Injector Commissioning & Optimization

Slides:



Advertisements
Similar presentations
CEBAF Photoinjector: What’s new, what’s the same since HAPPEx 2004? What needs to be done? M. Poelker, HAPPEx collaboration meeting, Feb. 18, 2005.
Advertisements

Parity Quality Beam (PQB) April 07, Notes: 1.For each BPM, the wires are: +X+, +X-, +Y+, +Y- 2.There are only two injector BPMs we are not reading:
G 0 PC Installation and Beam Studies June & July 2006 Stephanie Bailey Riad Suleiman.
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
Electronic Cross-talk & Ground Loop Elimination in Injector Riad Suleiman Center for Injectors and Sources.
PQB Photocathode Analyzing Power Study May 19, 2009.
CEBAF Polarized Electron Source: Outlook & Horizon Operations Group Meeting May 13 th & 20 th, 2009 Joe Grames M. Poelker, P. Adderley, J. Clark, J. Grames,
JLab Polarized Source Happex Collaboration Meeting May 18, 2007 P. Adderley, J. Brittian, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
PAVI ’06 Milos May 20, 2006 Kent Paschke – University of Massachusetts Controlling Helicity-Correlated Asymmetries in a Polarized Electron Beam Kent Paschke.
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
Real-time Parity Feedback John Hansknecht & Riad Suleiman April 28, 2009.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Parity Quality Beam (PQB) Study Injector Group November 10, 2008.
/SC-PAC Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Joe Grames CEBAF Operations
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
Polarized Injector Status QWeak Collaboration Meeting February 1, 2010 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman, R. Suleiman,
Operated by Jefferson Science Associates, LLC for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Polarized Electron Beam.
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
Probing Hadron Structure at CEBAF Using Polarized Electron Scattering M. Poelker, Jefferson Lab APS Meeting, Dallas, TX, April 2006 Structure Functions,
Parity Quality Beam (PQB) Study Injector Group September 2008.
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
The CEBAF 200kV Inverted Gun P. Adderley, M. BastaniNejad, J. Clark, J. Grames, J. Hansknecht, J. McCarter, M. Poelker, M. Stutzman, R. Suleiman, K. Surles-Law.
Helicity Magnets Commissioning February 7, 2007 Hari Areti, Chao, Brad Cumbia, Jeff Dale, Richard Dickson, Joe Grames, Roger Flood, Scott Higgins, Matt.
G 0 PC Installation and Beam Studies Stephanie Bailey Riad Suleiman.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Parity Experiments and JLab Injector Riad Suleiman February 5, 2016.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
Status of GaAs Photoemission Guns at JLab M. Poelker, P. Adderley, M. Baylac, J. Brittian, D. Charles, J. Clark, J. Grames, J. Hansknecht, M. Stutzman,
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
Operated by Jefferson Science Associates, LLC for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Polarized Electron Beams.
November 17, 2008 A. Brachmann Slide 1 ILC polarized Electron Source R&D Update LCWS 2008 A. Brachmann, J. Sheppard, F. Zhou - SLAC National Accelerator.
Continuous Electron Beam Accelerator Facility Polarized e-Source - Talking Points for PV experiments: P. Adderley, M. BastaniNejad, J. Clark, S. Covert,
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
4 Laser Upgrade CEBAF 4 Hall Ops Joe Grames June 30, 2016 OPS Staytreat 2016 T. Allison, R. Bachimanchi, M. Bickley, W. Brinton, G. Croke, M. Diaz, L.
Polarized Injector Update
PIs: Riad Suleiman and Matt Poelker
Parity Violation Experiments & Beam Requirements
Joe Grames Center for Injectors and Sources
with help from Riad Sulieman, Arne Freyberger, and Joe Grames
CEBAF Injector Update PREX/CREX March 3-4, 2017
A Mini-Primer for Parity Quality Beam (as seen from the Accelerator)
DC Injector and Space Charge Simulation Status
G0 Backward Angle Accelerator Preparations
CEBAF Injector Overview
G0 Accelerator Planning Meeting (11/1/05)
Parity Violation Experiments at JLEIC
Parity Quality Beam (PQB)
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
QWeak Collaboration Meeting
Bleedthrough (sometimes we call it “leakage”) Ops Staytreat June 28 – 30, 2016 Matt Poelker with help from John Hansknecht, Reza Kazimi, Todd Satogata,
G0 PC Installation and Beam Studies
G0 PC Installation and Beam Studies
Production of Magnetized Electron Beam from a DC High Voltage Photogun
Qweak Coordination Meeting
Center for Injectors and Sources
Polarized Source Development Run Results
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
PIs: Riad Suleiman and Matt Poelker
Injector Studies Using Superlattice Photocathode
Polarized Source: Recent Activities
PQB Meeting March 05, 2009.
Electron Gun UP (EGUP) Plan
Beam Position Noise from 500 keV MBO0I06 Dipole Sensor
G0 PC Installation and Beam Studies
B-Team Meeting October 28, 2009
MEIC Polarized Electron Source
Spot-Size Reduction 4/5/2017.
Presentation transcript:

Injector Commissioning & Optimization QWeak Collaboration Meeting November 08, 2009

Team Coordinator: Suleiman Members: Poelker, Grames, Hansknecht, King, Carlini, Paschke, Ramsay Plan: Higher Voltage: Gun: Dec 2009, Test Cave CEBAF Beamline: May 2010 Electron Polarization Reversal: Commission at 100 kV during PREx, >100 kV in May 2010 New Helicity Board: Commission during PREx QWeak Pattern: May 2010 QWeak Reversal Rate: May 2010 (need target & Lumi) New IA (Charge Feedback): May 2010 (need analysis support)

Standard Parity Setup (May 2010) Laser Alignment of Pockels Cell: +HV & -HV Pitch, Yaw, & Roll x & y Stages IHWP IN/OUT Pockels Cell OFF Electron beam optimization (PQB): RHW Angle Photocathode Angle Injector Matching & Adiabatic Damping (Yves Roblin)

Issues Hall B is taking physics beam Need a student and a postdoc Hall A and Hall B beams crosstalk with Hall C. Charge feedback on Halls A and B beams. 32 MHz beam for background studies?