Philosophy of POC Transmission charge

Slides:



Advertisements
Similar presentations
Business Plan: Balancing the electrical grid load by remote control of electrical consumers Student: Gregor Androjna address student:
Advertisements

FSR Training course Florence, October 10-14, 2011 REGULATION OF ENERGY UTILITIES Module 12 Electricity tariff design Ignacio J. Pérez-Arriaga Instituto.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Sharing of ISTS Charges & Losses Regulation
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
EIUG – Wheeling Methodologies
Raine Cotton  Registered DG settlement is in accordance with Protocol Section as Real-Time Energy Imbalance at a Load.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
Organization of the electricity supply industry © 2012 D. Kirschen & University of Washington 0.
Effects of the Transmission Network on Electricity Markets © 2011 D. Kirschen and the University of Washington 1.
EE 369 POWER SYSTEM ANALYSIS
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Presented by: Fadhila MICHAEL C. NAUGHTON. Purpose  Develop and demonstrate a method for deriving and testing regulatory preferences within and across.
Econ Winter 2012: Professor Bushnell Principles for Transmission Cost Allocation James Bushnell University of California, Davis December,
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Module on Computation of PoC Transmission Charges
Book Reference : Pages To understand how electricity is distributed in the UK via the National Grid 2.To understand how transformers are used.
1 IEEE Trans. on Smart Grid, 3(1), pp , Optimal Power Allocation Under Communication Network Externalities --M.G. Kallitsis, G. Michailidis.
Frankfurt (Germany), 6-9 June 2011 Presenter: Mahdi Kiaee Supervisors: Dr. Andrew Cruden and Professor David Infield The University of Strathclyde, Glasgow.
For discussion purposes only Financial Transmission Rights: Design options Presentation to Electricity Commission 2 September 2009.
Sharing of Inter-State Transmission Charges and Losses (PoC Regime) Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
Transmission Planning Informational Workshop Montpelier, VT September 19, 2005 Allocating the Cost of New Transmission in New England Stephen J. Rourke.
The divergence of private and social costs is problematic because the divergence means that price no longer accurately reflects all of the costs of a commodity.
CAPTIVE POWER POLICY. Section 44 of the Electricity(Supply) Act, 1948 gave birth to Captive Generation.  Any other person to establish or to acquire.
Comments on CERC’s Staff Paper: Developing a Common Platform for Electricity Trading S. A. Khaparde, A. R. Abhyankar and V. Sarkar Indian Institute of.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Sharing of Inter-State Transmission Losses 11/29/
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
Commission For Energy Regulation Padraig Fleming Manager, Distribution & Retail 22 nd July 2004.
SPP Presentation Stakeholder Meeting April 16, 2008 Austin, Texas UPDATE: Retail Open Access for ETI within SPP.
BALTIC ELECTRICITY MARKET MINIFORA Riga 3 July 2006 Transmission and connection to the grids Dace Bite Public Utilities Commission.
Point of Connection Methodology for Sharing of Transmission Charges.
Announcements Homework 8 is 11.19, 11.21, 11.26, 11.27, due now
Sharing of Inter State Transmission Charges Eastern Regional Load Despatch Centre.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Overview of Market Reforms and the WESM
MOD0164 Bi-Directional Connection Point Overrun Charge Calculation Stuart Waudby (Centrica Storage Ltd.)
Root Cause Localization on Power Networks Zhen Chen, ECEE, Arizona State University Joint work with Kai Zhu and Lei Ying.
Point of connection Mechanism
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
Transmission Pricing Webinar 12 October Agenda for Webinar Introductions Purpose Potential Areas of Change – Overview –Revenue Proposal –Business.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
Calculating Marginal Utility. Marginal Utility Is the extra satisfaction generated from consuming one more unit of a good Is the extra satisfaction generated.
Smart Grid Tariff Changes
Using Technology for Electricity improvements
California Product Offerings
ECE 476 POWER SYSTEM ANALYSIS
HYBRID MICRO-GRID.
Operationalizing One Nation One Grid
ECE 476 Power System Analysis
Entry Capacity Overrun price calculation
ECE 476 POWER SYSTEM ANALYSIS
RESISTIVE CIRCUITS SINGLE LOOP CIRCUIT ANALYSIS.
ECEN 460 Power System Operation and Control
Sharing of Inter-State Transmission Losses
LMP calculations Congestion evaluation
31st USAEE/IAEE North American Conference
Rate-of-Return Regulation
City of Lebanon, Missouri Electric Department
ECE 333 Green Electric Energy
CMPLDWG Composite Model with Distributed Generation Approval
THE FIRM AND ITS CUSTOMERS: PART 1
Mod 621A Supporting analysis
ECE 576 Power System Dynamics and Stability
CMPLDWG Composite Model with Distributed Generation Approval
Unscheduled Flow Administrative Subcommittee ISAS Report
Entry Overrun Calculation
THE FIRM AND ITS CUSTOMERS
Presentation transcript:

Philosophy of POC Transmission charge Amitava Nag

How transmission charge depends on measure of utilization? Pricing basically depends on the method of measuring the utilization as under: 1.Average utilization of the transmission assets 2.Marginal utilization of the transmission assets

What is efficient pricing? Pricing of a commodity or service is considered as efficient when marginal cost of utilization of the underlying resources that are used is reflected.

How efficient pricing works for Transmission of Electricity? It tries to identify how much power that flows through each of the lines in the system is due to the existence of a certain network user and charge it according to the measure of utilization.

What are MP & AP methods? Utilization of the Transmission Network is generally determined in terms of either average or marginal utilization of the Transmission Assets. Depending upon the method of capturing the utilization, it is called MP (marginal participation) or AP (average participation) method.

What is the basic theory behind MP method? Kirchhoff’s current law is the basic theory behind Marginal Participation method

What is the basic behind AP method? “proportionate tracing method” proposed by Kirschen in 1996 is the basic behind Average Participation method.

What is done in MP method? It analyzes how the flows in the grid are modified when minor changes are introduced in the production or consumption of any agent. Total participation for each agent are calculated as a product of its net injection by its marginal participation. Cost of each line is allocated pro-rata to the agents according to total participation in the line.

Which are the countries follow MP method? UK, Norway, Brazil, Columbia use MP method with modification to their need.

What is Hybrid method? 1 MW injection or withdrawal in a bus is compensated by other buses called slack buses. These slack buses are selected by AP method by constructing physical paths for generator or demand node. Then burden of transmission charges or losses on each node is computed.

What is PoC? Recovery of the cost of line from an entity in proportion to the extend of usage. Aggregation of entity’s usage cost and division by MWs injected or consumed and time duration leads to Point of Connection tariff (PoC).

Why Hybrid method is accepted as suitable for India? The criticism of the MP method that the results are dependent on the choice of the slack bus is removed in hybrid method by selecting slack buses by AP method.

END