NoDay/DateTimeActivities 1Tue/27 Aug FinishSharing and using Edmodo. 2Fri/30 Aug Finish Review of Screen O-matic & Alloc_vjoiner (join video) 3Mon/2 Sept FinishDevelop IISYs blog 4Wed/4 Sept FinishReview Edmodo and Video Editing 5Fri/ 6 Sept Finish Sharing on Sigil (Making Digital Book) and ISSUU part 2 6Mon/9 Sept FinishLearning Animation Blender 7Wed/11 Sept FinishMaking Digital Book Part 2 Schedule of Expert Teacher and Student 1. Giving Workshop to IISY teacher
NoDay/DateTimeActivities 1Tue/27 Aug FinishExplanation from Engineer 2Fri/30 Aug FinishPresentation for math project 3Mon/2 Sept FinishDoing the social project 4Wed/4 Sept Finish Doing the language project and explanation from Docor 5Fri/ 6 Sept FinishDoing The Science project 6Mon/9 Sept FinishPresentation for math project 7Wed/11 Sept FinishMaking contruction of warehouse Schedule of Expert Teacher and Student 2. Cover The Student Presentation and Practioners (Doctor and Engineer) Explanation
NoDay/DateTimeActivities 1 Mon/26 Aug FinishExpert student follow Phisic class 2 Thus/29 Aug Finish Expert teacher and student follow english class for teacher 3 Tues/3 Sept Finish Expert teacher and student follow english class for teacher 4 Thusr/5 Sept Finish Expert teacher and student follow english class for teacher 5 Mon/9 Sept Finish Taking pasrt football match Indonesia team VS IISY 6 Fri/13 Sept12-00 Expert student give digibook to students IISY Part 1 7 Mon/16 Sept12-00Expert student give digibook to students IISY Part 2 Schedule of Expert Teacher and Student 3. Taking part in the Classroom 4.On Saturday and Sunday Expert Teacher and Student go to Edutainment Place such as The Great Mosque in Yangon, Shwe Dagon, Floating Pagoda, The famous Boyokye Market, Nay Pyi Thaw Stadium etc
Tito Adi Dewanto (Expert Teacher) Prabu Diga Bawana (Expert Student) Mas Agry, Bu Dewi dan Mbak Best (Expert Seamolec Jakarta)
1. Getting the Message Across
In this case we just want to explain about the 4th project, A Planning a Simple Warehouse, since the 4th project is already finished (untill the last product) while others project is still on going. Project about advertisement of smoking, this week will be accomplished and will be sent via .
: Duration: 3 weeks Duration: 3 weeks Topic: Warehouse Topic: Warehouse Technology: ICT, online collaboration Outreach: Community based Outreach: Community based Partnership: One teacher, ICT teacher Partnership: One teacher, ICT teacher SCOPE OF PROJECT
Audience: Teachers, Engineering Professionals, Parents Engineering Professionals, Parents Integrated Subject : Math, Science (Phisic), Art and ICT
W arehouse is a commercial building for storage of goods.commercial buildinggoods Warehouses are used by manufacturers, importers, exporters, wholesalers, transportbusinesses, customs, school etcmanufacturersimportersexporters wholesalerstransportcustoms
Week 1 1. The Entry document The Driving Question 2. Form Groups Choose team leader Allocate responsibilities Begin research
Week 2 Research to material shop Making The Model Discuss form of warehouse model
Week 3 Finishing the model Full practice The Presentation Final Presentations
1. The Teacher Give Explanation About the process of the project 2. Invite the Enginer to explain how to build a warehouse Engineer from Yangon
Foto batubata
