“A World Leader In Plastics Technology”

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Terms. 1. Globalization 2. Financing 3. Inputs.
Chapter 1 The Study of Body Function Image PowerPoint
AUTOMOTIVE FASTENERS.
AUTOMOTIVE COOLING SYSTEMS
Chapter 3: Top-Down Design with Functions Problem Solving & Program Design in C Sixth Edition By Jeri R. Hanly & Elliot B. Koffman.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
D.T. unit 5C: Moving Toys How to make a moving toy.
Module Floor Systems.
Aerospace Fastener Applications
Woodwork Joints 2.
Sectional Assembly and Installation
World Health Organization
Presentation Overview
Scotch Marine Boiler Design
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
Interior Wall and Ceiling Finish
Questions: Component Separation
Module Reading Plans and Elevations
Job-Specific Safety Training Room Attendant
1 Room Planning Service Area.
Floor-Plan Dimensions and Notes
Randomized Algorithms Randomized Algorithms CS648 1.
Martin Grohman, LEED®AP Director of Sustainability, GAF Slide 1 Recycling Roofing.
Smart heat for comfort and safety 1 Self-regulating system to maintain water flow in gutters and downpipes.
1 Radiant 101 Low Temp Distribution for High Efficiency Applications Tom Meyer CSME, GGP, CBCP, QCxP, EBCP Director, Government and Professional Development.
All Weather Masonry Construction. 2 International Building Code 2006 Chapter 21: Masonry Section 2104 – Construction.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Vocabulary.
Construction Methods using Spray Foam
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
Filling and Wrapping Review Sheet
VOORBLAD.
Area Of Shapes. 8cm 2cm 5cm 3cm A1 A2 16m 12m 10m 12cm 7cm.
Surface Area of Irregular Shapes Volume of Irregular Shapes
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
Januar MDMDFSSMDMDFSSS
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Concrete Construction Part 1
ISO 9001:2008 Co. Manufacturers & Exporters of Hydraulic Tank Jacking Equipments, Power Packs & Vacuum Boxes.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
A SMALL TRUTH TO MAKE LIFE 100%
PSSA Preparation.
CON 4003 Construction Estimating Prof R. V. Locurcio.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Male haircuts - Parallel layers
Area Of Shapes. 8cm 2cm 5cm 3cm A1 A2 16m 12m 10m 12cm 7cm.
1. Warm Up: On the back of your lab sheet, answer the following questions. Agenda 2 3) Which of the following shapes are parallelograms? Explain how you.
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
Michael Norgan Radiant Sales Manager Michigan – Indiana - Ohio.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Basic Slide Show Under Tile Spooled Heating Installation Guide.
Installation Walkthrough Image Guide
Presentation transcript:

“A World Leader In Plastics Technology” Roth Industries Radiant Panel System “A World Leader In Plastics Technology”

Roth Radiant Panel System Features & Benefits: The system was developed for the wood frame houses of the North American and Scandinavian markets. Some of the advantages you will receive from the intelligent design and high quality of the Roth Radiant Panel System: Lower Water Temps. (60LF – 140LF) & Quick Heat Recovery The efficient design of the system, heavy gauge, full-face aluminum sheet on top and EPS insulating foam on the bottom, focuses the heat exactly where you want it – directly under the finished floor – so that the system can run at the lowest temperature possible. The quick recovery time makes this system one of the few times that temperature setback makes sense in radiant floor heating. Lower Cost on the Project : Easier and quicker to install= less labor = competitive cost It was designed for easy installation over any new or existing sub- floor, wood or concrete, and for use with many different floor coverings, such as carpet, tile or hardwood. It is ideal for retrofit systems, but it’s also great for new construction when you don’t want the weight, expense or water problems of lightweight concrete.

Roth Radiant Panel System The Roth Radiant Panel System is delivered in one box consisting of: Master Panels, 10 pcs., 24" x 48" Radius Panels, 3 pcs., 16" x 24" Each panel is perforated and can easily be snapped into 2 pieces (total of 6 pieces). Transition Panels, 3 pcs. 16" x 24" Each panel is perforated and can easily be snapped into 4 pieces (total of 12 pieces).

