Optimized Production Technology (OPT)

Slides:



Advertisements
Similar presentations
THEORY OF CONSTRAINTS & DRUM – BUFFER - ROPE
Advertisements

Managing Processes and Capabilities CHAPTER THREE McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
How to Talk to Accounting about Lean* Dave Turbide, CFPIM, CMfgE, CIRM, CSCP * Version 3.
Operations Scheduling
Constraint Management
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Speaker Name: Robert Stawicki Speaker Title: Assistant Professor Ramapo College of NJ.
Short-term Capacity Optimization
Job Shop Optimization December 8, 2005 Dave Singletary Mark Ronski.
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management (Short-term Capacity Planning) 7.
Theory of Constraints Part II: TOC Concepts
Theory of Constraints. IF: Clients never changed their minds And Vendors always supply, whatever we ask for, on time, And We do not have any absenteeism.
Healthcare Operations Management © 2008 Health Administration Press. All rights reserved. 1.
1 Presentation by: Tim Sullivan CIRAS (Center for Industrial Research and Service) Iowa State University Extension.
Systems Thinking and the Theory of Constraints Any intelligent fool can make things bigger, more complex, and more violent. It takes a touch of genius.
The Goal The Goal by Eliyahu M. Goldratt and Jeff Cox, North River Press, Inc., Second Revised Edition (1992). 8/27/04 Paul A. Jensen Operations Research.
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 18 Synchronous Manufacturing and the Theory of Constraints
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management 7 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Throughput World. 2 Ardavan Asef-Vaziri Nov-2010Theory of Constraints: 2- Basics Systems Thinking and TOC  TOC Premise 1: The Goal of a business is to.
© The McGraw-Hill Companies, Inc., Synchronous Manufacturing and Theory of Constraints.
Chapter 5 – Capacity Planning and Control
8/27/04 Cut the Lot Size What can we do if the bottleneck has moved outside the plant?
Inventory System Inventory system: the set of policies and controls that monitor levels of inventory and determines: –what levels should be maintained.
Operations Scheduling. Scheduling in a Process-Focused Environment.
1 Slides used in class may be different from slides in student pack Chapter 18 Synchronous Manufacturing and the Theory of Constraints  Goldratt’s Rules.
Ricardo Ernst Top Management Program in Logistics & Supply Chain Management (TMPLSM) Production and Operations Management 6: Theory of Constraints.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Dependent Events and Statistical Fluctuations
Operations and Production Management
Introduction to Theory of Constraints
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
L EAN F LIGHT I NITIATIVE C ONFERENCE ©2012 M. Srinivasan 1 Focusing on Throughput Systems Thinking and the Theory of Constraints Mandyam (“Srini”) Srinivasan.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
TOC 1 Theory Of Constraints. TOC 2 Theory of Constraints How does TOC differ from the conventional shop control theory? Throughput definition * Emphasis.
Course: ETLS Managing for Improved Performance Professor: George G. Gleeson Student: Kou Song.
A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox
Systems Thinking and the Theory of Constraints Any intelligent fool can make things bigger, more complex, and more violent. It takes a touch of genius.
Mohamed Iqbal P Production and Inventory Control- Introduction (1) IEM Production and Inventory Control Introduction Mohamed Iqbal P.
Theory of constraints Slovak University of Technology Faculty of Material Science and Technology in Trnava.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Synchronous Manufacturing and Theory of Constraints
© The McGraw-Hill Companies, Inc., Chapter 17 Synchronous Manufacturing and the Theory of Constraints.
A Process of Ongoing Improvement Eliyahu M. Goldratt and Jeff Cox
1 Session 18 Implementation of TOC at Tosoh, SMD Laura Blum Production and Inventory Control Manager.
Theory Of Constraints
Performance Measurement Financial
Activity Scheduling and Control
DP Johnson, 2005 Dealing with Production Bottlenecks Mini-case Be Sure To Review Notes Area And Related Word Document Forward to Instructors.
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Production.
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
MEL751: Module on Theory of Constraints
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Strategic Capacity Management
MODULE 3 Manufacturing Methodologies
Synchronous Manufacturing and Theory of Constraints
Inventory System Inventory system: the set of policies and controls that monitor levels of inventory and determines: what levels should be maintained when.
Analytical Tools for Process Analysis and Improvement
Synchronous Manufacturing
Constraint Management
Chapter 2:Theory of Constraints & ERP
The Goal.
SE503 Advanced Project Management
Goldratt's Theory of Constraints (TOC)
L Maximizing Resources: Applying Lean Six Sigma Principles to Your Print Operation Monday March 18, AM – 12 PM.
Theory of Constraints Part II: TOC Concepts
Theory of Constraint.
Synchronous Manufacturing and Theory of Constraints
Presentation transcript:

Optimized Production Technology (OPT) Prepared by Clint Ward Brigham Young University This presentation discusses Optimized Production Technology along with its importance to a manufacturing organization.

