Cryogenics – The Basics

Slides:



Advertisements
Similar presentations
Refrigeration Flow Control
Advertisements

Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
COMMERCIAL REFRIGERATION
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
STEAM HEATING.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
The Refrigeration Process
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Hall D Target System Review J. FochtmanSeptember 28,2011 Preliminary Design Work.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
EXTRACTION OF HIGH VOLUME CRYOGENIC HEAT LOAD
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Using Heat Part 2. Science Journal Entry 32 Explain the advantages and disadvantages of thermal expansion.
Overview of the ESS Linac Cryogenic Distribution System
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
James McIntyre VRF Training Manager V5 Key Components.
Michael A. Green and Heng Pan
Automotive Engines Theory and Servicing
Automotive Heating And Air Conditioning
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
SIS 100 Vacuum chamber Recooler String system Components
Final Design Cryogenic and mechanical configurations
LCLS-II Technical Requirements
How Does HNOSS Operate? Rocío Santiago Kern 20th May 2016.
R1 Fundamentals of Refrigeration
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
R1 Fundamentals of Refrigeration
Cryogenic behavior of the cryogenic system
Cryogenic Heater Controls in C100 Cryomodules
Proximity Cryogenics P&IDs meeting
N. Hasan1, P. Knudsen2 and V. Ganni2
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
EVAPORATIVE EMISSION CONTROL SYSTEMS
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Refrigeration Basics By: Mohamed Iqbal Pallipurath.
Question 1) Are two ports current leads?
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
Mathew C. Wright October 2016
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
R1 Fundamentals of Refrigeration
Mathew C. Wright January 26, 2009
R3 Controls, Valves, Accessories & Heat Pumps
R1 Fundamentals of Refrigeration
ESR 2 Presented to Joint Hall A/C Summer Meeting
By: JAGDEEP SANGWAN Refrigeration Basics 101.
Cryogenics – The Basics
Cryogenics – The Basics
LERF Readiness Review Ed Daly / Matt Marchlik
The Heat Pump-pumps heat from a cold area to a warmer area.
Cryogenic behavior of the magnet
ESR2 Process Cycle Design
How Refrigerators and Freezers Work
Cryogenic management of the LHC Run 2 dynamic heat loads
ESR2 Process Cycle Design
Presented by Michael Nagel
Presentation transcript:

Cryogenics – The Basics Lesson 5 Hall B DBX and Torus - LN2 Operation D. Kashy

Lesson 5 - Topics LN2 Supply from CHL/ESR ESR Valve Box Hall B Distribution Box (DBX) for LN2 Supply Torus flow paths and controls Return gas to vaporizers and vent What to look for if called in and what to do next Questions

Special NOTES The slides in this presentation are a snapshot in time. They give general principles of operation. The PID control loop settings may not be up to date so the operators must use the relevant spread sheets to verify recent and most proper settings. M:\hallb_eng\CLAS12\Magnets\Operations\Cryogenic Operations

Hall B Torus N2 Operation Liquid Nitrogen is supplied all the way from CHL via the ESTL (end station transfer line) which has a 4” vacuum jacket and 3”x2.5” IPS shield circuit that flow LN2. Inside that coaxial line is a 4.5K pipe that provides 3 atm supercritical helium boost for ESR The LN2 feeds 3 Halls and the ESR cold box

ESR Valve Box (part 1) Nitrogen Sub-cooler to send 4atm liquid at 77K (subcooled liquid). When it reaches the Hall it is most of the time two phase. LN2 supply flow meter, normal is ~0-30g/s) 4K Return Line with Cold Return Valve CEV6721B (must be shut upon long ESR outages to facilitate Hall B magnet recovery

Hall B Distribution Box (DBX) Green lines are Nitrogen lines. Nitrogen is used for cooling Helium to cool both the Torus, Solenoid from 300-80K and for the Torus shields 3 valves in the DBX are used during steady state operation of the entire N2 circuit of Hall B

Geometry is critical in LN2 system The ESR supply is ~20ft above the DBX and the transfer line slopes down to the Hall. This can and in Hall B does cause the transfer line to be “batch filled” This is because the TL holds a large volume ofLN2 (~250liters) Due to the heat load of the TL and the low use rate in Hall B, the sub-cooling of the valve box is not enough to keep the gas from boiling. The boil off then occupies the volume that is removed from the bottom of the reservoir instead of filling it with new cold (subcooled) liquid. This is why the flow rate is not constant

Supply Flow diagram TL Volume 250Liters CFI6751B To HX8558DC EV8553 To HX8558DC On Catwalk Then to vent behind ESR CFI6751B DBX Reservoir 80 liters LL8554CP

DBX LN2 Reservoir Supply Control – EV8553 Controls on LN2 level in the reservoir Min is manual at 4.5% provides small continuous flow Max is 65% sufficient to refill TL This tune works for Steady State, Cool down and Parking!

DBX LN2 Reservoir Pressure Control – PV8558 Controls on pressure in the reservoir at 1.5 atm, Min is manual at 1% provides small continuous flow and helps not to get stuck Max is 100 % sufficient to refill TL, typically opens to ~80% during batch fill This tune works for Steady State and Parking, during 300K -80K shield cool down we ran it at 1.7 atm

DBX LN2 Reservoir Heater Control – HTR8554 Controls on pressure in the reservoir at 1.1 atm, Min is zero and max is 40% The purpose is to assure we have flow in the vent line to keep the N2 system clean. (It does not come on- WHY?) This heater can also be used to boil LN2 during shield cool down from 300K (off topic here)

Torus Nitrogen supply Control – EV8555T High pressure (4atm) nitrogen (gas or liquid) at ~92K goes through a coil in the reservoir It is condensed or just cooled into sub-cooled liquid at ~4atm and 82K EV8555T supplies the liquid to the Torus based on supply temperature and liquid level Min PID controls on maximum allowable supply temperature at 92K to keep the U-tube from warming too much Primary loop controls on Reservoir Level in the Torus (next slide) This tune works for Steady State and Parking, Shield in Torus always runs unless warming to 300K!

Torus Nitrogen cooled radiation shields LN2 is supplied to the shields below a check valve under the reservoir This allows cool down w/o an extra valve Cooling was to be a thermosiphon, but works like forced flow with batch fill of tubes and reservoir Nitrogen vent goes through the DBX directly to the vaporizer HX8558M on the North side of Hall B then to atmosphere via check valve outside ESR through same 4” line as DBX vent

Typical parameters of N2 shield control

Torus Nitrogen cooled radiation shields - Details 8 parallel circuits each with its own return to the reservoir Coil C operates warmer than the others, but this has not bothered the 4K operation or powering the magnet Coil E showed similar warming during summer 2018 for a brief period but recovered When magnet 4K is off the shields all cool off to 77K outlets

Supply Controls – EV8111CD

What to look for and do if called in Check levels in DBX and Torus Check to see trends of temperatures and valve positions Go to Hall and look at vacuums of TL, DBX and U-tubes Make sure vacuum pumps on Torus are running and vacuums are good Call in experts if nothing can be found

N2 Summary Not working quite as designed, BUT does work well! No changes observed during any fast dumps No tuning of PID loops has been required for nearly 1 year

Questions?