4. Divide the class into three group
5. Give assignment for the students to make a model of a warehouse, research report and Power Point Presentation
Group 2
Equipments For Warehouse 2 Floors Bricked Warehouse
ColumnMaterials or Labour NeededQuantit y Kyat per unit Total (Kyat) Column ( 0-9 x 0-9) Cement (bags) Sand (sud) Aggregate (sud) mm (ton) Binding wire (Ibs) Jungle wood (ton) ply wood (nos) Nails (Ibs) Mason (nos) Worker (nos) Carpenter (nos) Smith (nos) mm Total
BeamMaterials or Labour NeededQuantityKyat Per UnitTotal (Kyat) Beam (40-0) Beam (30-0) Cement (bags) Sand (sud) Aggregate (sud) mm diameter (ton) mm diameter (ton) Binding wire (Ibs) Jungle wood (ton) ply wood (nos) Nail (Ibs) Mason (nos) Worker Carpenter (nos) Smith (nos) Total
Wailin g Materials or Labour Needed QuantityKyat Per UnitTotal (Kyat) Brick (nos) Cement (bags) Sand (sud) X-met (Rft) Mason (nos) Worker (nos) Plaster Total Floorin g Materials or Labour Needed QuantityKyat Per UnitTotal (Kyat) Cement (Bags) Sand (sud) Aggregate (sud) Mason (nos) Worker (nos) Total
Ceilin g Materials or Labour Needed QuantityKyats Per UnitTotal (Kyats) 4x4 Asbesto (nos) x2 Pyingado (ton) x2 Pyingado (ton) Pyingado Beading (ton) Wood Screw (nos) Nail (Ibs) Carpenter (nos) Total684150
RoofingMaterials or Labour NeededQuantityKyat Per UnitTotal (kyat) 7 CGI Sheet Roofing (nos) Roofing Nail (Ibs) Color Plain Sheet Ridging (Rft) Gatter (Rft) x2 Rafter (ton) x2 Purlin (ton) Nail (Ibs) Carpenter (nos) Worker (nos) Total
Electric al Material or Labour Needed QuantityKyat Per UnitTotal (Kyat) 4 Florescent Single Lamp (nos) Florescent Twin Lamp (nos) Goung (nos) Goung (nos) Goung (nos) Goung (nos) A Socket (nos) A Socket (nos) Base Cup (nos) Way DB (nos) , 20A MCB (nos) P, 10A MCB (nos) P, 16A MCB (nos)12500
Materials or Labour NeededQuantityKyat Per UnitTotal (Kyat) 1.5mm2 wire (coil) mm2 wire (coil) mm2 wire (coil) trenking (nos) trenking (nos) Tape (Coil) Lighiting Electrician (nos) Socket Electrician (nos) DB Electrician (nos) mm2 Wire Electrician (nos) mm2 Wire Electrician (nos) mm2 Wire Electrician (nos) Total314440
TerminationFinal StageTotal sq.ftKyat Per sq.ftTotal (kyat) Door Windows Painting Aluminum Glass Partition Total The Whole HouseTotal (Kyat) Total Cost Maximum Estimate Cost
Wood Wood-Destroying Pests Durability Burning Moisture Wood Wood-Destroying Pests Durability Burning Moisture Brick A Pain to fix or fit Take time Weather Conditions High in weight Brick A Pain to fix or fit Take time Weather Conditions High in weight
Advantages of Wood Easier to renovate Insulates well Economically efficient Temperature and change Advantages of Wood Easier to renovate Insulates well Economically efficient Temperature and change Advantages of Brick Low Maintenance Energy efficiency Appearance Higher resale value Advantages of Brick Low Maintenance Energy efficiency Appearance Higher resale value
ItemsQuantityCost Per Each(ks)Total Cost Cement1015bags57005,785,500 Stone11bags50,000550,000 Sand28sads ,000 Brick29760nos1002,976,000 Timber Scanting1ton500,000 Timber Planks1ton500,000 Nails1631lbs20003,262,000 X-met2450rft40009,800,000 Aluzinc2525sft13503,408,750 Roofing nail34lbs135045,900 Emulsion621gals60003,726,000 Rafter2970rft12503,712,500 All Total Cost=34,490,650 The Material and The Price
18 ft 15ft 18 ft 15ft