Roth Radiant Panel System Roth Panel System: Each box will cover 96 square feet 3/8” Panel Part #1171000.009 1/2” Panel Part #1171000.010 Roth Radius Panel 3/8” Panel Part #1171000.008 10Pcs. Radius Panels 1/2” Panel Part # 1171000.011

Roth Radiant Panel System Pipe Size and Elevations 3/8” PEX Piping Approximately 200 ft. loop lengths Panel has a ¾” elevation (thickness) 1/2” PEX Piping Approximately 250 ft. loop lengths Panel has a 1” elevation (thickness)

Steps To A Complete Roth Panel Design 1. Primary Assessment 2. Feasibility 3. Heatloss Floor Covering Panel & Tube Layout

PLANNING Before starting the installation, you need to plan your loop layout and manifold locations. We also recommend installing tubing in every track to achieve the best heat distribution. Try to plan the pattern so that the Master Panels are aligned to allow the loop supply to run along the outer wall. If installing a wood floor over the panel, align the panel so the loops are running in the opposite direction of the wood flooring material. In wet areas, such as bathrooms, etc., where a water-tight layer is requested, the membrane should be installed above the panel system. Always coordinate these installations with the flooring contractor.

INSTALLATION When securing the panels to a wood subfloor, we recommend using at least eight (8) countersunk screws spaced 12” (30 cm) apart and 6” (15 cm) from the edges.

INSTALLATION When installing over concrete, you can use countersunk concrete fasteners in the same pattern. Be aware that floor conditions may require use of additional fasteners.

INSTALLATION The panels can also be further secured to the sub floor with latex base adhesives compatible with foam board products. These are applied with either a caulking gun or notched trowel. Follow the manufacturer’s instructions for application. Curing time can vary widely between brands of adhesive and with the temperature and humidity conditions at the time of installation. Continue to lay the master panels. When cutting the master panels, mark the plate and saw it with EPS side up. You can use any saw with a fine-toothed metal blade. After cutting the panel, remove any burrs. When cutting the last master panel in the first row, use the rest of the panel to start the next row. This will provide staggered joints for the field panels.

TYPICAL LAYOUT Layout

PEX INSTALLATION Start the piping installation by connecting the PEX piping to the manifold. Install the pipe by unrolling the coil and stepping the pipe into the tracks in the panels. Use hard shoes or a wooden piece on top of the pipe in order to press the tubes in the tracks. Be sure to use a block when using a hammer or mallet to set the piping to avoid denting the aluminum surface. Follow the loop layout you have planned and connect the return pipe to the manifold. It is very important that the pipe is snapped down completely into the tracks. When installing the piping in the radius panels it is important to pull the piping tightly around the bends. This will allow a space for piping expansion during operation and greatly decrease the chance of noise during operation. When laying the piping into the transition pieces we recommend using a bead of silicone adhesive to secure the piping because the piping is loose in these pieces. We recommend installation of the panel and piping when ambient temperatures are above 40°F (4.5°C).

PRESSURE TEST START-UP After installation of the panel and tubing, but before laying the finished floor, you need to perform a pressure test. Fill the system with air or water and maintain a pressure of 2 to 3 times the working pressure of the system, about 25 to 50 psi (1.7 to 3.4 bar) for 6 hours. Use a leak detection solution (if testing with air) to locate and repair any leaks in the system. A small leak can take a long time to register on a 60 psi (4 bar) gauge. Please note: If the system cannot be started up after the pressure test and there is a danger of freeze, you must use air or a glycol solution! Do not use plain water! Run the system at normal operating pressure at about 140°F (60°C) for 30 minutes to allow the tubing to relax and settle into the tracks. Noise can occur at this time but will reduce as the tubing settles. If the noise persists, locate the source and apply some silicone adhesive to the tubing at that location. After the start-up is complete, the finished flooring can be installed.

Roth Radiant Panel System

Roth Radiant Panel System

Roth Radiant Panel System

Roth Radiant Panel System

Roth Radiant Panel System

Roth Radiant Panel System Screw locations for connecting Roth Panel System to Sub-floor. Screw location Screw locations for connecting Roth Panel System to Sub-floor. One should use an appropriate washer for the radius panel and transition panel. Each full master panel should have a minimum of 9 anchor points. Half panels should have a minimal of 6 anchor points. Transition panels and radius panels were appropriate. Screw type(s) should be based on sub-floor material.

Roth Radiant Panel System

A Clean Panel is a Happy Panel

Roth Radiant Panel System

A/C Register Placement

A/C Register Placement

Run Tubing Through Plate

Filler Plate ¾” Plywood

Double Plate walls

Dip under Floor

Roth Radiant Panel System

Roth Radiant Panel System