FEJF Meeting Day 1, 845a – Seattle, WA

Slides:



Advertisements
Similar presentations
Phase 1 – 2002 Fire Emissions Inventory FEJF Meeting September 8 – 9, 2004 Worley, ID – Coeur D’Alene Casino Resort Hotel Dave Randall ( x221;
Advertisements

WRAP 2002 Fire Emissions Inventory Inter-RPO Fire and Smoke Technical and Policy Coordination Meeting February 9-10, 2005 – Round Rock, TX Dave Randall.
BlueSky-EM, SMOKE and Data Linkages Andy Holland Carolina Environmental Program Symposium on Climate, Forest Growth, Fire and Air Quality Interactions.
1 Project Management & Project Management Software Yale Braunstein School of Information Management & Systems UC Berkeley.
System and Data Requirements for Fire and Air Planning Janice Peterson.
Western Regional Air Partnership Emissions Database Management System CERR Workshop San Francisco May E.H. Pechan & Associates, Inc.
Western Regional Air Partnership Emissions Database Management System Presentation to Fire Emissions Joint Forum Las Vegas, Nevada December 09, 2004 E.H.
WRAP Fire Emissions Tracking System Project Update, Outline, and Timeline WRAP - Fire Emissions Joint Forum Meeting San Diego, CA 22 February p.
PHASE II PROJECT Day 1 – 3:15p PHASE II PROJECT -- Ag Burning – Integration of QC responses -- NIF Format -- Plume Characteristics Update -- Next Steps.
1 WRAP Policy Fire Tracking Systems Draft December 9, 2002 FEJF Meeting December 10-11, 2002 Jackson, WY.
Fire Emissions Joint Forum –Section 308 Strategies for Fire Coordinating efforts of states changing or developing smoke management strategies for regional.
1 EPA Plans/Projects Involving Projections Marc Houyoux, US EPA Presentation to the RPO National Workgroup November 4-6, 2004 St. Louis, Missouri.
2004 Workplan WRAP Regional Modeling Center Prepared by: Gail Tonnesen, University of California Riverside Ralph Morris, ENVIRON Corporation Zac Adelman,
WRAP/FEJF Inter RPO Report WRAP - Fire Emissions Joint Forum Meeting San Diego, CA 22 February a – Presentation (c)
Effective Project Management: Traditional, Agile, Extreme Presented by (facilitator name) Managing Complexity in the Face of Uncertainty Ch08: How to Close.
EMEP/EEA Guidebook Project: Task 4ii Black Carbon Dr Chris Dore 13/05/2015.
February 23-24, 2005Salt Lake City, Utah1 In-house QC Semi-Automated Duplicate Checking, Large Fire Refinement Complex Fire Identification Phase 2 Fire.
WRAP/FEJF Phase III/IV Emissions Inventory Project WRAP - Fire Emissions Joint Forum Meeting San Diego, CA 22 February a – Presentation (a)
ENL1819T Progress Report Confidence in Our Success.
PHASE II PROJECT Day 1 – 1:15p PHASE II PROJECT -- Technical Refinements Large Fires Complex Identification Duplicates -- WF and Rx Fire QC Packets States,
Center for Environmental Research and Technology/Environmental Modeling University of California at Riverside Fire Plume Rise WRAP (FEJF) Method vs. SMOKE.
February 23-24, 2005Salt Lake City, Utah1 Rangeland Burning (Non-Federal Lands) Methodology Phase 2 Fire Emission Inventory WRAP – FEJF.
November 2, 2005San Diego, California1 Calculation Tool for Estimating Projected Emissions - Methods Roll Out – (Day 2 – ) Phase III/IV Project.
September 28, 2005Ph III/IV Project Team1 Phase III/IV Planning EIs Update and Status Report.
Introduction Session (Day 1 – ) Phase III/IV Project Technical Workshop #2 November 1-2, 2005 – San Diego, CA.
February 23-24, 2005Salt Lake City, Utah1 National Inventory Format NIF3 Methodology & Visual Display Phase 2 Fire Emission Inventory WRAP – FEJF.
1/13/20161 FETS: State of the System Providers, Features, Lessons Learned August 31, 2009 FETS Project Meeting Boise, ID.
Application of Fuel Characteristic Classification System to Ph II EI (add-on task to Inter RPO project) Fire Emissions Joint Forum Meeting Spokane, WA.
