International Tracking Testbeam Needs

Slides:



Advertisements
Similar presentations
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
Advertisements

May 14, 2015Pavel Řezníček, IPNP Charles University, Prague1 Tests of ATLAS strip detector modules: beam, source, G4 simulations.
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
Micromegas for CLAS12 Central Detector - Update Franck Sabatié November 19th 2009 Micromegas option for the Central Detector Why, Where, How ? R&D milestones.
Micromegas detectors for the CLAS12 central tracker Brahim Moreno (for the Saclay group) CLAS12 technical workshop 03/17/ 2010 Jefferson lab Update on.
Long Shaping-time Silicon Readout Bruce Schumm University of California, Santa Cruz Amsterdam ECFA-DESY Workshop April
Long Shaping-time Silicon Readout Bruce Schumm UC Santa Cruz Arlington Linear Collider Workshop January
Micromegas detectors for the CLAS12 central tracker Brahim Moreno (for the Saclay group) CLAS12 central detector meeting : 2 december 2009 Cea Saclay CERN.
Testbeams for Tracking Prototypes Two categories: TPC/Gaseous tracking – please chime in Solid-state (silicon  strip) tracking – will present some issues.
Thoughts on B-Field Uniformity for the SD Tracker SID Tracking Meeting October 22, 2004 Bruce Schumm UC Santa Cruz March 2001 Baseline Thanks to Harry.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LC Workshop January 6-10, 2004.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
Slide 1 sCVD Diamond for the CMS Pixel Detector May 2004 R.Stone, Rutgers J.Doroshenko, L.Perera, S.Schnetzer RD42 Collaboration Meeting Overview.
R&D Towards a Solid-State Central Tracker in NA World-Wide Review of LC Tracking January 8, 2004 Bruce Schumm SCIPP & UC Santa Cruz.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
Linear Collider TPC R&D in Canada Madhu Dixit Carleton University.
Planning for Electromagnetic Irradiation Studies of Silicon Strip Sensors at SLAC/SCIPP Viltaliy Fadeyev, Spencer Key *, Donish Khan *, Tom Markiewicz,
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Victoria Linear Collider Workshop July 28-31, 2004.
A new idea of the vertex detector for ILC Y. Sugimoto Nov
STS Simulations Anna Kotynia 15 th CBM Collaboration Meeting April , 2010, GSI 1.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
20 October, 2004GlueX Detector Review 1 The GlueX Detector Curtis A. Meyer This talk Next talk.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1 Pixel Telescope at CERN SPS Present at CERN: Tobias Haas Marcin Jastrzab Uli Koetz Livio Piemontese Philipp.
Study of FPCCD Vertex Detector 12 Jul. th ACFA WS Y. Sugimoto KEK.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Cornell LC Workshop July 13-16, 2003.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Yosuke Watanabe….. University of Tokyo, RIKEN A, KEK C, Development of a GEM tracker for E16 J-PARC 1 Thanks to ???????????
Impact parameter resolution study for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
Preliminary results with the Alibava Telescope G. Casse, S. Martì, J. Rodriguez, I. Tsurin and the Alibava collaboration 1 G. Casse,20th RD50 Workshop,
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting Rutherford Appleton Lab Tuesday 25 th April 2006 M. Ellis.
Tracking Group Summary Bruce `Lefty’ Schumm UC Santa Cruz Arlington Linear Collider Workshop January 9-11, 2003.
10-Minute Overview of North American Tracking R&D Amsterdam LC Tracking Review March 30, 2003 Bruce Schumm/UC Santa Cruz.
SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 28, 2005 Presenter: Bruce Schumm.
1 Update on Silicon Pixel Readout for a TPC at NIKHEF LCWS08 - Chicago 19 Nov 2008 Jan Timmermans NIKHEF.
Muon detection in NA60  Experiment setup and operation principle  Coping with background R.Shahoyan, IST (Lisbon)
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
Christian Lippmann (ALICE TRD), DPG-Tagung Köln Position Resolution, Electron Identification and Transition Radiation Spectra with Prototypes.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting U.C. Irvine Monday 21 st August 2006 M. Ellis & A. Bross.
P.F.Ermolov SVD-2 status and experimental program VHMP 16 April 2005 SVD-2 status and experimental program 1.SVD history 2.SVD-2 setup 3.Experiment characteristics.
CMOS Pixels Sensor Simulation Preliminary Results and Plans M. Battaglia UC Berkeley and LBNL Thanks to A. Raspereza, D. Contarato, F. Gaede, A. Besson,
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
Mitglied der Helmholtz-Gemeinschaft Hit Reconstruction for the Luminosity Monitor March 3 rd 2009 | T. Randriamalala, J. Ritman and T. Stockmanns.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Manoj B. Jadhav Supervisor Prof. Raghava Varma I.I.T. Bombay PANDA Collaboration Meeting, PARIS – September 11, 2012.
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
Simulation / reconstruction with GEMs at DAC A.Zinchenko, A.Kapishin, V.Vasendina for the collaboration VBLHEP, JINR, Dubna,
Tracking Group Testbeam Needs Bruce Schumm UC Santa Cruz SLAC Linear Collider Workshop January 7-10, 2004.
Thought on SCIPP’s Participation in SiLC Test Beam Activities
Status Report Fenfen An
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
Radiation Damage Studies for Solid State Sensors Subject to Mrad Doses
Panagiotis Kokkas Univ. of Ioannina
Detection of muons at 150 GeV/c with a CMS Preshower Prototype
Integration and alignment of ATLAS SCT
ILC Detector Activities in Korea
Radiation Damage Studies for Solid State Sensors Subject to MRaD Doses
A summary of world-wide test beam facilities
GEANT Simulations and Track Reconstruction
Pre-installation Tests of the LHCb Muon Chambers
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Beam Test Results for the CMS Forward Pixel Detector
Status of CCD Vertex Detector R&D for GLC
How can we study the magnetic distortion effect?
LC Calorimeter Testbeam Requirements
Presentation transcript:

