Adaptive Airport Strategic Planning J.H. Kwakkel, W.E. Walker, V.A.W.J. Marchau 15 October 2008.

Slides:



Advertisements
Similar presentations
Strengthening innovation in chemical clusters
Advertisements

1 African Capital Markets and the Global Partnership for Development Abdoulie Janneh UN Under Secretary-General and Executive Secretary of ECA UN Regional.
Environment Accounts and Statistics Division Division des comptes et de la statistique de l'environnement Climate Change Indicators The Role of National.
1 Dr. Peder Jensen Project Manager, Transport and Environment TERM TERM Transport and environment: on the way to a new common transport policy.
Discussion of issues not covered by EU legislation Andrew Kelly European Regions Airline Association.
1 Dr. Peder Jensen Project Manager, Transport and Environment TERM TERM Transport and environment: on the way to a new common transport policy.
By: Michael A. Cirillo, Vice President, Air Traffic Organization, System Operations Services Date:March 27, 2007 Federal Aviation Administration Performance.
Concession Agreement Tirana International Airport Nene Tereza
ATFM Priorities Evaluation Study Alison Hudgell QinetiQ
By Noise Performance Metrics A View on the Situation at Amsterdam Airport Schiphol in 2003 M.E.S. Vogels National Aerospace Laboratory NLR Amsterdam, the.
March 2012 Ports and Cities Conference Newcastle Dorte Ekelund, Executive Director Major Cities Unit Department of Infrastructure and Transport
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
IBM Corporate Environmental Affairs and Product Safety
Safe and Sustainable Water Resources Research Integrate the existing Drinking Water and Water Quality research programs into one holistic program that.
Learning Objectives The changing face of U.S. business
Capacity Planning For Products and Services
Airports Commission Stakeholder Briefing: 20 th February 2013 Philip Graham Head of Airports Commission Secretariat.
1 Securing Cargo and Facilitating Trade The role of the airport Enno D. Osinga Senior Vice President Cargo Amsterdam Airport Schiphol.
Comprehensive Development Plan Sea-Tac International Airport Briefing to: Mediated Role Determination Committee April 20, 2006.
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
C HAPTER 11 S TRATEGY E VALUATION & C ONTROL S TRATEGIC M ANAGEMENT AND B USINESS P OLICY 11 th Edition Thomas L. Wheelen J. David Hunger.
Jelle van Minnen 20 June EPA IG Climate & Adaptation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Basic Concepts of Strategic Management
Yakima Air Terminal/McAllister Field Master Plan Airport Board Briefing May 21, 2012 YAKIMA AIR TERMINAL | McALLISTER FIELD | Yakima, WA 1.
CHAPTER 4 COLLABORATIVE ENVIRONMENTAL MANAGEMENT AND PARTICIPATION.
European Commission Slot allocation at Community airports Infrastructures and Airports Unit Klaas Pel.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
LMI Airline Responses to NAS Capacity Constraints Peter Kostiuk Logistics Management Institute National Airspace System Resource.
1 Directorate-General for Energy and Transport / Air Transport Directorate EU Directive on Airport Charges Background and content.
Operations Management Design of Goods and Services Chapter 5
January 10, 2001 Airport System Capacity and Demand Click to edit Master title style Airport System Capacity and Demand AMAC's 24th Annual AMAC/FAA Airport.
1 Changing attitudes and perceptions about older workers AGE - the European Older People’s Platform Changing attitudes and perceptions about older workers.
Sustainable Planning for Managing the Impacts of Mining at Moranbah and the Bowen Basin.
