting 04/11/2015.
Operating IP8 at high luminosity in the HL-LHC era
Measurements and analysis of beam parameters at post-IP wire-scanner
LHC Wire Scanner Calibration
Beam instrumentation MDs
Beam Gas Imaging Kick-off meeting 30-Oct-2012
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
MPI-ATL Calor Meeting 7-Sep-2009 H. Oberlack MPI für Physik, Munich
Space charge studies at the SPS
Wire, flat beams and beam-beam MDs in 2017
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Lebanese Teacher Programme 18/04/2017
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Lecture 2 Live Feed – CERN Control Centre
Tuesday Nov 16th Fill 1492 into physics around 07.30
LHC Emittance Measurements and Preservation
Beam Optics Set-Up at SLAC End Station A
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
High resolution profile measurements
Proton Beam Diagnostics
Lost at 12:05 to power converter (RTQX2.R1) problem
Limits on damping times
(on behalf of the LHC team)
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Linac Diagnostics Commissioning Experience
Monday :15 fill 3523 dumped by BPMs IP6
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Summary – what we discussed and learned (accelerator)
ATLAS full run-2 luminosity combination
LHC BIF test setup - update
Monday 152 bunch operation summary
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Measurement of the beam (transverse) emittances E. Bravin, G.Trad on behalf of BE-BI LHC Lumi Days 2019 4-5 June 2019 5 June 2019 Lumi days 2019

Synchrotron Radiation CONTENT Wire Scanners Synchrotron Radiation Monitors 5 June 2019 Lumi days 2019

Wire scanners 1 4 Scanners per beam, 2H and 2V WS is the reference instrument for emittance measurement Possible to measure bunch by bunch beam size at any energy Use limited by total intensity in the machine Wire damage (all energies) Magnet quench (high energy) 5 June 2019 Lumi days 2019

Wire scanners 2 Principle Error sources Scan a 30um diameter carbon wire trough the beam Measure the flux of secondary particles ~10m downstream as function of wire position (scintillator+PMT) Error sources Electronic noise on PMT signal + ADC Linearity of PMT and electronics Crosstalk between bunches (cables, BW) Indirect sampling of wire position (fork w.r.t. wire) Absolute scale of potentiometer Electronic noise on potentiometer signal 5 June 2019 Lumi days 2019

Example of WS profiles at 6.5 TeV 5 June 2019 Lumi days 2019

WS accuracy Compare operational and spare scanners Max difference 2.8% (B1V) Max spread 4% (B2H) Potentiometer of 1 WS crosschecked with interferometer, discrepancy <1% B2 “operational” WS wires found damaged in LS2 5 June 2019 Lumi days 2019

WS size evolution during cycle σbeam [μm] “Steps” behavior not yet understood 5 June 2019 Lumi days 2019

WS emittance evolution during cycle Changes of beta? 5 June 2019 Lumi days 2019

Synchrotron light telescope (BSRT) Complex source and optics Magnification and line spread function can only be determined by cross calibration with the WS LHC optics enters the cross calibration 5 June 2019 Lumi days 2019

BSRT calibration Assuming no dispersion at the WS and BSRT 5 June 2019 Lumi days 2019

L2 lens scan repeatability 4 lens scans Very close results Max difference between any two calibrations <5% above 1.5um [mm/px] [mm] L2 position [mm] 5 June 2019 Lumi days 2019

Calibration stability Ratio of Emittances from WS and BSRT 2 months after calibration 5 June 2019 Lumi days 2019

Calibration stability Emittance from WS and BSRT, 2 months old calibration, B1 damaged optics (UV) B2 H B1 H B2 V B1 V 5 June 2019 Lumi days 2019

BSRT accuracy LSF ~ beam sigma at flat top Deconvolution needed Resolution of few % (B by B differences) Absolute accuracy ? 10-20% Calibration, beta, coupling, etc. Very large error during the ramp: beta, LSF, mag. Not usable at the moment May be with a segmented ramp a calibration could be obtained 5 June 2019 Lumi days 2019

WS vs emittance scans vs emittance from absolute lumi 5 June 2019 Lumi days 2019

Conclusions WS provide the reference measurement for the transverse emittance Still some strange behavior to be understood BSRT works well for short time evolution and for B by B comparison Need to understand/improve long term stability and possibly differences between calibration fills and physics fills Emittance from luminosity not self consistent Need to understand discrepancy between emittance scans and WS 5 June 2019 Lumi days 2019