What Went Wrong? By: Meadow Burke. The following general lifting and handling suggestions are provided by Meadow Burke Products. You may reproduce copies.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

LEUCEMIA MIELOIDE AGUDA TIPO 0
HAND AND POWER TOOLS.
Slide 1 Insert your own content. Slide 2 Insert your own content.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 4 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Coordinate Plane Practice The following presentation provides practice in two skillsThe following presentation provides practice in two skills –Graphing.
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
Addition Facts
ALGEBRAIC EXPRESSIONS
ZMQS ZMQS
Working Around/Under Loads
Sectional Assembly and Installation
Photo Composition Study Guide Label each photo with the category that applies to that image.
Job-Specific Safety Training Room Attendant
1 The New Steel Erection Rule: Highlights. 2 Steel Erection Final Rule Published January 18, 2001 Implemented January 18, 2002 Includes exceptions for.
F&T Inc. OVERHEAD CRANE SAFETY.
ABC Technology Project
The Insulation Choice Made Easy High Performance Insulation.
O X Click on Number next to person for a question.
© S Haughton more than 3?
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
1 Recognize Any Hazard(s)?. 2 Yes No employer shall permit a worker to work in such proximity to any part of an electric power circuit that the worker.
1 Directed Depth First Search Adjacency Lists A: F G B: A H C: A D D: C F E: C D G F: E: G: : H: B: I: H: F A B C G D E H I.
Twenty Questions Subject: Twenty Questions
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Squares and Square Root WALK. Solve each problem REVIEW:
Energy & Green Urbanism Markku Lappalainen Aalto University.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Concrete Fooring & Roofing System
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Event 4: Mental Math 7th/8th grade Math Meet ‘11.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Doubles Facts Doubles with Pictures Doubles without Pictures Pictures Only.
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Week 1.
Concrete Modeling in Revit Structure
We will resume in: 25 Minutes.
Concrete Construction Part 1
1 Ke – Kitchen Elements Newport Ave. – Lot 13 Bethesda, MD.
1 Unit 1 Kinematics Chapter 1 Day
O X Click on Number next to person for a question.
Lesson 20 Any change that occurs requires energy
Crane and Hoist Training
Fall Protection in the Roofing Industry
Sling Load Capacity and Sling Angles
Outline of Crane Operator Training For BMRC Labournet.
Working Around/Under Loads
Presentation transcript:

What Went Wrong? By: Meadow Burke

The following general lifting and handling suggestions are provided by Meadow Burke Products. You may reproduce copies of this presentation in order to assist the contractor/installer with the safe handling of these products.

What Went Wrong???

Index 2.Introduction 3.What Went Wrong? 4.Index 5.Component – Flat Panel Rigging Alert. 6.Component – Flatwall panel – Rotation. 7.Component – Median Barrier 8.Component – Manhole – 3-point pick. 9.Component – Concrete Pipe. 10.Component – Box Culvert – Rotation & Lift. 11.Component – Insulated Panel A. 12.Component – Insulated Panel B. 13.Component – Utility Vault – Base and roof units. 14.Component – Precast Column A. 15.Component – Precast Column B. 16.Component – Double T Roof/Floor. 17.Component – Double T Wall Panel. 18.Component – Flat Roof/Floor Slab. 19.Special Note.

Flat Panel Riggging ALERT Note: When a rigging is selected where four (4) sling lines are attached to four (4) anchors or to a ring or hook on that line: When four fixed length slings are used, generally at least one sling (or chain) is slightly shorter than the other three. This will cause two anchors to carry the total load and the other two anchors (with the one longer sling) to do no more than keep the slab balanced.

Component: Flatwall Panel Rotation

Component: Median Barrier

Component: Manhole – 3 point pick

Component: Concrete Pipe

Component: Box Culvert (Rotation & Lift)

Component: Insulated Panel A

Component: Insulated Panel B

Component: Utility vault (Base & Roof Unit)

Component: Precast Column A

Component: Precast Column B

Component: Double Tee Wall Panel

Component: Flat Roof/Floor Slab

NOTE: The information supplied in this presentation represents the minimum recommendations for safe installation of precast products. It is the responsibility of the installer/contractor to evaluate the field conditions in order to prevent sources of additional load (ie. Adhesion of the precast product to mud or ice; jerking of the crane or loader during lifting; bouncing of the precast product AFTER it has been lifted; unbalanced loads prying forces on the cast and lift anchor; etc.). NEVER, under any circumstances, should you allow anyone to stand under or in close proximity to a lifted concrete product. Taglines and push sticks should always be used to guide lifted precast elements. It is the responsibility of the installer/contractor to inspect all lifting hardware and prevent the use of damaged product. Please refer to OSHA part 1910, 1920, and ANSI 10.9 for additional information.