Enabling Large Scale Utilisation of Class 3

Slides:



Advertisements
Similar presentations
Gas Consumer Forum Project Nexus xoserve update 27th July 2009
Advertisements

1 Project Smart Metering Portfolio Foundation Updates June 2013.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
COR3316: Implementation of UNC Modification 0451AV UK Link Committee – May 2014.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
IGT and Shipper Workgroup meeting 28 th February 2011.
DCA timeline and ROM Overview 12 October Smart Metering Indicative Timeline Evaluation Service (EVS) 2528 received / Rough Order of Magnitude.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
UNC Modification Proposal 0202 National Grid Distribution
xrn4361 UK Link Future Release 2
Performance Assurance Framework Risk Register Consultation Summary
UIG Task Force Progress Report
Amendment Invoice Task Force Progress Report
Incentives 26 September 2018.
XRN4770 – NDM Sample Data – Modification 0654 delivery – Amended file format ChMC – 9th January 2019.
DSC Change Committee Summary – 13th June
Change Management Committee – June 2019 Update
R&N Timeline Release 2 Release 3 Feb-19 June-19
Change Management Committee – June 2019 Update
Connected System Exit Points Administration Options
Project Nexus Workgroup
XRN 4695 Supporting Document High Level Plan
DSC Change Committee Summary – 11th July
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Connected System Exit Points Administration Options
DSC Change Committee Summary – 10th October
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
Release 2 Scope Business Benefit Review
Mod 124 Steve Nunnington.
Ofgem Switching Programme: Central Switching Service consequential change update 9th May 2018.
Project Nexus Workgroup
UIG Task Force Progress Report
DSC Change Committee Summary – 13th February ‘19
Amendment Invoice Task Force Progress Report
UIG Task Force Progress Report
PN UNC Workgroup (Settlement topic)
Ofgem Switching Programme: Central Switching Service consequential update 16th May 2018.
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
UIG Task Force Progress Report
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Overview of RbD Risk Modelling 31 March 2008
Dave Addison August 2008 Application Support Updates
UIG Task Force Progress Report
Meter Read Rejections ..
Meter Reads.
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
PN UNC Workgroup (AQ topic)
UIG Task Force Progress Report
Customer Issue Management CoMC Update
UIG Task Force Progress Report
High Level System Solution Impact Assessment
UIG Task Force Progress Report
Customer Issue Management CoMC Update for April & May 2019
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
UIG Task Force Progress Report
Customer Issue Management Dashboard CoMC - July 2019
Customer Issue Management Dashboard CoMC - July 2019
Enabling Large Scale Utilisation of Class 3
Xoserve Draft UIG Incentives Modifications 20 May 2019
XRN Enabling large scale utilisation of Class 3 – MOD0700
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

Enabling Large Scale Utilisation of Class 3 Proposed Urgent Modification

The Challenge Changes to UIG Weighting Factors for 19/20 gas year. Significant commercial benefit of a shipper holding a site in Class 3 compared to Class 4. Our latest customer insight suggests a vast movement of sites into Class 3 over the coming months. As we communicated at last months DSC Change Management and UNC MOD Panel committees, our system is suddenly presented with the real risk of not being able to handle such inbound meter read volumes without significant financial investment. We do not believe that investing significantly in our systems today is value for money for our customers. We have conducted a thorough mitigation options assessment and we believe to have identified a medium term solution option that we believe will benefit all industry participants. Time is not on our side. We feel we must act immediately as a collective group to safeguard our system estate. Our primary focus is that of maintaining a service provision as the CDSP. This urgent UNC modification is intended to define the necessary UNC changes to support the proposed mitigations.

Why is this Urgent? Prior to publication of the UIG Weighting Factors the CDSP had no indication of significant planned migrations to Class 3 from customers. The sudden and unpredictable move to Class 3 poses a capacity risk to industry systems as processing capacity could be consumed by the scale of Meter Readings that could be received. This modification proposes changes to UK Link systems that we believe will: Deliver the intent of the UIG Weighting Factors Retain benefits of Class 3 to Larger Supply Points where material benefit may be found Enable efficient utilisation of UK Link processing capability to mitigate the risk of failure

Class 3 Forecast – February 2019

Class 3 Forecast – July 2019

Potential Industry System Impacts IX File Transfers Class Change Movements Inbound Meter Read Volumes AQ Calculation Reconciliation Calculation Amendment Invoice Supporting Information Can the IX network and each Shipper’s terminal handle the projected traffic volumes Can the UK Link system process the desired class change volume without impacting switching Can the UK Link System process the peak daily Class 3 read load – over 120m reads against design spec of 32m More Class 3 sites could mean more AQ calculations every month. Currently ~9m a month. A Class 3 site creates 30x more variances than a Class 4 site… … which means 30x increase in AML records for that site. Potentially 120m+ new records each month.

Projected Class 3 Read Volumes

Projected Class 3 Read Volumes

Weighting Factors – Current Example House A and House B are on the same road. They have the Same AQ and both have Smart Meters. This example based on national Class 3 AQ as of June 2019 and assumes national annual average UIG of 3.18% AQ: 11,000 kWh EUC Band 01 Class 3 Class 4 Weight Factor: 46.41 Weight Factor: 94.64 UIG: 234 kWh (2.13%) UIG: 477 kWh (4.34%) UIG Cost at SAP: £4.18 UIG Cost at SAP: £8.53 A B All Energy and Financial values are simulated based on AQ and are annual figures, Average SAP used is 1.788p / kWh

Weighting Factors – October ‘19 Example House A and House B are on the same road. They have the Same AQ and both have Smart Meters. This simulation of 2019-20 factors based on Class 3 AQ as of June 2019 and assumes national annual average UIG of 3.18% AQ: 11,000 kWh EUC Band 01 Class 3 Class 4 Weight Factor: 24.23 Weight Factor: 161.68 UIG: 84 kWh (0.76%) UIG: 567 kWh (5.16%) UIG Cost at SAP: £1.50 UIG Cost at SAP: £10.15 A B All Energy and Financial values are simulated based on AQ and are annual figures, Average SAP used is 1.788p / kWh

Mitigation Components Overview Following the industry workshop on 12th July: Class 3 Batch Submission rule amendment Enforceable capacity management of Class change Loading of Meter Readings into Staging table EUCs 2-9 – ALL C3 Readings get passed to UKL processes EUC 1 – Only certain Readings get passed to UKL processes Staging table will be used to determine Meter Reading performance and NDM Demand Estimation Class 3 performance management mitigations shall be considered separately under 0664 Replacement Readings will be retained for Valid Readings