Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.

Slides:



Advertisements
Similar presentations
LHC Fri 6 & Sat 7 Nov :00 End instabilities MD, dump to refresh air at dump TDE cavern 08:00 Access for vacuum team at the TDE starting 10:30 Access.
Advertisements

Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Wednesday
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Machine Coordinators: G. Arduini, J. Wenninger
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary of week 7 Hardware Commissioning:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 14th March Second fill with pilot + 3 nominal bunches
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Operational Issues L. Ponce.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Summary week 31 Week 31 G. Arduini & O. Brüning
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 13 G. Arduini, B. Holzer
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
LHC Morning Meeting - G. Arduini
Saturday 2/4/ :00-09:00 Problems with SPS:
LHC Status Sun Morning 20-Mai
Tuesday 20 March 2012.
Friday 14th December - morning
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Saturday 7th May Sat – Sun night
Friday 23rd March 08:00 Access
Programme for Saturday 10 July
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
LHC Morning Meeting - G. Arduini
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Summary week 18 Intensity ramp up & production
Saturday Nov Stop proton operation. Switch back to ions
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday 26th July 13:21 Fill 2880 beam dumped
07/08/2010 Fill #1264 dump at 02:14:38.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC - Week 38 Technical stop: Katy Foraz
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Monday 10th December - morning
Monday 27th August & night
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010 p @ 4TeV). For the time being forced relaxed safe beam flag (~1.2 ×1011 p @ 4TeV) and relaxed thresholds on noisy BPM: BMPSA.B4R6.B2  follow-up with BI for the BCT and BPMs problem

Saturday 18/3 Feed-forward on the orbit based on the previous ramp: - Applied 60% of the RT correction with an interval of 20 s. - Most changes occur around 1 TeV, as in previous years.\ Feed-forward on the tunes based on the previous ramp: - Applied 80% of the RT correction with an interval of 10 s. - FF takes out a tune bump between 100 and 200 s.

Saturday 18/3 No beam 2 from the SPS from 11:00 due to problem with extraction magnetic septum power converter Decided to go through the squeeze with beam 1 only

Squeeze to 60 cm Rather smooth. No lifetime dips. Rather gentle corrections required

Optics Optics measurements at 60 cm. Some work to do…

Damper setting-up 19:00: still no beam 2 from SPS  dump and go for damper setting-up (thanks Daniel!!) Summary of the ADT setting up: the re-cabled system (Hor. B2) was set-up and it is operational checked/adjusted loop parameters for all units Injection gap and abort gap cleaning is preliminarly set up (there was major intervention on this system during the TS). Transverse blow up available for both beams now (unfortunately there was not much time to test it tonight). The ADT is left loaded with settings for nominal intensity and 50ns or greater bunch spacing. The blow-up strength and mode is set to safe values (zero and OFF) so there is no accidental trigger before proper rbac roles are prepared.

Ramp and squeeze Beam 2 available in the evening Ramp and squeeze after damper setting –up (completed by 2 AM) Machine at 4 TeV very similar to 3.5 TeV 04:11 Spurious dump from unmaskable BLM channel in point 1

Status and (this was the…) Plan Optics measurements ongoing There will be a stop of the injector complex on Monday 19 March at 09:00 for about 2h for an intervention of EN/EL on the SPS cables. In the shadow of this a number of interventions are scheduled in the other machines (Linac2 RF tube change, TT2 for nTOF DSO tests, EN/CV intervention in the PS). Day Shift Time (h) Activity Breakpoint System/topic Beam SUN M 8 Optics measurements during the squeeze to 0.6 m  First squeeze with B2 Optics Probe A 4 Orbit at injection with nominal bunch and bumps   OP Nominal Experimental magnets ON N Orbit feedback with dynamic reference in the ramp Feedback Pre-cycle or ramp (no beam) - decay measurement at 450 GeV Magnets MON 6 No beam from the injectors from 9 to 11. Test ramp and squeeze

Latest news Smoke form SPS RF transmitter Possibilities of having pilot – single nominal bunch during the day being investigated Try to plan accordingly

Pending issues BPMSA.B4R6.B2 + BCT Noisy and giving spurious interlocks Vacuum gauge outgassing between Q6 and Q5.L5. V. Baglin investigating: likely vacuum gauge outgassing when switching ON Still some issues with chromaticity measurement and feedback displays  Ralph Suspected electrical problem on a fire detection unit in UX85. Access required at the next occasion.