● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
Advertisements

Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
:30 meetingEBH 1  4:14 lost cryo conditions in Sector 34/45 due to communication problem  6:30 Faulty IT network switch identified  access.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
:00 meetingEBH 11 Saturday :00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
Ion Commissioning: Thursday & Friday
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday 24 March 2012.
Wednesday September 14th
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
Coordination: G. Arduini, E.B. Holzer, J. Jowett
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Progress Week 6 Coordination: G. Arduini, E.B. Holzer
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Summary of Week 11: 14 – 21 March
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC Morning Meeting - G. Arduini
Monday – recovery from MKI flashover
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Mike Lamont, Jorg Wenninger
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 36 plan Todo’s: And also: 12+b injection.
Wednesday 8th August & night
LHC Operations overview Week 28 – Getting back
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Monday Morning – recovery from cryo.
Tuesday Loss maps in the night:
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
LHC progress report Week
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Sunday
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Saturday 7th May Sat – Sun night
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Sat morning Until 12:40: Loss maps at injection
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Plan for 1 m b* J. Uythoven & J. Wenninger
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Tuesday In the morning test cycle with probe for Q’ measurement.
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
RAMP FOR COLLIMATOR SETUP
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Monday 10th December - morning
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Tuesday
Presentation transcript:

Tuesday 15.8. – Morning and Evening 8:00 – 9:20 Loss maps at 450 GeV injection protection out: betatron and +1000 Hz 9:50 – 15:40 Injection protection set-up Pt2 TDI/TCLI protection was set-up and validated OK Settings found are compatible with last years settings 14:25 CMS solenoid back at nominal current 16:17 Undulator RU.L4 tripped and the cryo was lost in ML4 17:00 cryo back; start pre-cycling and ramping up the undulator 18:00 – 18:30 no beam from PS (POPS power supply down) ALFA and TOTEM movement tested OK (in preparation for loss maps) 18:45 fill for TCT set-up in collision and loss maps 20:20 IP1, IP2 and IP5 collisions optimized 21:15 collimator alignment finished 21:22 IP8 collisions optimized (had to steer manually the separation plane by 220 um before getting a clear signal from the published lumi)

Tuesday Night 21:50 loss maps with TOTEM and ALFA roman pots in physics settings: B1V, B2V and off-momentum -500 Hz  dump 23:00 – 0:44 fill for loss maps in collision: B1H, B2H and +500 Hz Orbit corrected, Luminosities optimized Roman pots IN 1:30 – 3:00 fill for asynchronous dump test Orbit corected, Luminosities optimized 4:00 – 5:40 loss maps and asynchronous dump at injection with injection protection IN: H and V for both beams, +1000 Hz, -1000 Hz Till 6:00 loss map positive off momentum at injection with inj. protection out: -1000Hz 6:00 start angular alignment of TDI in IP8

Collimator set-up and Loss maps after ALICE polarity inversion Alignment Loss Maps- all done. To be confirmed OK by Collimation team Alignment Injection Flat-top Squeezed, separated Collision IP2 TCTVs + TCTHs done Injection, inj prot. IN Injection, inj prot. OUT Flat-top Squeezed, separated Collision, RP in physics settings Betatronic-H Done Betatronic-V Neg. off-mom +1000 Hz -- +500 Hz Pos. off-mom -1000 Hz -500 Hz Asynch dump

Orbit Joerg, Laurette: Orbit stability at the TCPs during the squeeze from Monday night, In the V plane the OFB has problems to follow and correct some leakage. The RT trims have been fed-forward (ramp and squeeze, IR2 CODs).  next squeeze (Tue evening) large 40um orbit excursions mostly gone. Another feed-forward performed.

TDI – IP8 from Jan Uythoven TDI IP8 LVDT position readings over the last 8 days investigated On Tuesday 7th August we spend about 1 hour with high intensity beams at injection to test the filling with opposite octupole polarity. During this time there was a large vacuum rise, as signaled by Vincent. This beam was dumped at injection as two pilots were supposed to be taken up the ramp. However, they were dumped on beam losses on the TDI when moved to parking (and probably one side got stuck)... This was the first time that the TDI problem encountered last week was signaled. During this one hour at injection a deformation of the structure, seen as ‘drifts’ on the LVDT readings, much stronger than normal is seen for the LVDT Right UP. Clearly due to the heating at injection with the TDIs at injection settings. For the TDI IP8 right DOWN basically no movement is seen during this period at injection. However, this LVDT shows a big jump in position when going for the first physics fill on early Sunday morning: this is when the recalibration of the TDI is done.

TDI – IP8 from Jan Uythoven cont. The positioning problem encountered with the TDI in point 8 is most likely due to a strong deformation at injection, just before. One should take great care to minimize the time with the TDIs at injection and large beam currents in the machine

TDI IP8 – for Roberto Losito, Mario Di Castro “On our side, thanks to the analysis of Mario Di Castro we  suspect a permanent deformation, due to the efforts developed during the strong skew angle, of the Right Downstream axis about 100 microns towards the beam. I think today’s realignment with beam is welcome to confirm this hypothesis. Not sure the deformation at the level of the jaw is really so strong, but at least we see a drift of the LVDT reading and therefore a modification of the reference position. The deformation is most probably in the mechanism outside (much weaker than the jaw itself).

Plan After TDI set-up and verification: Full cycle with low intensity (78 bunches) up to collision to verify quality of the orbit. Orbit in the squeeze might have to be optimized with additional test ramp If everything OK: Intensity ramp-up and stable beams (474 bunches/1374 bunches)