International Tracking Testbeam Needs Bruce Schumm UC Santa Cruz Paris LCWS April 19-23, 3004

R&D Thrusts Primary activities: Si sensor development (Korea) Gaseous tracking (TPC) R&D, including readout, electronics, gas mixture, etc. (multi-regional) Long shaping-time silicon readout (US, Europe)

European/Asian Projections Korean Si tracking groups foresee ~3 months running in 2005; hope to make use of KEK, CERN, and FNAL facilities, although not much detail yet specified. Asian/European gaseous tracking R&D: roughly five groups seeking testbeam within next year In few GeV range; mostly hadrons, some electrons Envision using CERN, DESY, KEK facilities One group (Matsuda; KEK) requests magnetic field (strength?) European (SiLC) testbeam needs not yet thought through.

North-American Test Beam Projections Tracking groups were polled in Fall, 2002 Most groups responded at some level, some more concretely than others Nonetheless, some trends arose that gave a good picture of upcoming needs. Some tracking groups anticipated need for test beam facilities as early as January 2004, but now it’s clear that those needs won’t arise until 2005.

Beam Requirements Primary need is for several GeV/c p/m to limit multiple scattering and showering for resolution studies (5 out of 7 responding groups) Several groups also interested in momentum-analyzed non-relativistic hadrons for dE/dX and PID studies Rep-rate not that carefully thought out yet, but requests ranged between 1 kHz and 1 MHz

Running Periods and Duration All groups request ~2 week runs (1 wk setup, 1 wk actual running with various conditions Requests vary from once/year to 2-3 times/year, with intervals to be used for studying acquired data 2-3 weeks to allow 1wk setup, running at several settings, 1 per year to 2-3 per year Anticipation of need for first beams now a bit vague, but probably some in 2005 and most in 2006.

Facilities Requests One group (MIT) will use local beams (BATES e-) At this point, other groups cite proximity as only concern Requested services (roughly in order of demand): [Large-bore (25 cm) 5T magnet] see further discussion Fast trigger Spectrometer External trajectory definition (combine Si/TPC tests?) Particle identification Gas supply and servicing

High-Field Magnets DESY in possession of a 30cm bore x 60cm axis high- field (5T) magnet, but seems not possible to implement on beamline for high-field test beam. North American facility? Would be nice to explore possibilities (FNAL?) Or: How badly do we really need high-field test beams? See below…

Guesstimate Use Schedule (North-American Groups) For 3-year period 2004-6; corrected for under-reporting YEAR ANTICIPATED WEEKS OF RUNNING 2004 2005 16 2006 24

A word on high-field testbeam facilities At UCSC, we have looked into tilting Si sensors to simulate the Lorentz angle, which is the predominant effect associated with large magnetic fields. We have made use of a pulse-development simulation that we developed to optimize parameters and architecture of a long shaping-time readout ASIC.

Pulse Development Simulation Long Shaping-Time Limit: strip sees signal if and only if hole is col- lected onto strip (no electrostatic coupling to neighboring strips) Incorporates: Landau statistics (SSSimSide; Gerry Lynch LBNL), detector geometry and orientation, diffusion and space-charge, Lorentz angle, electronic response Efield is uniform; variables are bias voltage, strip pitch, detector thickness, magnetic field, track parameters

Faking the Magnetic Field Michael Young, UCSC Track Residuals B = 5 T; straight-through track B = 0; 180 mrad tilt (Lorentz angle for 5T)

Faking the Magnetic Field Michael Young, UCSC Track Residuals B = 0; 180 mrad tilt track with 200 mrad incidence B = 5 T; track with 200 mrad incidence

Faking the Magnetic Field Michael Young, UCSC Resolution Track Angle Different track angles for 5T field (B-Field) or 180 mrad tilt with no B-field (Tilted).

Faking the Magnetic Field Michael Young, UCSC Resolution Magnetic Field (T) Different B-Fields (B-field) or detector tilt to simulate Lorentz angle (Tilted)  Do we need high-field test beam facilities?

Summary International tracking group anticipates testbeam needs beginning in late 2004 Very rough guesstimate is 75-100 weeks of facilities time between now and beginning of 2006 Most-requested beam is few GeV hadrons or muons Need for high-field magnet on test-beam line is an open question. UCSC has addressed this for Si; what about others techonolgies?