Tulip City Airport Airport Master Plan Update Work Team Meeting April 30, 2009 Holland, Michigan.

Slides:



Advertisements
Similar presentations
Part 139 Training 1.
Advertisements

Prepared for: Ohio Department of Transportation Office of Aviation Prepared by: April 11, 2006 R.D. Zande CCI.
A brief history In line with the LRST Recommendation contained in the European Action Plan for the Prevention of Runway Incursions, ENAV laid.
Modeling Airport Capacity
Airport Planning and Design
Vance Brand Municipal Airport
AMG 1204 Airport Management By Zuliana Ismail, 2010.
Purpose To update the existing master plan To present development options for the airport To create an airport layout plan to document current and future.
How Are Airport Context and Service Related to General Aviation Aircraft Operations? Transportation Research Board Conference January 16, 2002 Peter A.
Airport Sustainability Planning Charlie McDermott, LEED AP Planning Department Manager C&S Companies.
DANVILLE CITY COUNCIL WORK SESSION AUGUST 3,
Regulatory Landscape for Leased Federal Airports Archerfield Airport Community Aviation Consultation Group (AACACG) 2 November 2011 Helen Gannon Aviation.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
ADO 1 Office of Airports Airport Geometrics Airports Division, Western Pacific Region.
By: Nurhan Tan, NAS Planning & Integration Date: Sept. 16, 2009 Federal Aviation Administration ACA Association of California Airports Conference S. Lake.
Yakima Air Terminal/McAllister Field Master Plan Airport Board Briefing May 21, 2012 YAKIMA AIR TERMINAL | McALLISTER FIELD | Yakima, WA 1.
Federal Aviation Administration 1 35 th Annual Airports Conference – April 3, 2012 FAA Air show Waiver Reviews Presentation to: Name: Date: 35 th Annual.
Presented to: MWCOG By: Roger Schaufele Date: 09 April 2008 Federal Aviation Administration General Aviation Forecast Overview
Solar Guidance for Airports: Information for Sponsors on Developing Airport Compatible Solar Projects Association of California Airports September 16,
0 MONTEREY PENINSULA AIRPORT A SPECIAL PRESENTATION TO THE REGIONAL AIRPORT PLANNING COMMITTEE June 27, 2008 FLY MONTEREY.
OHIO AVIATION ASSOCIATION April 22, WELCOME AND INTRODUCTIONS Dave Dennis – Aviation Planner, ODOT Office of Aviation; Project Manager for Focus.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
General Aviation Myths & Realities: Preparing Your Airport for What’s Ahead April 20,2010 SEC-AAAE Annual Conference.
Auburn-Lewiston Municipal Airport Runway 4-22 Safety Area Environmental Assessment May 10, 2011.
Air Transportation A Management Perspective
Textbook Reviews By Aj.Weerawit Lertthaitrakul Logistics & Supply chain management Business Administration Air Transportation A Management Perspective.
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
RST processes Session 6 Presentation 3. A framework for RST processes Establishing an RST Membership Terms of reference Work programme (schedule, agenda,
Ballina Byron Gateway Airport Presentation November 2012.
“LEGAL ISSUES ASSOCIATED WITH AN RSA PROJECT” Mark Bautista Deputy General Manager Monterey Peninsula Airport David Prentice Scott Huber Stephanie Alford.
CHAPTER-10 AIRPORT PLANNING.
OSU Airport – Overview of Master Plan and Draft Environmental Assessment Purpose of an Airport Environmental Assessment (EA) Identify environmental impacts.
AMG 1204 Airport Management By Zuliana Ismail, 2010.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Working Paper One/ Study Committee Meeting May 2015.
Valkaria Airport Master Plan Update Public Information Meeting February 25, 2015 Viera Government Center.
Investing in Airports in Tough Economic Times Mark Heusinkveld 28 May 2009 Lodz, Republic of Poland European Sky over Poland Ministry of Infrastructure.
October 18-20, 2010 LONG BEACH, CALIFORNIA
Federal Aviation Administration ATO Future Schedule Generation Performance Analysis and Strategy January 27, 2010.
Federal Aviation Administration Friedman Memorial Replacement Airport EIS Date: August 6, 2008.
East Hampton Airport Safety, Noise and Operational Management Plan Peter J. Kirsch December 1, 2011.
08 June 2006 Portland 2006: aircraft certification session Yves Morier The EASA Advance -NPA for UAV systems Certification Presentation by: Y Morier EASA.
SAFETY MANAGEMENT SYSTEMS GAP ANALYSIS SURVEY FOR U.S. AIRPORTS
State Safety Inspections and Sponsor Expectations.
Definition: Preliminary Geometric Design of an Airport in Palestine.
AIR & SPACE TRAVEL CONTINENTAL US FLIGHT OPERATIONS PROVIDE GENERAL AVIATION SERVICES PROVIDE FLIGHT PLANNING SUPPORT Request Flight Plan Request User.
LECTURE 4: ICAO CHART requirements
Runway Safety Action in Australia Merv Fowler National Towers Manager Airservices Australia 13 September 2005 Merv Fowler National Towers Manager Airservices.
NASA ARAC Meeting Update on Next Generation Air Transportation System May 3, 2005 Robert Pearce Deputy Director, Joint Planning & Development Office.
Airport master planning for infrastructure development Gabriel Hyde.
Airport FAA 5010 Safety Inspections What does that mean???? Inspectors are responsible for reporting accurate information about all landing facilities.
AERODROMES npor. Tereza Holubová. CONTENT Aerodrome classification Civilian Military Aerodrome description Facilities Lighting system Domestic aerodrome.
PRESENTATION TO: CITRUS COUNTY BOARD OF COUNTY COMMISSIONERS 11 AUGUST 2015 INVERNESS AIRPORT MASTER PLAN UPDATE.
Port of Bellingham Briefing BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN BRIEFING April 2014.
WELCOME D EMAND D RIVERS S TUDY November 12, 2015.
Airports of Montenegro. General informations  Airports of Montenegro is a public enterprise established by the Government of the Republic of Montenegro.
Airport Design Introduction Some Stats  2013: 7.3 million flights to top 77 US airports (ATL is largest at 445,000 arrivals and 445,000.
OAA PRESENTATION February 7, WELCOME AND TEAM INTRODUCTIONS Dave Dennis – ODOT Office of Aviation Jim Bryant – ODOT Office of Aviation Chuck Dyer.
Draft Environmental Assessment Report for Bradley International Airport October 2016
Airports Division Great Lakes Region Overview of Airfield Capacity
Airport Planning.
Airport Design Introduction
What is the Value of Planning for My Airport?
McKinney Airport Master Plan Update April 3, 2018
Pierre Regional Airport Master Plan Update
Information Meeting May 29, 2019.
3 Steps Toward Our BOCC Recommendations
ASE Vision Committee Meeting
Presentation transcript:

Tulip City Airport Airport Master Plan Update Work Team Meeting April 30, 2009 Holland, Michigan

Agenda Introductions Work Team responsibilities Purpose of the project Planning process Existing condition of facility Design criteria Data collection User inputs Next steps of project Questions

Mead & Hunt Founded in 1900 Aviation services since 1940s Provides services in: Architecture Engineering Planning Environmental Air Service Financial Planning

Work Team Responsibilities Work Team responsibilities include: Representing the interests of their stakeholders Representing the best interests of the community Assisting the project team with sharing and collaboration of information Providing input for project team Reviewing and commenting on project progress

Purpose of the Project Meet FAA requirements for planning documents: Master Plan Reviews existing conditions Provides guidelines for future development Airport Layout Plan Map of existing facilities Recommends locations for future development

Planning Process Project coordination & communication Data collection & inventory Projects of operations & demand Facility requirements Alternative analysis Environmental overview Estimates of probable cost Public information process Master Plan Report & ALP plan set

Data Collection Existing Facilities Chapter 1 Aircraft Reference Code Design Criteria Aircraft Operations Existing Projections User Surveys Based aircraft Itinerant users

Existing Facilities Runway 8/26 6,264 feet long by 100 feet wide HIRL, PAPI, & REIL Runway 26 has ILS Terminal 2,000 square feet Hangars Corporate and private aircraft hangars Tulip City Air Service Provides FBO services

Aircraft Reference Code AIRPORT REFERENCE CODES Aircraft Approach Category Category AApproach speed < 91 knots Category B91 knots to 120 knots Category C121 knots to 140 knots Category D141 knots to 165 knots Category E166 knots or more Airplane Design Group Group IWingspan < 48 feet Group II49 feet to 78 feet Group III79 feet to 117 feet Group IV118 feet to 170 feet Group V171 feet to 213 feet Group VIGreater than 214 feet B-I: Piper Navajo Chieftain B-II: Cessna Citation Bravo D-II: Gulfstream IV A-I: Cessna 172 Tulip City Airport is categorized as a D-II facility

Airport Design Runway Protection Zone (RPZ) – Enhances protection of people and property on the ground Runway Safety Area (RSA) – Enhances safety of aircraft that overshoot, undershoot, or veer off a runway Object Free Area (OFA) – Requires protruding objects to be cleared from the edges of the safety area Building Restriction Line (BRL) – Identifies suitable building area locations on airports RPZ RSA OFA BRL RWY TWY

Airport Operations Airport Operation Forecasts: General trends Operations by fleet mix Based aircraft Methods of forecasting: Terminal Area Forecasts (TAF) Market Share Socioeconomic Based Aircraft Year Itinerant Air Taxi Itinerant GA Itinerant Military Local Civil Total Airport Ops 20064,30021, ,26052,520 Year Single EngineJet Multi- EngineHelicopterOtherTotal Airport Operations Based Aircraft Source: FAA APO Terminal Area Forecast

User Inputs Needed/desired facilities Airside Runway length Runway orientation Navigational aids Instrument approaches Landside Terminal building improvements Hangars Services

User Inputs Operational Data Number of aircraft operations Types of aircraft Frequency of use Users dependence of airport Personnel Cargo Clients Review sample surveys

Next Steps Next steps: Create survey Refine survey Define recipients of survey Conduct survey Assess results Projections based on findings Work team meeting to review

Questions? Any questions/comments? Contact info: Stephanie Ward or Zachary Puchacz at: (517)