NoDay/DateTimeActivities 1Tue/27 Aug 201315.00 - FinishSharing and using Edmodo. 2Fri/30 Aug 201314.00- Finish Review of Screen O-matic & Alloc_vjoiner.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Chapter 13: Query Processing
Flexible Budgets and Standard Costs
Flexible Budgets, Variances, and Management Control: II
Chapter 7 System Models.
By Rick Clements Software Testing 101 By Rick Clements
AP Biology calendar & assignment sheet. dateAP Bio ASSIGNMENTSPTS.
Copyright © 2011 Verizon Foundation. All Rights Reserved. This document may be reproduced and distributed solely for uses that are both (a) educational.
Physical principles related to operation
BYU Rocket Team Special thanks to:
February 7, 2002 A brief review of Linear Algebra Linear Programming Models Handouts: Lecture Notes.
1 Uses for OnTheMap Economic Planning & Time Series - Where is the labor supply located? - Which industries are growing or declining over time? Transportation.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
1 Discreteness and the Welfare Cost of Labour Supply Tax Distortions Keshab Bhattarai University of Hull and John Whalley Universities of Warwick and Western.
TRONCO BUILDING SUPERSTRUCTURES IN HAITI
West Elementary School May 16, % Construction Documents.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc
Introduction to building Estimating in South Australia 1.
A number of very dangerous factors related to buildings, roofs, structures and properties have been identified and warned about.
ACC 3200 Chapter 3: Process Costing Process Costing.
Win Madigan - Western English Language School The World of Work and Study The importance of having a PLAN. and.
Managerial Accounting Second Edition Weygandt / Kieso / Kimmel
Job Order and Process Costing
An Economic Solution to Dry and Densify Ligno-Cellulosic Biomass The BioCompactor Technology The BioCompactor Company, LLC BioBriquet ® Herbaceous Feedstock.
28th Oct '05 1 SOUTH VIEW PRIMARY SCHOOL LMS Parents Workshop 2013.
Standards Certification Education & Training Publishing Conferences & Exhibits ISA Certified Automation Professional ® (CAP ® ) Rev. 10/2006.
Mavis Erica Elisa Ty 1.
1 Normalising digital literacies across the university Professor Neil Witt Head of Academic Support, Technology & Innovation.
1 Learning Through Innovation Dissemination Meeting.
Electric Bus Management System
Schuylkill Valley High School Graduation Project A Graduation Requirement - Class of 2014 Left Mouse Click To Progress Through the Presentation 1.
Economic Tasks Topic
INAR 342 FINISHING. INAR 342 : FINISHING Aim of the Course This course is designed to heighten the students understanding of the rules and principles.
PRELIMINARY TEST 2. Technicalities VID-ŽULJ, 21 Jan, (Tue) ŠTA-VAR 22 Jan (Wed) Studomat: if Test 1 & Test 2, apply for 29 Jan Signatures:
2012 Season Preview. Topics To Be Covered Dates Practice Schedule Team Goals.
Day of the week 9:00 – 10:00 10: :00 12: :00 13: :00 14: :00 15: :00 16:00 – 17:00 17: :00 18:00 – 19:00 19:00 – 20:00.
PowerVu Jim Smith – Chief Technology Officer. 1 About Digital Realty Trust (NYSE: DLR) We are the worlds largest wholesale datacenter provider In 27 markets.
All Weather Masonry Construction. 2 International Building Code 2006 Chapter 21: Masonry Section 2104 – Construction.
H igh E fficiency L ighting P rojects Let us HELP you! Left mouse click to proceed through slide show ENERGY SERVICES GROUP.
Capacity Management Planning the resource capacity that a firm will need to meet its demand.
Capacity and Constraint Management
Multiple dependency activity on node (AoN) networks ( lecture )
Project Management from Simple to Complex
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
Creating and Capturing Customer Value
1..
StudentsAchieve Admin Council April 27, Today’s Topics Review process – John 1. Academic Code Tables 2. PSD Rubric 3. Focus Area Weightings 4. Mark.
1 ENERGY Gr. 5 Science: Conservation of Energy & Resources BY Full Name Science Unit PowerPoint Outline by Miss Berndl 2009.
Chapter 11 Designing Effective Output
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Purple Market Research at INSIGHT 2006 November 2006 OLD MEETS NEW : using the Delphi Method to research the latest technology.
Equal or Not. Equal or Not
Welcome to Parent Orientation August 16, 2012 Ms. Garth, Ms. Steinheimer,and Ms. Daniella Kindergarten.
Week 1.
Design Review Planning to date Project scope summary
Fundamentals of Cost Analysis for Decision Making
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Calendario 2008 MON TUE WED THU FRI SAT SUN January.
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
Introduction to ikhlas ikhlas is an affordable and effective Online Accounting Solution that is currently available in Brunei.
Sunday, Dec. 14 (the day before the first day of final exams) TAs Courtney Staycoff and Josh Kressmer will be on duty in the open lab (room 203) to answer.
Educator Evaluation: A Protocol for Developing S.M.A.R.T. Goal Statements.
IPads in the Classroom Gayle Thieman, Melissa Lim and Dawn Guildner Roosevelt High School, Portland, OR.
Google Drive. How can YOU engage teachers in a workshop? Play Google Drive Jeopardy!
Presentation transcript:

NoDay/DateTimeActivities 1Tue/27 Aug FinishSharing and using Edmodo. 2Fri/30 Aug Finish Review of Screen O-matic & Alloc_vjoiner (join video) 3Mon/2 Sept FinishDevelop IISYs blog 4Wed/4 Sept FinishReview Edmodo and Video Editing 5Fri/ 6 Sept Finish Sharing on Sigil (Making Digital Book) and ISSUU part 2 6Mon/9 Sept FinishLearning Animation Blender 7Wed/11 Sept FinishMaking Digital Book Part 2 Schedule of Expert Teacher and Student 1. Giving Workshop to IISY teacher

NoDay/DateTimeActivities 1Tue/27 Aug FinishExplanation from Engineer 2Fri/30 Aug FinishPresentation for math project 3Mon/2 Sept FinishDoing the social project 4Wed/4 Sept Finish Doing the language project and explanation from Docor 5Fri/ 6 Sept FinishDoing The Science project 6Mon/9 Sept FinishPresentation for math project 7Wed/11 Sept FinishMaking contruction of warehouse Schedule of Expert Teacher and Student 2. Cover The Student Presentation and Practioners (Doctor and Engineer) Explanation

NoDay/DateTimeActivities 1 Mon/26 Aug FinishExpert student follow Phisic class 2 Thus/29 Aug Finish Expert teacher and student follow english class for teacher 3 Tues/3 Sept Finish Expert teacher and student follow english class for teacher 4 Thusr/5 Sept Finish Expert teacher and student follow english class for teacher 5 Mon/9 Sept Finish Taking pasrt football match Indonesia team VS IISY 6 Fri/13 Sept12-00 Expert student give digibook to students IISY Part 1 7 Mon/16 Sept12-00Expert student give digibook to students IISY Part 2 Schedule of Expert Teacher and Student 3. Taking part in the Classroom 4.On Saturday and Sunday Expert Teacher and Student go to Edutainment Place such as The Great Mosque in Yangon, Shwe Dagon, Floating Pagoda, The famous Boyokye Market, Nay Pyi Thaw Stadium etc

Tito Adi Dewanto (Expert Teacher) Prabu Diga Bawana (Expert Student) Mas Agry, Bu Dewi dan Mbak Best (Expert Seamolec Jakarta)

1. Getting the Message Across

In this case we just want to explain about the 4th project, A Planning a Simple Warehouse, since the 4th project is already finished (untill the last product) while others project is still on going. Project about advertisement of smoking, this week will be accomplished and will be sent via .

: Duration: 3 weeks Duration: 3 weeks Topic: Warehouse Topic: Warehouse Technology: ICT, online collaboration Outreach: Community based Outreach: Community based Partnership: One teacher, ICT teacher Partnership: One teacher, ICT teacher SCOPE OF PROJECT

Audience: Teachers, Engineering Professionals, Parents Engineering Professionals, Parents Integrated Subject : Math, Science (Phisic), Art and ICT

W arehouse is a commercial building for storage of goods.commercial buildinggoods Warehouses are used by manufacturers, importers, exporters, wholesalers, transportbusinesses, customs, school etcmanufacturersimportersexporters wholesalerstransportcustoms

Week 1 1. The Entry document The Driving Question 2. Form Groups Choose team leader Allocate responsibilities Begin research

Week 2 Research to material shop Making The Model Discuss form of warehouse model

