Vacuum in LER and HER. First estimation for the pumping system requirements A.Variola for B.Mercier, C.Prevost, F.Letellier.

Slides:



Advertisements
Similar presentations
1 Vacuum Pressure Calculations. 2 Vaccalc The program vaccalc was used for all calculations. The program required three pieces of information for each.
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Natural Broadening From Heisenberg's uncertainty principle: The electron in an excited state is only there for a short time, so its energy cannot have.
8 th January, 2007 European Linear Collider Workshop, DL, UK ILC DR Vacuum System Progress in ECLOUD Task (Goal 7) for the ILC DR Dr. Oleg B. Malyshev.
NLC - The Next Linear Collider Project Leif Eriksson 10/11/99 NLC BD VACUUM Thermal Outgassing Rate for Various Beam Line Materials.
First approach to the SuperB Rings M. Biagini, LNF-INFN April 26th, 2006 UK SuperB Meeting, Daresbury.
Basics of Vacuum Technology Unit: Pa = N/m 2 = J/m 3 UnitPa or N/m 2 bar10 5 mbar100 atm= 760 torr x 10 5.
VASCO (VAcuum Stability COde) : multi-gas code to calculate gas density profile and vacuum stability in a UHV system Adriana Rossi General equation VASCO.
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
John Amann – ILC Mechanical Engineering 11/13/06
26-28 August 2008 Final EUROTeV Scientific Workshop, Uppsala University, Sweden 1 ILC DR vacuum system related problems and solutions Oleg B. Malyshev.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
13/09/2005Vacuum Systems for Synchrotron Light Sources Workshop, Barcelona, Spain 1 Gas Flow Modelling in Design of the Vacuum System for of the Synchrotron.
DR Vacuum Component Overview April 25, 2012 Joe Conway.
SR Vacuum Systems and Front Ends
Vacuum studies at LAL Bruno Mercier, Christophe Prevost Alexandre Gonnin, Christian Bourgeois, Dirk Zerwas R.P. ILD MDI Meeting 24/3/15.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA The ANKA Vacuum System S.HermleA.Völker E.HuttelT.Fischböck.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
E. Steffens - PSTP 2007 (BNL)Summary ABS for Targets and Ion Sources1 Summary on „ABS‘s for Targets & Ion Sources“ Discussion Session Tuesday, ,
ICFA Workshop, December 9-12, 2003 Andreas Krämer - GSI Darmstadt1 Ion Beam Induced Desorption Yield Measurements at GSI The 13th ICFA Beam Dynamics Mini-Workshop.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Peter Spiller, GSI, ICFA workshop, Optimization of SIS100 Lattice and Dedicated Collimation System P. Spiller, GSI ICFA 2004 Bensheim
Status of the activities on vacuum system C. Garion TBMWG, 20/06/2012.
GSI vacuum group Who we are:
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
Cs 2 Te Photocathodes for CTF3 Photoinjectors R. LOSITO - CERN 4/10/2006.
Dynamic vacuum zero-order Dynamic vacuum requirement H 2 and CO 2 partial pressures < 1 nTorr (G. Rumolo and D. Schulte) BD meeting1Sergio Calatroni -
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Storage Ring Vacuum Systems H. Hseuh, Vacuum Group ASAC Review of NSLS-II.
Vacuum chamber fabrication Dates refer to end of fabrication, then 8 weeks are to be added for NEG coating, bake-out, acceptance tests, etc. EN-MME LNR.
1 MONTECARLO CALCULATIONS OF PRESSURE PROFILES FOR THE ESRF DIPOLE/CROTCH AREA R. Kersevan – Vacuum Group, Tech.Serv.Division, ESRF, Grenoble ALBA-MaxLab.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
Estimates of residual gas pressure in the LHC Adriana Rossi AT-VAC Workshop on Experimental Conditions and Beam Induced Detector Backgrounds April.
F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,
Electron Cloud Studies at DAFNE Theo Demma INFN-LNF Frascati.
E.B. Holzer BLM Meeting: Q & A March 20, Questions and Answers.
1 Vacuum in LER and HER. First estimation for the pumping system requirements (part II) A.Variola for B.Mercier, C.Prevost Annecy - Mars 2010.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
Vacuum Considerations on ESS-DTL Carlo Roncolato 06/09/2012 Istituto Nazionale Fisica Nucleare Laboratori Nazionali di Legnaro.
Synrad3D Photon propagation and scattering simulation G. Dugan, D. Sagan CLASSE Cornell University Ithaca, NY USA.
Space Charge Effects and Induced Signals in Resistive Plate Chambers
Vacuum System P. Chiggiato TE-VSC
INVESTIGATION OF NON-EVAPORABLE GETTER FILMS
Vacuum Leak Exercises CAS VACUUM, 6-16 June 2107
Vacuum Simulations for ELENA’s LNR-01 R. Kersevan IIC Meeting 9/6/2015
Vacuum Problems in the ILC Damping Ring
The PHIN Photoinjector for CTF3
Electron Cloud Effects in SuperB
G.Bregliozzi - VSC-LBV Section Collimation working group 08/07/02013
CLIC Damping ring beam transfer systems
CAS 2017 Vacuum simulations
Cryogenic temperature for SPPC
Update on out-gassing tests
PANDA Collaboration Meeting
Vacuum Issues for the HiLumi Triplets
Thermal Outgassing Rate for Various Beam Line Materials
The MICROMEGAS detector in CAST
CAS 2017 Vacuum simulations
SuperB General Meeting June , Perugia (Italy)
Collimation for beta-beams
Accelerator R&D Results from the B-factory
Status of CTC activities for the Damping rings
Hydrogen and Ultra-High Vacuum
TwinEBIS: Ion Source Modelling
Presentation transcript:

Vacuum in LER and HER. First estimation for the pumping system requirements A.Variola for B.Mercier, C.Prevost, F.Letellier

Approximation of the pressure distribution in Cell LER #2 at SuperB under static conditions Basic vacuum parameters Effective pumping speed? Nature of gas ? Neg strip or coat ?, …….? Same shape in all sections Conductance chamber (N2 at 20°C)  43 l.m.s-1 Perimeter chamber  54 cm Input data for VASCO program In all sections / baked copper in situ (A. G Mathewson et al, LHC project note 21 CERN) adjacent quadrupoles / effective pumping speed for unsatured starcell in dipoles and drift sections antechamber Holding pumping Half Holding pumping LAL Vacuum group - B. Mercier

Approximation of the pressure distribution in Cell LER #2 at SuperB after in situ baked copper chamber and static conditions With distributed pumping in dipoles and drift sections antechamber Without distributed pumping H2 H2 Pressure (mbar) Pressure (mbar) CO CH4 CO2 CO CH4 CO2 Distance (cm) Distance (cm)

Approximation of the pressure distribution in Cell HER #2 at SuperB under static conditions Basic vacuum parameters Effective pumping speed? Nature of gas ? Neg strip or coat ?, …….? Same shape in all sections Conductance chamber (N2 at 20°C)  35 l.m.s-1 Perimeter chamber  28 cm Input data for VASCO program In all sections / baked copper in situ (A. G Mathewson et al, LHC project note 21 CERN) adjacent quadrupoles / effective pumping speed for unsatured starcell Distributed NEG pumping in drift sections Distributed ion pumping in dipoles Holding pumping Half Holding pumping LAL Vacuum group B. Mercier

Approximation of the pressure distribution in Cell HER #2 at SuperB after in situ baked copper chamber and under static condition With distributed ion pumping in dipoles and with distributed NEG pumping in drift sections Without distributed pumping H2 H2 Pressure (mbar) Pressure (mbar) CO CH4 CO2 CO CH4 CO2 Distance (cm) Distance (cm)

Measurement of the intrinsic conductance of the LER dipole vacuum chamber by the Monte Carlo method (Molflow plus program) L = 1m Vm = 470.7 m.s-1 (N2@20°C ) average velocity for a Maxwell-Boltzman distribution A = 52.13 cm2 cross sectional area of the inlet aperture P = 7.6 % transmission probability Intrinsic conductance C  50 l.s-1 N2@20°C

Conclusions 1) First estimations for pumping system efficiency in HER and LER 2) W and Wo distributed pumping 3) Distributed pumping => LER = NEG, HER = Ionic. 4) Main partial pressure H2. ~few 10-10 5) LER methane stays at 10-11 level with NEG (HER no due to pumping). This should be the principal responsible for beam lifetime in Gas scattering (scales linear with mass number and quadratic with the charge number of the gas) 6) Need input of photon on walls, electron on walls to determine dynamic vacuum.