© Air Taxi Association, 2008, CONFIDENTIAL Air Taxi Association (ATXA) Image Source: © Respective Companies. As example only. Not for reproduction. Very.
THE SUSTAINABILITY OF AIRPORTS
1 Airport as an economic and spatial regional driver Airport of the Future; March 30, 2006 Meiltje de Groot; sr advisor Airport Development.
Basic Concepts of Strategic Management
Port Financial Management Challenges Financing Freight Transportation Improvements St. Louis, Missouri April 29 to May 2, 2001 Financing Freight Transportation.
THE 1 ST EASTERN AND SOUTHERN AFRICA PORTS ENVIRONMENTAL MANAGERS WORKING CONFERENCE PORT SUSTAINABILITY AND ENVIRONMENTAL CHALLENGES (A South African.
2011 PK Mwangi Global Consulting Forming a Strategy for your Business. Strategy refers to the plan that needs to be put in place to assist the business.
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
ICTs Tackling Climate Changes Dr. Amr Badawi Executive President NTRA.
NS4301 Political Economy of Africa Summer Term 2015 Special Economic Zones (SEZs)
UNDP Handbook for conducting technology needs assessments and Preliminary analysis of countries’ TNAs UNFCCC Seminar on the development and transfer on.
East Hampton Airport Safety, Noise and Operational Management Plan Peter J. Kirsch December 1, 2011.
Massimiliano Riva Istanbul, 19 November 2008 Trade and Human Development How to conduct trade needs assessments in transition economies.
Aviation Sector and Open Skies Chris Whittle IndII Wrap-up Conference 14 th June 2011.
1 of 27 How to invest in Information for Development An Introduction Introduction This question is the focus of our examination of the information management.
Elena Horská, Slovak University of Agriculture in Nitra The Scope and Challenges of International Marketing.
Federal Aviation Administration NextGen Environmental Management System (EMS)
Revolutionizing Aviation Pres Henne Senior Vice President, Programs Gulfstream Aerospace Corporation.
Airport master planning for infrastructure development Gabriel Hyde.
Risk Factors in Airport Financing in Challenging Times or If You Build It and They Don’t Come, Who Will Pay? 30 th Annual FAA Aviation Forecast Conference.
1.Introduction 2.Issues and crisis development 3.Defining Issue & crisis management 4. A significant link between issue, crisis & risk management 4. 8.
Prepared by Collaborative Economics. EXECUTIVE SUMMARY  San Diego is participating in a new global innovation economy  San Diego’s global reach has.
Water Management and Climate Change in the US- Mexico Border Region Robert Lempert Senior Scientist RAND September 27, 2008.
Globalization and Education Prepared by Dr. John McKeown.
April 9-11, 2001 Colloquium on Environmental Aspects of Aviation A European Perspective on Noise Ingemar Skogö.
Management Mustangs Strategic Brand Management Module - 5.
Port of Bellingham Briefing BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN BRIEFING April 2014.
Airports of Montenegro. General informations  Airports of Montenegro is a public enterprise established by the Government of the Republic of Montenegro.
1 SOLVING THE PROBLEM AVIATION FOR THE FUTURE. 2 SCRAA BOARD OF DIRECTORS County of Los Angeles - Supervisor Don Knabe County of Riverside - Supervisor.
Airport development Master plan
SESSION 5: Physical and Environmental Constraints Capacity Constraints in Japan and their implications for Liberalization MORISHIGE Toshiya Director,
Noise Maps and House Building – potential future influence on planning and design Peter Hepworth Tuesday 31st October 2006 Sustainable New Homes and.
SESSION 5: Physical and Environmental Constraints Capacity Constraints in Japan and their implications for Liberalization MORISHIGE Toshiya Director,
A European Perspective
Presentation transcript:

Adaptive Airport Strategic Planning J.H. Kwakkel, W.E. Walker, V.A.W.J. Marchau 15 October 2008

2 Outline Traditional airport strategic planning Problems with traditional airport strategic planning A synthesized approach for adaptive airport strategic planning (AASP) An illustration of AASP based on Schiphol Conclusions

3 Problems with traditional airport strategic planning why Master Planning fails The default approach to airport strategic planning is Master Planning: – Forecast aviation demand – Assess whether the airport can accommodate this demand – Design capacity expansions if necessary Problems: – Often only a single or few forecasts used – Based only on aviation demand – The resulting Master Plan is static Results: – Airport design is not adequate to accommodate actual demand – Plan is unable to be implemented – Response to unanticipated events is made in an ad-hoc manner

4 Problems with traditional airport strategic planning criteria for a new planning approach The planning approach should consider many different types of uncertainties, in addition to demand uncertainties The planning approach should consider many different plausible futures The resulting plan should be robust across the different futures The resulting plan should be flexible.

5 Adaptive Airport Strategic Planning a synthesized approach Key ideas found in literature – Real options – Adaptive planning process and framework – Proactive planning Synthesized approach is based on: – Determining a set of goals – Assembling a basic policy and identifying conditions for success – Identifying the policys vulnerabilities and opportunities, and ways of protecting or improving it – Monitoring progress towards the goals – Adapting the policy as conditions change

6 Adaptive Airport Strategic Planning an illustration based on Schiphol Schiphol has grown rapidly over the past 15 years Now: Major hub in Europe But: – Significant uncertainties in aviation industry – KLM-Air France merger – Competition among airports in Europe – Severe noise complaints – Accessibility is decreasing Planning for Schiphols long-term development is a challenge

7 Adaptive Airport Strategic Planning step I and step II: stage setting and the basic policy Stage Setting: – Objective: accommodate growth and minimize the negative effects of aviation in the region – Policy options: new runway or terminal, move part of operations elsewhere, change usage of the existing runways, add noise insulation Basic Policy: – Immediately implement plans to improve the efficiency of runway usage and reduce noise impacts – Immediately add noise insulation to surrounding residences – Develop plans for a new runway and new terminal, but dont implement the plans now

8 Adaptive Airport Strategic Planning step I and step II: stage setting and the basic policy Success conditions: – Demand should continue to grow – Population affected by noise and the number of noise complaints should not increase – Schiphols landside accessibility should not deteriorate

9 Adaptive Airport Strategic Planning step III: actions taken immediately to protect the basic policy Vulnerability 1: Demand should continue to grow – Shaping action: advertise for flying from Schiphol – Mitigating action: prepare plan to move charter operations to Lelystad Vulnerability 2: Population affected by noise and noise complaints should not increase – Hedging action: test noise abatement procedures outside peak periods – Shaping action: change the publics perception by branding Schiphol as an environmentally friendly airport Vulnerability 3: Landside accessibility should not deteriorate – Mitigating action: develop an early check-in and baggage handling system at rail stations – Shaping Action: invest in R&D into the accessibility of the Schiphol area

10 Adaptive Airport Strategic Planning step IV: future actions to protect the basic policy Monitoring Action 1: Monitor demand in terms of aircraft, passengers, and cargo, and the transfer rate – Demand increases faster than expected: Capitalizing Action: implement capacity expansions – Demand increases slower than expected Defensive action: diversify the carriers that fly from Schiphol Corrective Action: cancel capacity expansions – Demand breaks down or explodes Reassess (no protection possible)

11 Adaptive Airport Strategic Planning step IV: future actions to protect the basic policy Monitoring Action 2: Monitor developments in the Schiphol region in terms of noise complaints and population affected by noise – More noise complaints or population affected by noise than expected: Defensive action: increase branding, increase insulation program Corrective Action: limit the available slots – Fewer noise complaints or population affected than expected: Capitalizing action: increase the number of available slots

12 Adaptive Airport Strategic Planning step V: implementation Implement the basic policy and mitigating, hedging, seizing, and shaping actions Implement a monitoring system and start collecting signpost data In case of a trigger event, take prespecified action (defensive, corrective, capitalizing, or reassessment): – e.g., in case of faster growth in demand than expected, move charter operations to Lelystad – e.g., in case of increasing noise complaints, reduce slots, expand branding and marketing

13 Conclusions Airport Master Planning is inadequate for dealing with the many uncertainties airports are facing – Limited number of uncertainties are considered – For each uncertainty, only a small range is considered – Master Plan is static Adaptive Airport Strategic Planning (AASP) synthesizes several innovative ideas for the treatment of uncertainty – Many diverse uncertainties are considered – For each uncertainty, a wide range can be considered – AASP results in a flexible plan In particular, AASP prepares airports better for the unknown future