Week 3 Finishing the model Full practice The Presentation Final Presentations

1. The Teacher Give Explanation About the process of the project 2. Invite the Enginer to explain how to build a warehouse Engineer from Yangon

Foto batubata

4. Divide the class into three group

5. Give assignment for the students to make a model of a warehouse, research report and Power Point Presentation

Group 2

Equipments For Warehouse 2 Floors Bricked Warehouse

ColumnMaterials or Labour NeededQuantit y Kyat per unit Total (Kyat) Column ( 0-9 x 0-9) Cement (bags) Sand (sud) Aggregate (sud) mm (ton) Binding wire (Ibs) Jungle wood (ton) ply wood (nos) Nails (Ibs) Mason (nos) Worker (nos) Carpenter (nos) Smith (nos) mm Total

BeamMaterials or Labour NeededQuantityKyat Per UnitTotal (Kyat) Beam (40-0) Beam (30-0) Cement (bags) Sand (sud) Aggregate (sud) mm diameter (ton) mm diameter (ton) Binding wire (Ibs) Jungle wood (ton) ply wood (nos) Nail (Ibs) Mason (nos) Worker Carpenter (nos) Smith (nos) Total

Wailin g Materials or Labour Needed QuantityKyat Per UnitTotal (Kyat) Brick (nos) Cement (bags) Sand (sud) X-met (Rft) Mason (nos) Worker (nos) Plaster Total Floorin g Materials or Labour Needed QuantityKyat Per UnitTotal (Kyat) Cement (Bags) Sand (sud) Aggregate (sud) Mason (nos) Worker (nos) Total

Ceilin g Materials or Labour Needed QuantityKyats Per UnitTotal (Kyats) 4x4 Asbesto (nos) x2 Pyingado (ton) x2 Pyingado (ton) Pyingado Beading (ton) Wood Screw (nos) Nail (Ibs) Carpenter (nos) Total684150

RoofingMaterials or Labour NeededQuantityKyat Per UnitTotal (kyat) 7 CGI Sheet Roofing (nos) Roofing Nail (Ibs) Color Plain Sheet Ridging (Rft) Gatter (Rft) x2 Rafter (ton) x2 Purlin (ton) Nail (Ibs) Carpenter (nos) Worker (nos) Total

Electric al Material or Labour Needed QuantityKyat Per UnitTotal (Kyat) 4 Florescent Single Lamp (nos) Florescent Twin Lamp (nos) Goung (nos) Goung (nos) Goung (nos) Goung (nos) A Socket (nos) A Socket (nos) Base Cup (nos) Way DB (nos) , 20A MCB (nos) P, 10A MCB (nos) P, 16A MCB (nos)12500

Materials or Labour NeededQuantityKyat Per UnitTotal (Kyat) 1.5mm2 wire (coil) mm2 wire (coil) mm2 wire (coil) trenking (nos) trenking (nos) Tape (Coil) Lighiting Electrician (nos) Socket Electrician (nos) DB Electrician (nos) mm2 Wire Electrician (nos) mm2 Wire Electrician (nos) mm2 Wire Electrician (nos) Total314440

TerminationFinal StageTotal sq.ftKyat Per sq.ftTotal (kyat) Door Windows Painting Aluminum Glass Partition Total The Whole HouseTotal (Kyat) Total Cost Maximum Estimate Cost

Wood Wood-Destroying Pests Durability Burning Moisture Wood Wood-Destroying Pests Durability Burning Moisture Brick A Pain to fix or fit Take time Weather Conditions High in weight Brick A Pain to fix or fit Take time Weather Conditions High in weight

Advantages of Wood Easier to renovate Insulates well Economically efficient Temperature and change Advantages of Wood Easier to renovate Insulates well Economically efficient Temperature and change Advantages of Brick Low Maintenance Energy efficiency Appearance Higher resale value Advantages of Brick Low Maintenance Energy efficiency Appearance Higher resale value

ItemsQuantityCost Per Each(ks)Total Cost Cement1015bags57005,785,500 Stone11bags50,000550,000 Sand28sads ,000 Brick29760nos1002,976,000 Timber Scanting1ton500,000 Timber Planks1ton500,000 Nails1631lbs20003,262,000 X-met2450rft40009,800,000 Aluzinc2525sft13503,408,750 Roofing nail34lbs135045,900 Emulsion621gals60003,726,000 Rafter2970rft12503,712,500 All Total Cost=34,490,650 The Material and The Price

18 ft 15ft 18 ft 15ft