September 28, 2005Missoula, Montana1 Inter-RPO 2002 National Wildfire Emission Inventory - Results - by Air Sciences Inc. and EC/R, Inc. for the Inter-RPO.
Midwest RPO Area Source EI Comparability Project Mark Janssen – LADCO.
WRAP Workshop on Fire, Carbon, & Dust Emissions of Carbon from Fire Fire Emissions Joint Forum Presented by – Dave Randall, Air Sciences Inc. May 23, 2006.
1 Fire Emissions Inventories (almost) Closeout -- Ph IV Projections – Fire Emissions Joint Forum Meeting Spokane, WA Day 1 – 1015a part A Dave Randall.
Emissions Forum 2003/2004 Budget July 2, Emissions Forum 2003/2004 Budget Review status of 2003 projects Completed In process Not started Thoughts.
Audit Management: Audit Management consists of auditing the deliverables from the phases and tasks which is nothing but verifying the documents and to.
Lean Implementation Training Agenda Example
Status Report to the Stationary Sources Joint Forum:
CMGT 410 Possible Is Everything/snaptutorial.com
CMGT 410 Education for Service-- snaptutorial.com.
CMGT 410 Perfect Education/ cmgt410.com.
CMGT 410 HOMEWORK Perfect Education/ cmgt410homework.com.
CMGT 410 Teaching Effectively-- snaptutorial.com.
CMGT 410 HOMEWORK Education for Service-- cmgt410homework.com.
Project Organization Chart Roles & Responsibilities Matrix
Project Organization Chart Roles & Responsibilities Matrix
Confederated Tribes of the Colville Reservation
November 8, 2017 Presented by: Ron Schrotke
WRAP Regional Haze Progress Report & FEJF Projects/Budget
Annual Emission Goals for Fire
Every meeting has three parts: Ramp-Up, Meeting, Follow-Up.
Phase 1 – 2002 Fire Emissions Inventory
WRAP Regional Haze Grant Status, Technical Project Priorities, & Proposed Technical Analysis Forum Tom Moore WRAP Technical Coordinator Attribution.
SMOKE Improvements in version 2.0
Software Requirement and Specification
Effective Project Management: Traditional, Agile, Extreme
Phase 1 – 2002 Fire Emissions Inventory
July 11, 2006 / 3p Phase IV Projection Emission Inventories
Phase 2 – 2002 Fire Emissions Inventory
E.H. Pechan & Associates, Inc.
RMC Activity Update Emissions Forum July 1, 2003.
Fire Emissions Joint Forum
Inter-RPO 2002 Fire Emissions Inventory
Regional Haze SIP Status Report
Andy Ginsburg, Oregon DEQ
Fire Emissions and Smoke Management Plans
WRAP FY2006 Grant 1,302,555 WGA Travel and Project Management 522,095 NTEC Travel, Project Management 362,960 New Projects - WGA 265,000 New Projects.
Update on WRAP Input to NEI Re-Engineering Process
Fire Emissions Joint Forum February 9, 2005
Technical Review Workshop
EMODnet Chemistry 3 Reporting
Inter-RPO Projects Update
Presentation transcript:

FEJF Meeting Day 1, 845a – Seattle, WA Inter-RPO Wildfire EI FEJF Meeting Day 1, 845a – Seattle, WA

Project Status 2002 wildfire files delivered Draft documentation nearly complete Add-on tasks – 10-hour fuel moisture looked up and included in delivered files. FCCS application to WRAP inventory in progress. Added-value documentation tasks in-progress.

New Issue – Revised SCC Table For Phase II EI, FEJF developed its own SCC codes to accommodate NAT/ANTH designations for fire records. After InterRPO deliverable of WF data files, EPA gathered Rx data from RPOs. EPA noticed inconsistency between WRAPs SCC Lookup Table and EPA’s SCC code list.

Revised SCC Lookup Table – Main Concepts Overall - Consistent use of SCC for fire-types throughout country. Concept#1: Reserve last digit of *0* for unspecified fire purpose/use This gives consistency & doesn't interfere w/ existing codes Concept #2: Use *next to last* digit in SCC to distinguish between Flaming & smoldering emissions This won't interfere w/ existing codes and facilitates grouping of emissions by SCC

Next Steps Phase III/IV Task Team to review revised SCC table. Propose revisions to tables. Make decision to implement (or not) in Phase III/IV EI files.