Brainstorming Activity A Brief Overview OPT Defined Importance Operational Measures Goal of OPT Brainstorming Activity Nuts & Bolts Real World Example Rules of OPT Exercise

(Precursor to Theory of Constraints) OPT Defined Optimized Production Technology is a planning & production system focused on throughput maximization by alleviating bottlenecks (Precursor to Theory of Constraints) OPT was software developed and sold by Israeli physicist Eliyahu Goldratt. The Theory of Constraints states, “The key to maximizing throughput is to alleviate the bottleneck, keeping it operating at maximum capacity all the time.” Supply Chain Management: From Vision to Implementation (pg. 411)

Why is OPT important? “A chain is no stronger than its weakest link” An organization can only speed up the length of the entire process if the bottleneck is alleviated Bottleneck: where the performance of a system is constrained by capacity of a process. Often find WIP inventory piled up at this location. Actual cost of a bottleneck is the total expense of the system divided by the number of hours the bottleneck produces (The cost of adding an hour to the bottleneck is not simply the material cost of the inventory waiting, it’s much more). Source for picture: http://www.google.com/imgres?q=a+chain+is+no+stronger+than+its+weakest+link&hl=en&safe=active&client=safari&sa=X&tbo=d&rls=en&biw=1201&bih=709&tbm=isch&tbnid=0kQ4U7j7tyDkzM:&imgrefurl=http://blog.onlycollege.com.cn/722/viewspace-5771&docid=86OyKn9UYrtdZM&imgurl=http://blog.onlycollege.com.cn/attachments/2010/07/722_201007211300141T99E.thumb.jpg&w=300&h=250&ei=Xwq2UJGkNKSDyAHsq4HACw&zoom=1&iact=hc&dur=747&sig=105275214102322809524&page=3&tbnh=147&tbnw=176&start=58&ndsp=34&ved=1t:429,r:84,s:0,i:342&tx=143&ty=96&vpx=702&vpy=315&hovh=200&hovw=240

OPT Operational Measures Throughput = “the rate at which the system generates money through sales” Inventory = “all the money that the system has invested in purchasing things which it intends to sell” Operational Expense = “all the money the system spends to turn inventory into throughput” The goal of any organization is to make money. Popular measurements are net profit, return on investment, and cash flow. Ask how these measurements are evident at your facility. How do the processes contribute to these measurements? Ask if they can identify more applicable measurements. Reveal the three bullet points. Everything you manage in the plant is covered by these three measurements. “Inventory is the money in the system, operational expense is the money we have to pay out to make throughput happen. One measurement for the incoming money, one for the money still stuck inside, and one for the money going out.” The Goal by Goldratt

The Goal of OPT “Increase throughput while simultaneously reducing both inventory and operational expense” We are not looking for “local optimums.” High efficiency doesn’t mean we are making money. Increasing efficiency typically increases inventory. However, how much improvement do we have if our cost per part goes down, but our operational expenses increase? We need to look at improvements as it affects every process. Similar to what we would do in TCO analysis. Source for picture: http://www.google.com/imgres?q=reduce+inventory&num=10&um=1&hl=en&safe=active&client=safari&tbo=d&rls=en&biw=1201&bih=709&tbm=isch&tbnid=MC2DDSyYRpPYKM:&imgrefurl=http://leanmanufacturingtools.org/106/waste-of-inventory-causes-symptoms-examples-solutions/&docid=AL7ZT8YNyUTXuM&imgurl=http://leanmanufacturingtools.org/wp-content/uploads/2011/06/Inventory-Sea-reduced-level.gif&w=960&h=720&ei=Sgy2UPPLD_GEygHGn4D4AQ&zoom=1&iact=hc&vpx=402&vpy=151&dur=10239&hovh=194&hovw=259&tx=113&ty=75&sig=105275214102322809524&sqi=2&page=1&tbnh=138&tbnw=184&start=0&ndsp=24&ved=1t:429,r:2,s:0,i:89

Brainstorming Exercise Pull out a piece of paper Identify all of the area or processes on the floor Jot down bottlenecks Take 3-4 minutes; allow more time if needed to visit floor and find bottlenecks

OPT Nuts & Bolts Dependent Events: all processes count on the completion of sequential operations Statistical Fluctuations: process times fluctuate around an average Due to these facts, a plant’s capacity must be unbalanced and bottlenecks are inevitable Production should be contingent upon consumption by the bottleneck. A buffer should exist. Bottlenecks determine capacity of the plant. Statistical fluctuations cannot be determined precisely.

