Dallas/Fort Worth CASA RADAR TEST BED

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

NIMS ICS All-Hazard Position Specific Training – A Way Forward A Special Presentation for the All Hazards IMT Conference Houston, Texas November 4.
Heartland Coast-to-Coast Corridor Study ___________________ Presented Sept. 11, 2007 Sanibel Harbour Resort Spa Heartland Coast-to-Coast Corridor Study.
Weather Forecasting This chapter discusses: 1.Various weather forecasting methods, their tools, and forecasting accuracy and skill 2.Images for the forecasting.
Chapter 13 Weather Forecasting.
2008 MTA NYC Travel Survey Summary of Selected Results June 22, 2009.
XV-RA V/Doc. 5.2(2) Expected Result: 11 EFFECTIVE AND EFFICIENT MANAGEMENT PERFORMANCE AND OVERSIGHT OF THE ORGANIZATION Strategic Plan for the Enhancement.
1 Ground Based Meteorological Radars Presented By: David Franc NOAAs National Weather Service September 2005.
Texas Healthcare Transformation and Quality Improvement Program 1115 Waiver Update Maureen Milligan, Deputy Director for Quality and Cost Containment for.
2008 NAIP Orthoimagery Update Chris Cialek MN Land Management Information Center May 7, 2008.
School Board Approved Budget: FY Submitted to Board of Supervisors for Approval Rockingham County Public Schools March 28, 2012 Slide 2.
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
CHARNWOOD FOREST LANDSCAPE PARTNERSHIP BID UPDATE Lesley Eddleston, Senior Landscape Architect Leicestershire County Council.
Training and Development Agency for Schools (TDA) Alison Kitson, Programme Leader (CPD)
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Who Wants To Be A Millionaire?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
NAS Brunswick Story Steve Levesque, Executive Director, MRRA September 26, 2013.
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
Library System Funding & Capital Projects Budget Issues Workshop February 21, 2012.
Surface Transportation Weather Research Center University of North Dakota Pavement Precipitation Accumulation Precipitation Data Sources Presenter: Mark.
WIND INSIGHT a wind power forecasting tool for power system security management Dr Nicholas Cutler 21 March 2013
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
1 Item 11, Presentation to the TPB, September 15, 2010.
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting September 18, 2013 Castallo and Silky- Education Consultants Bill Silky.
Chair, Fortune Green & West Hampstead Neighbourhood Development Forum
Mechanical & Electrical Golfers Society Annual Year End Awards Prysmian Cable Challenge.
1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
1 Storm Center ® Online Outage Map Tim Prince, Emergency Operations Bob Williamson, GIS Support
Presentation by Florida Citrus Sports Florida Citrus Sports.
Purpose To update the existing master plan To present development options for the airport To create an airport layout plan to document current and future.
Summary Human Dimensions Panel John Gaynor NOAA August 12,
Piedmont Regional Voice over IP Pilot Project Law Enforcement Information Management Conference Greensboro, N. C. May 21-24, 2007 Major Dean Hairston,
Virginia Department of Conservation and Recreation Adopting a Local Program in Accordance with the Revised Stormwater Regulations Appomattox County February.
P-16 Council Overall Goals Regional change agents for “Closing the Gaps” Engaging community stakeholders Parents K-12 teachers K-12 administrators College.
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
The Research for Patient Benefit (RfPB) Funding Programme Jon Scales - Research Advisor NIHR Research Design Service for the East of England HSS - University.
Example of a Decision Tree Problem: The Payoff Table
SDG&E ® Multi-Family Proposed Whole Building Performance Pilot Nathan Bruner Residential Customer Programs San Diego Gas & Electric ® October 21, 2011.
Equal or Not. Equal or Not
Slippery Slope
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Weekly Attendance by Class w/e 6 th September 2013.
1 June 13, 2013YMPO RTP Technical Advisory Committee Meeting.
Local Housing Assistance Plan Amendment State Fiscal Years Board of County Commissioners August 5, 2014.
Be a Part of Building a Weather-Ready Nation
Sensors in Sustainability Jim Kurose Department of Computer Science University of Massachusetts Amherst MA USA NSF WICS Workshop Salt Lake City.
Collaborative Adaptive Sensing of the Atmosphere: End User and Social Integration 2009 American Meteorological Association Summer Community Meeting Walter.
CLEAN FLEET VEHICLE PROPOSED PROJECTS DFW Clean School Bus Workshop September 13, 2006 Tamara Hollowell Transportation Planner Transportation Department.
Colorado State University
NOAA’s National Weather Service 2009 President’s Budget Rollout Jack Hayes NOAA Assistant Administrator & Director, National Weather Service National Weather.
The National Severe Storms Laboratory Jeff Kimpel, Director NSSL NOAA Science Advisory Board Norman, Oklahoma November 5, 2002.
Sebastián Torres Weather Radar Research Innovative Techniques to Improve Weather Observations.
Early Implementation of Coalition Initiatives ARK-LA-TEX Rail Summit May 9, Transportation Department North Central Texas.
NASA SPoRT’s Pseudo Geostationary Lightning Mapper (PGLM) GOES-R Science Week Meeting September, 2011 Huntsville, Alabama Geoffrey Stano ENSCO, Inc./NASA.
RAdio Detection And Ranging. Was originally for military use 1.Sent out electromagnetic radiation (Active) 2.Bounced off an object and returned to a listening.
Geoffrey Stano – ENSCO / SPoRT David Hotz and Anthony Cavalluci– WFO Morristown, TN Tony Reavley – Director of Emergency Services & Homeland Security of.
MADIS Airlines for America Briefing Meteorological Assimilated Data Ingest System (MADIS) FPAW Briefing Steve Pritchett NWS Aircraft Based Observations.
Gary Jedlovec Roadmap to Success transitioning unique NASA data and research technologies to operations.
Travis Smith Hazardous Weather Forecasts & Warnings Nowcasting Applications.
1 KURT HONDL, NSSL MPAR PROJECT MANAGER OFCM MPAR WORKING GROUP MEETING 19 JUNE 2012 NOAA/NSSL Activities.
Transitioning unique NASA data and research technologies to operations Short-term Prediction Research and Transition (SPoRT) Project Future Directions.
Evaluation of CASA (and other gap-filling) Radars Severe Weather Workshop for NWS Warning Decision Making - 11 July 2007 Kurt Hondl DOC/NOAA/OAR National.
Tuning an Analysis and Incremental Analysis Updating (IAU) Assimilation for an Efficient High Resolution Forecast System Keith A. Brewster1
Tuning an Analysis and Incremental Analysis Updating (IAU) Assimilation for an Efficient High Resolution Forecast System Keith A. Brewster1
High Speed Rail Update Transportation & Trinity River Project
Keith A. Brewster1 Jerry Brotzge1, Kevin W
CMAQ/STBG* FUNDING: FEDERAL/LOCAL FUNDING EXCHANGES
Collaborative Adaptive Sensing of the Atmosphere (CASA WX)
Presentation transcript:

