Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.

Slides:



Advertisements
Similar presentations
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Advertisements

● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
:00 meetingEBH 11 Saturday :00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
Fabio Follin Delphine Jacquet For the LHC operation team
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Saturday 24 March 2012.
Wednesday 21 March 2012.
Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
Monday 11/07: Recovery Plenty of accesses.
Saturday 30th June - Sunday: Rocky !
Tuesday TOTEM and transverse loss map (1) OK
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC Injection and Dump Protection
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Wednesday 8th August & night
Friday March 4th 08h32: Access for beam dump system.
LHC Operations overview Week 28 – Getting back
Tuesday 20 March 2012.
Week 35 – Technical Stop and Restart
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Friday Morning 7:30 injection for fill 2908
Yesterday morning Held 1647 for a while – SPS kicker problem
Sunday
Saturday 7th May Sat – Sun night
Friday 23rd March 08:00 Access
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Tuesday morning 08:30-09:00 Squeeze with probe.
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Programme for Friday 9 July
Collimation qualification during the first weeks of the 2011 run
MD Planning Fri – Sat (1. – 2.7.)
Summary for LPC (March 7th, Ralph Assmann)
Fri :52 Stable beams fill #2536
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Tuesday – Morning and Evening
RAMP FOR COLLIMATOR SETUP
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
31/3/2010 Difficult day… but at the end stable beams.
Tuesday
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00 TI8 stability check 08:00 – 15:00 Check of b* at 0.7 m and 0.6 m 15:00 - 16:00 Splashes for ATLAS 16:00 - 17:00 energy feedback on orbit feedback successful (left operational) 17:39 Lost ramp, for crossing checks, at 3.8 TeV 20:58 Dump of beam after squeeze executed for the first time with nominal crossing and separation to the end 21:45 – 7:30 TCDQ and injection protection set-up 08:00 – 11:00 Access 23/03/2012 LHC 8:30 meeting

Check of beta* at 0.7 m and 0.6 m Beta-beat checked at beta* = 0.7 m the beta beat was slightly worse than at beta*=60 cm Use k-modulation at 0.6 m Procedure now works, but online calculation for beta* is not yet correct Results to come 23/03/2012 LHC 8:30 meeting

Machine Protection test Missing f-ref Triggered the dump of B1 by cutting the RF frequency to the LBDS: OK LBDS – TSU – IPOC: LHC Beam Dumping System – Trigger Synchronisation Unit – Internal Post Operational Check Dump Triggers 23/03/2012 LHC 8:30 meeting

Splashes for ATLAS “As you can see, the calorimeters and muon detectors were nicely illuminated, which allows us to time-align them.” 23/03/2012 LHC 8:30 meeting

Energy Feedback on Orbit: Working Left on for normal operation 23/03/2012 LHC 8:30 meeting

Ramp for testing of crossing through squeeze First ramp lost at 3.8 TeV due to losses on BLMQL.O8L2. B2I10_MQML Not really explained, unusual loss pattern It is on the msec time scale, could be something UFO-like B2 23/03/2012 LHC 8:30 meeting

Next Ramp Orbit difference between end of squeeze and collisions: one can see the collapsing of the separation the V crossing angle that comes in during the collision process (0 urad) the H crossing that is removed during the collision BP. 23/03/2012 LHC 8:30 meeting

Crossing into collision, with pilot The squeeze was executed for the first time with nominal crossing and separation to the end. The orbit was corrected (in H) at a couple of steps (3, 2 and 1 m) to remove local structures at the IRs (mainly IR5/8). The orbit FB worked fine and jumped correctly from one reference to the next. We must however introduce another reference orbit for the 7 m stop point, mostly because of the shape change in IR8. There is a tune shift of 10-3 to 10-4 depending on the beam and the plane ... that could be due to the tilted crossing angle effect in IP8. To be further investigated. No lumi measured 23/03/2012 LHC 8:30 meeting

TCDQ set-up at 450 GeV – not easy B1: Angular alignment for TCDQ: put angle on TCDQ from -200 to +200 urad and scraped the beam down record jaw position for full beam loss minimum gives correct angle and beam centre we find a minimum at -100urad Offset measurement between TCDQ and TCSG: offset of 0.6 mm ==> the TCDQ is further out by 0.6 mm: OK We had several times the problem that the offset between upstream and downstream corner became > 2mm for a requested angle the jaw is blocked and we need to call Christophe to reset it. To be investigated. We have to decide if we really want to apply this 100 urad angle with the risk of having the TCDQ blocked easily (unless this can be fixed) if we do not go for the 100 urad angle we have to redo the offset scan. B2 not fully conclusive Angular alignment for TCDQ.B2 - no minimum found for the angle range we can scan within the measurement accuracy no offset found between the TCDQ and TCSG collimators Jaw stuck because of drift of up and downstream LVDT beyond the 2mm allowed 23/03/2012 LHC 8:30 meeting

TCDQ – TCSG relative position – B1 23/03/2012 LHC 8:30 meeting

Access: 08:00 – 11:00 Need to clear the list! 23/03/2012 LHC 8:30 meeting

The Plan 23/03/2012 LHC 8:30 meeting