JLEIC SRF update SRF team 06-15-2017.

Slides:



Advertisements
Similar presentations
EMMA Cavity Update Emma Wooldridge 27/02/07. Requirements Initial Design Cavity Options & Optimisation Available Designs Future Work.
Advertisements

Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
Progress of SRF and ERL at Peking University Lu Xiangyang Institute of Heavy Ion Physics Peking University.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
ESS cavities interfaces
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
EuCARD is co-funded by the European Commission within the Framework Programme 7 under Grant Agreement no Reach of NC and SC Technologies, 50 …
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Dr G Burt (CI), Dr R. Rimmer (Jlab), H. Wang (Jlab) & B. Hall (CI)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
UK-Jlab-TechX Designs for the LHC Crab Cavity Dr G Burt Lancaster University / Cockcroft Institute.
Fabrication Update – The Frame Awakens Matt Hoff LBNL April 2,
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
Progress Report on the Ultra-fast Harmonic Kicker Cavity Design and Beam Dynamic Simulation Yulu Huang 1,2 H. Wang 1, R. A. Rimmer 1, S. Wang 1 1.Thomas.
650MHz Cavity, Helium Vessel, and Tuner Status at Fermilab Chuck Grimm IIFC POC 650MHz Cavities Fermilab (Avinash Puntambekar RRCAT)
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
650 MHz, Beta = 0.9, 11 April 2012Page 1650 MHz, Beta = 0.9, 11 April 2012Page 1 Project X Beta = 0.9, 650 MHz Cavity and Cryomodule Status Tom Peterson.
RISP SSR1 Design - `Balloon’ TRIUMF/PAVAC
O.I.Brovko, A.V.Eliseev, I.N.Meshkov, E.M.Syresin (JINR)
Long Term Plans at MAX IV
Hua Shi, Jinhui Chen, Lei Wang, Na Wang, Lihua Huo, Peng Liu, Yan Li
Overview of the RFCC Module and 201-MHz Cavity Design
Complementary ISTC Projects #3888, 3889p
Progress and Issues with VTS Upgrade
FCC R&D WP5 Cavity Fabrication Status May 2017 M
ELLIPTICAL SCRF CAVITIES
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
SPARC RF gun status by P. Musumeci Review committee
Double Quarter Wave Crab Cavity
Cavity + He Vessel interface
Junji Urakawa (KEK) for ATF International Collaboration
HIE-LINAC status report
CEPC 650MHz High Efficiency Klystron R&D
IHEP Cryomodule Status
Center for Injectors and Sources
Advanced Research Electron Accelerator Laboratory
JLEIC electron injection demo
JLEIC electron injection demo
CEBAF Pulsed Operation for JLEIC Electron Injection
Overview of RF Gun Specifications and Technical Issues
Update on ERL Cooler Design Studies
H. Wang1, R. A. Rimmer1, S. Wang1, J. Guo1
Status and plans for crab crossing studies at JLEIC
Update on Crab Cavity Simulations for JLEIC
JLEIC Main Parameters with Strong Electron Cooling
JLEIC CCR Path Length and Gap Formation
MEIC New Baseline: Part 7
Comments to the Report of the Community Review of EIC Accelerator R&D for the Office of Nuclear Physics, February 13, 2017 (60 pages) By Haipeng Wang,
Ya. Derbenev JLEIC R&D meeting CASA Jefferson Laboratory
Progress Update on the Electron Polarization Study in the JLEIC
Overview Slides for JLEIC Presenters
Presentation transcript:

JLEIC SRF update SRF team 06-15-2017

Outline Prototype Storage Ring/ERL Cavities Harmonic fast kicker Magnetic momentum measurement cavity

Cavity Fabrication Status Production of 952.6 MHz cavities proceeding well 4 cavities in fabrication: 1 Nb 1-cell cavity 2 Cu 1-cell cavities 1 Nb 5-cell cavity Deep-drawing dies ready (heavy/bulky – hard labor work on press to form half cells) Need to modify 650 MHz RF measurement fixture for 952.6 MHz endgroups/dumbbells  in progress

Cavity Fabrication Status Qty. Material Nb blanks for half cells for beam tubes Half cells deep-drawn Beam Tubes Flanges Endgroups 1-cell 1 Nb 2/2 – wire EDM completed wire EDM 2/2 - completed Completed/ machined (Nb flanges) 2/2 Welding completed Waiting for RF trim fixture 2 Cu 4/4 – wire EDM 4/4 - completed Rolled/ not machined yet SS CF flanges - to be ordered Not yet Started - 5-cell 10/10 – wire EDM 2/10 (new fixture in place to ease release of cells) In stock – not yet used started Single-cell Nb cavity endgroups ready, getting close to complete cavity

Harmonic fast kicker Baseline kicking scheme moving forward: Frequencies for kicker modes settled, six odd harmonics of 86.6MHz Needs to finalize other parameters such as kicking angle and aperture Vacuum model concept in progress Simplified one cavity 6 modes design Size similar to Yulu’s ½ model cavity, with 1 additional tuner (5+1) Asymmetric design: cavity needs to be optimized for minimal longitudinal R/Q Compatible for UITF/LERF tests Gun needs to operate at 136MHz reprate

Harmonic Kicker Frequencies and UITF/LERF Test 1497 𝑀𝐻𝑧× 7 22 =476.32𝑀𝐻𝑧 CEBAF/UITF/LERF RF PEP-II or JLEIC e-ring RF 2×476.32𝑀𝐻𝑧=952.64𝑀𝐻𝑧 JLEIC i-ring/ERL RF frequency 476.32𝑀𝐻𝑧 11 =43.3𝑀𝐻𝑧 Baseline JLEIC ERL gun laser reprate CCR turns 952.64𝑀𝐻𝑧 11 =86.6𝑀𝐻𝑧 harmonic kicker base RF 1497 𝑀𝐻𝑍 11 =136.1𝑀𝐻𝑧 photo cathode laser reprate in UITF/LERF test 136.1 𝑀𝐻𝑍 11 = 86.6 𝑀𝐻𝑍 7 =12.37 𝑀𝐻𝑧 kicked beam reprate in UITF/LERF test Odd harmonic frequencies of RF kicker: 86.6 MHz x1, x3, x5, x7, x9, x11 (or x0) =86.6MHz, 259.8MHz, 433.0 MHz, 606.2 MHz, 779.4 MHz, 952.6 MHz/DC CCR harmonic number can NOT be multiple of 11