OPT Nuts & Bolts (cont.) First, Identify bottlenecks Second, Increase capacity of bottlenecks by minimizing machine idle time, avoid processing defective parts, avoid processing outside current demand Third, Shift work off of bottlenecks and give it to non-bottlenecks Bottlenecks have a huge pile of WIP sitting in front of it. Increasing capacity of bottlenecks (narrow gap to demand); idea is not to make the bottleneck a non-bottleneck. Example: Break time should be while the machine is running, not during set-up time. Idle time is ok in non-bottleneck areas. Put quality control in front of the bottleneck (otherwise lost time on a bottleneck means you have lost throughput). Look for other machines to take load of bottleneck or look to outside vendors (this will typically be cheaper than the lost sales). Explain diagram picture. Source from picture: http://www.google.com/imgres?q=Shift+load+from+bottleneck&hl=en&sa=X&tbo=d&biw=1201&bih=709&tbm=isch&tbnid=rDFQw2zn1nlHbM:&imgrefurl=http://www.firstedgesolutions.com/systematically-eliminating-manufacturing-bottlenecks/&docid=xEDOEI0V7G1qKM&imgurl=http://www.firstedgesolutions.com/wp-content/uploads/2012/09/bottlenecks.jpg&w=793&h=349&ei=i0K2UPb8FdDhigLzx4CIBQ&zoom=1&iact=hc&vpx=592&vpy=258&dur=9582&hovh=149&hovw=339&tx=135&ty=58&sig=105275214102322809524&page=2&tbnh=114&tbnw=260&start=20&ndsp=25&ved=1t:429,r:33,s:0,i:190

Obstacles Knowing what to change What to change to How to institute the change These three issues are essential to success in implementing OPT. However, these are the most difficult things to identify. You can visualize every process as having a switch. Through evaluation and renewed focus on bottlenecks, you can determine which switches need to be flipped. Granted change is not as easy as “flipping the switch.” This is why every employee needs to know which process is being changed and assist in brainstorming what the process should be changed to and how it should be changed. Source for picture: http://www.google.com/imgres?q=What+to+change&hl=en&client=safari&tbo=d&rls=en&biw=1201&bih=709&tbm=isch&tbnid=yqPbEYKja-P58M:&imgrefurl=http://tolerosolutions.com/do-i-really-want-to-work-here-whats-your-culture-telling-me/&docid=qTZLeoukwAeo7M&imgurl=http://tolerosolutions.com/wp-content/uploads/2012/09/change-same.jpg&w=462&h=500&ei=Z0O2UMDeHMGuigLuyICgCg&zoom=1&iact=hc&vpx=704&vpy=27&dur=22817&hovh=234&hovw=216&tx=135&ty=151&sig=105275214102322809524&page=1&tbnh=139&tbnw=121&start=0&ndsp=24&ved=1t:429,r:4,s:0,i:96

Real World Example: Dow Corning Corporation “Our plant’s on-time delivery was 50% and we were carrying over 100 days of inventory. We had six months to turn things around. Within my unit we identified the bottleneck and began to focus our resources there. By the time the six months were up, we had started to make significant changes using ‘The Goal’ as a reference. When I left the department cycle time had reduced 85%, operator headcounts reduced 35% through attrition, WIP were down 70%. On-time delivery was increased to 90%.” -The Goal by Eli Goldratt See “The Goal” by Eli Goldratt for a more detailed account.

Ten Rules of OPT Utilization and activation of a resource are not the same The level of utilization of a non-bottleneck is determined not by its own potential but by some other constraint in the system An hour lost at a bottleneck is an hour lost for the total system Effectiveness is more important than being active Non-bottleneck processes should support bottleneck processes.

Ten Rules of OPT 4. An hour saved at a non-bottleneck is just a mirage 5. Bottlenecks govern both the throughput and inventory in the system 6. The transfer batch may not and often should not be equal to the process batch 7. The process batch should be variable, not fixed 4. Saving time at a non-bottleneck is not what our focus should be. It doesn’t decrease the overall time of the system 7. Batch sizes should be adjusted for efficiency

Ten Rules of OPT 8. Capacity and priority should be considered simultaneously, not sequentially 9. Balance flow, not capacity 10. The sum of local optima is not equal to the global optimum

Break-out Exercise Pull out your brainstorm lists of bottlenecks Gather in groups of 3-4 Round-robin through everyone’s lists (3 min) Everyone pick 1 bottleneck (should have duplicates) and jot down ways to increase capacity Discuss effects of the changes

Summary Any process can be improved! Focus on the bottlenecks! Identify ways to increase bottleneck capacity! Never forget the goal: “Increase throughput while simultaneously reducing both inventory and operational expense” Gemba- Go out and see the process. Process improvements will not be thought of sitting around in an office. Go to where the work is done. Employees know the process better than anyone. Empower them to solve the bottleneck problems. Always consider throughput alongside inventory and operational expense.

Readings List Ellram, L., Fawcett, S., Ogden, J. (2007), Supply Chain Management, Pearson Education, Inc., Upper Saddle River, New Jersey. Goldratt, E., Cox, J. (2004), The Goal, North River Press, Great Barrington, MA. http://blog.jackvinson.com/archives/2010/12/20/the_rules_of_opt_-_precursor_to_theory_of_constraints.html http://bulatov.org.ua/teaching_courses/logistics_files/Logistics%20Lec2%20OPT.pdf http://en.wikipedia.org/wiki/Eliyahu_M._Goldratt http://www.angelfire.com/ca2/jlui/thegoal.html http://www.blackwellreference.com/subscriber/uid=1129/tocnode?id=g9780631233176_chunk_g978140511096919_ss7-1 http://www.tangram.co.uk/TI-Glazing-Manstrat_04.html