FIRE UPGRADES OF EXISTING BUILDINGS

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Australian Building Codes Board Disability (Access to Premises – Buildings) Standards 2010 Awareness Seminars.
PRIMARY AUTHORITY & FIRE SAFETY Operating as an ‘enforcing authority’ April 2014.
The New TNI Laboratory Accreditation Standards Requirements for an Accreditation Body.
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
Accreditation 1. Purpose of the Module - To create knowledge and understanding on accreditation system - To build capacity of National Governments/ focal.
Bankstown Family Relationship Centre (FRC) NIHAL DANIS Manager.
Fire Safety Jonathan Harrison Fire Protection Inspector West Yorkshire Fire & Rescue Authority.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
Regulation 16B As referenced in Approved Document B 2006.
MEA Class EA Requirements to support a new Sewage Treatment Facility May, 2013.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Planning an Audit The Audit Process consists of the following phases:
Administrative Penalty Program SB Regulatory Item California Air Resources Board Enforcement Division Public Hearing December 12, 2002 Sacramento,
ASSESSMENT TASK 5 PRESENTATION ON : THE LEGAL RESPONSIBILITIES. THE LEGAL RESPONSIBILITIES. THE LEVEL OF THE STAKEHOLDER. THE LEVEL OF THE STAKEHOLDER.
The New Building Standards System Completion certificates.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
Lecture 4. OUTCOMES What must the equity plan include?. What must affirmative action measures include? Which factors are taken into account in determining.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Water Legislation Impacts on First Nations March 10, 2010 Hilton Hotel & Suites, Niagara Falls, Ontario Ontario First Nations Technical Services Corporation.
ENVIRONMENTAL PERMITTING 1 Environmental Law. Environmental Permitting 2 Environmental Permitting (England and Wales) Regulations 2007 introduced a new.
TOURISM BILL “ THE CONTENTS ” Friday; 17 May 2013.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Building Industry Authority Determination 2003/3 Commentary Paul Clements.
Managing Fire Safety In Common Parts of Flats and Mixed Use Buildings Simon Gibbins Merseyside Fire and Rescue Service.
Building Act Post Moratorium Reforms Occupancy Certification System Department of Lands, Planning and the Environment May 2016.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
1 The WTO Agreement on Technical Barriers to Trade Basic Concepts and Member Obligations.
Health & Safety in Schools Ray Jones. Grad IOSH Senior Health & Safety Advisor. Corporate Heath & Safety Team. Bournemouth Borough Council.
MODULE 4: ICPSK GUIDELINES ON GOVERNANCE AUDIT GOVERNANCE AUDITOR ACCREDITATION COURSE.
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
AEMCPresentation to GWCFPAGE 1 AEMC and Rule changes Presentation to AEMO Gas Wholesale Consultative Forum Kamlesh Khelawan Director This presentation.
Chapter 6 Internal Control in a Financial Statement Audit McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Ontario Building and Fire Code Overview Presentation for the Downtown Revitalization Committee May 4, 2016 Jack Tosta, Chief Building Official Andrew McPherson,
Your name You and the Law Understanding Your Obligations Under the OHSA 1.
Mike Ellis Executive Director – Property + Projects
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
EIA approval process, Management plan and Monitoring
Successful Integration is a result of good governance – getting the wiring right Integrated care as an aspiration is simple, and simplest if one begins.
A key principle of the National Disability Insurance Scheme (NDIS), is that people with disability are empowered to exercise choice and control and access.
Auditing the Implementation of Multilateral Environmental Agreements (MEAs) (4) Narges Rezapour Tehran- May 2016.
PRESENTATION ON THE CHIETA CONFLICT OF INTEREST POLICY TO THE CHIETA REGIONAL STAKEHOLDER FORUMS IN OCTOBER 2017.
Understanding the Principles and Their Effect on the Audit
MODULE 2 INTRODUCTION TO GOVERNANCE AUDIT
Global Connections Day Building Safety Service Provider
Project Development and Managing your Build Agenda
Project Roles and Responsibilities
Setting Actuarial Standards
Alignment of Part 4B with ISAE 3000
A Managers Guide to Parental Leave
Canadian Navigable Waters Act
Nick Bonvoisin Secretary to the Convention on the
City Council Meeting August 27, 2018
Operationalizing Export Certification and Regionalization Programmes
Project Risk Analysis and Management: L3
OHSC 2018 CONSULTATIVE WORKSHOPS CERTIFICATION AND ENFORCEMENT
Urban Engineers ISO 9001:2015 General Overview
How to conduct Effective Stage-1 Audit
Portfolio, Programme and Project
OHSC 2018 CONSULTATIVE WORKSHOP - GAUTENG PROVINCE ENFORCEMENT
The assigned certifier conference 2019
LEGAL PRACTICE AMENDMENT BILL, 2017
Practical Policy Development in the Yukon Government
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
An overview of Internal Controls Structure & Mechanism
Restricted Building Work (RBW) Training For Trainers
Presentation transcript:

FIRE UPGRADES OF EXISTING BUILDINGS Voluntary and forced upgrades if existing buildings – interaction between regulatory authorities and the mechanisms of approval. Dean Morton – Technical Inner Sight Pty Ltd

Voluntary upgrades Building owner initiates upgrades due to: Duty of care to occupants Risk analysis on larger commercial buildings Risk reduction for potential loss of productivity post fire event Insurance implications Past occurrences of interactions with Council or other Authorities

Forced upgrades Initiated by Council or FRNSW Usually based from complaint passed onto the Authority (reactive) Fire safety order (section 121B of the EP&A Act, order #6) Where under an order can be prosecuted if not complied with Order terms can often be negotiated Not subject to a development consent or construction certificate Council may exercise discretion as to the extent of upgrade

Mechanisms of acceptance - Voluntary Can often be undertaken as complying development (CDC) Where it is a CDC no Council involvement (preferable?) CDC does not require FRNSW referral at the assessment stage (may require request for final inspection if affecting class 2 or 3 buildings where impacting “relevant fire safety system”) Must be prepared as a fire engineering report The CDC approves the physical building works only, eg a CDC can not be issued to adopt a FER that justifies levels of safety to a built form or use. Will most likely involve a BCA consultant and an accredited certifier (conflict of interest) and fire engineer. Need for consistency in approach between each. Not possible to heritage listed buildings Can approach Council for issue of an order

Forced upgrades – Order #6 Issued by Council – principally to relate to “To do or refrain from doing such things as are specified in the order so as to ensure or promote adequate fire safety or fire safety awareness” Can be used to adopt fire safety strategies, eg report based on probabilistic analysis where no physical works required Includes notice period where the terms of the order may be discussed Often notice issued with no works required and imposes to the recipient to provide a report identifying recommended upgrades Competency of the Council fire safety officers – variable Council has the ability to exercise discretion, order #6 does not refer to the BCA in any way. Issue of order does not need separate DA/CC/OC Orders issued with time period for compliance Enforced through the court, can result in further order #10 to vacate the premises

Working together? An integrated approach When undertaken as a CDC the certifier becomes the authority having jurisdiction Council involvement – difficulty with varying degree of staff experience across Council areas often slows process or creates higher levels of conservatism Convincing Council they are able to use discretion when utilising fire orders Fire orders remove planning controls and permit works to commence immediately (benefit to client and occupants) Often no holistic BCA assessment report, scope usually figured out on site and therefore needs fire engineer to be “hands on” When does FRNSW get involved? Council request based of type of building (level of risk) When impacting fire safety systems (hydrants) If complaint originated to FRNSW

Case study (ongoing) – hotel accommodation Three storey hotel (partial basement level). Class 6 ground floor, class 3 first floor. Type A construction Principal issue being extended travel distances to single non fire isolated exit up to 20m Heritage listed building Council commenced upgrade. No order issued, no direction given as to what needs to be upgraded Site inspection undertaken between client, BCA consultant, fire engineer to identify risks and opportunities to resolve Short form upgrade strategy prepared to get Council on board (limit costs to client until authority gave in principal support) Required multiple meetings with several officers before the short form strategy was agreed (verbally only)

Accommodation level:

Upgrade strategy

Challenges and benefits of approach Dealing with multiple Council officers. Needing to get to senior staff in decision making positions time consuming and required client intervention. Aligning the clients expectations to that of the consultant team Fire safety officer undertook the internal discussions with heritage section Benefits: Heritage building – enabled the works to be undertaken without needing a DA/CC. Gave flexibility as to when works could be undertaken Enabled to use of non compliant stair without needing to separately address that as a non compliance Suitable level of life safety being obtained Cost – fire order is free from Council

Case Study (ongoing) – apartment building Existing four storey apartment building Upgrade as a result of compliance audit initiated by the Body Corporate To be undertaken as complying development Compliance matters principally relate to exit configurations and fire hydrant design Scope of non compliances resolved between the BCA consultant and fire engineer prior to certifier involvement Conflict of interest provisions preclude the certifier directing the approach to be taken, role is to certify the proposed works only.

Challenges and benefits of approach Ensuring that roles of the parties are understood. Client believes certifier takes over BCA consultants role Works must fit within controls of complying development, may require alternate approaches that are not preferred Fire hydrant works require request for FRNSW inspection at completion Benefits: Single decision maker Certification process is more familiar to parties (BC like getting OC’s) Time – CDC can be issued in a day

Thank you Questions?