Dallas/Fort Worth CASA RADAR TEST BED

CASA Motivation NEXRAD coverage at 3 km (10,000 ft) AGL. While radar beam travels essentially straight lines, the earth is curving down and away, leaving a low-altitude coverage gap. NEXRAD coverage at 1 km (~3200 ft) AGL.

CASA’s Solution snow wind tornado earth surface 40 80 120 160 200 240 RANGE (km) Dense networks of low power, dual pol, multi-Doppler, X-band radars High spatial and temporal resolution Adaptive scans based on weather, user needs and radar capabilities

What is CASA? National Science Foundation Engineering Research Center Academic, Government and Private Sector Partners NOAA is a CASA partner Developing new weather observation systems based on low-power, low-cost networks of radars. Transition research to operations. Year 8 of a 10-year research project

Comprehensive radar data in the lower atmosphere Purpose: Establish a radar network in the Dallas-Fort Worth area using CASA technology. Comprehensive radar data in the lower atmosphere Faster radar return rate Higher resolution Flood and Wind (thunderstorm, tornado) forecasts Flood and Wind decision support tools Base level radar data Public/Private Partnership

NEXRAD = 5 min between updates CASA = 1 min between updates Rapid, High Res. “smart” scans balance competing user needs for data adapt to changing weather RHIs, PPIs, dual Doppler, sector scans, within a volume scan Improved resolution, sensitivity, accuracy, and ability to support multiple users and multiple applications.

Collaborative Adaptive Scanning Meteorological Command and Control Full explanation May 14, 2009 Anadarko Tornado

Improve Forecaster/EM/Spotter Decisions EM Communicator CASA on AWIPS CASA on WDSS-ii NWS Forecaster NWS Chat Twitter EMs in Mobile EOC CASA/WXscope Spotters EM in EOC

Steering Committee City of Dallas City of DeSoto City of Fort Worth City of Grapevine City of McKinney City of Midlothian City of North Richland Hills City of Seagoville Collin County Denton County DFW Airport Johnson County Tarrant County National Weather Service North Central Texas Trauma Regional Advisory Council North Central Texas Council of Governments

Timeline May 2011 NCTCOG Approves Feasibility MOU with CASA June 2011 CASA WX Steering Committee August 2011 CASA WX Funding Subcommittee September 2011 NWS Funds $500K toward DFW Testbed Demonstration Projects

Timeline Continues October 2011 Commence relocation of Oklahoma test bed to DFW area November 2011 Finalize initial sites February 2012 Complete installation of initial four radar network March 2012 Demonstration network operational June 2012 Finalize second round of radar sites October 2012 Complete installation of second round of radars

PROPOSED RADAR LAYOUT

Metro Area - This is the recommend placement of the first four sites. Late winter 2012 – First 4 radars Summer 2012 – next 2 radars Fall 2012 – Next radar Winter – 2013 CSU The sites include UNT and UTA buildings, which have the best connectivity so far from all proposed sites and the FAA building, which is presumed to have good network access too. Covers the metroplex with very high resolution data, Covers the gap above the NEXRAD radar in Fort Worth. The north south orientation will capture storms coming from the northwest and into the metroplex, while the existing NEXRAD can give warning for storms coming from the southwest. Provides unprecdented low level coverage of the trinity river for flooding, and accurate precipitation estimates. Also provide coverage of rivers, lakes to the north which impacts precipitation estimates. Very fast updates (1 Min) for rapidly evolving severe weather in the Metroplex. Disadvantages: CASA will provide very low coverage, but some coverage provided by NEXRAD. This system will focus more on real time data vs. forecasts. Which airports are we covering in addition to DFW and Love Field. FIRST FOUR SITES: Site 7: UNT Discovery Park, Denton Site 3: Alliance Airport, FAA building Site 11: University of Texas, Arlington Site 2: TBD – Carrollton, near G. Bush Tpk. And Kelly Blvd Blue – submitted sites Green, Yellow : new sites 14

Site 5: Terrell Municipal Airport Site 9: Mesquite Metro Airport Northeast Expansion - This configuration continues coverage over highly populated areas and gets into areas where there is more of a radar gap. NEXT FOUR SITES Site 5: Terrell Municipal Airport Site 9: Mesquite Metro Airport Site 13: McKinney Public Safety Building Site 3: TBD - Near Farm to Market Rd. 2755 and County Rd. 536 15

Option #1: Expand to South West as one continuous network Southwest Expansion. After the first eight radars, we could expand into the southwest which would provide more high resolution nowcasts and forecasts in the metroplex.. We could also consider going to the south west before going to the northeast. We do not have any site identified in this area. Option #1: Expand to South West as one continuous network TOTAL NETWORK SIZE = 12 RADARS 16

Option #2: Expand to SW as two disjoint networks This is another possibility for southwest expansion that would incorporate the existing Nexrad radar, and also get us into more of a radar gap area and provide forecasts and nowcasts into the metroplex. Option #2: Expand to SW as two disjoint networks TOTAL NETWORK SIZE = 12 RADARS 17

Plan for Covering the Whole COG Area Add 3 radars to connect the disjoint networks. Add 3 radars to expand in South East direction. Add 2 radars to expand in North East direction (including Commerce High School and one new site TBD at Merit, near Farm to Market Rd. 36 and County Rd. 1126) TOTAL NETWORK SIZE = 20 RADARS 18

Proposed Demonstration Projects Public Response to Severe Weather Warnings Neighborhood-based Flash Flood Warnings Development of Impacts-based Weather Information Emergency Management Training

Proposed CASAWx Budget Phase/year Operations Costs Demonstration Costs   Category NCT Region Sites* CASA Local, Federal and Private Partners Subtotal Ops Costs NCT RegionD CASA D Local, Federal and Private Partners D Subtotal Demo costs Total Project Phase Costs Relocation $ 77,500 $ 200,000 $ 300,000 $ - $ 577,500 $ - $ 400,000 $ - $ 400,000 $ 977,500 One $ 185,000 $ 75,000 $ 560,000 $ 1,100,000 $ 500,000 $ 1,600,000 $ 2,160,000 Two $ 250,000 $ 130,000 $ 100,000 $ 555,000 $ 700,000 $ 950,000 $ 1,650,000 $ 2,205,000 Three $ 380,000 $ 1,650,000 Four Five Total $ 1,652,500 $ 575,000 $ 730,000 $ 400,000 $ 3,357,500 $ 2,200,000 $ 6,400,000 $ 8,600,000 $ 11,957,500 O&D cost share 49.2% 17.1% 21.7% 11.9% 100.0% 0.0% 25.6% 74.4% Total cost share 13.8% 4.8% 6.1% 3.3% 28.1% 18.4% 53.5% 71.9% *includes in-kind contributions from host jurisdictions

Total Project Cost Projections Five year project timeline

CASA Wx Demonstration Cost Share Five year project timeline

CASA Wx Operations Cost Share *Includes in-kind costs, Five year project timeline

CASA Wx Total Project Cost Share *includes in-kind costs fro host jurisdictions, Five year project timeline